Defueled Physical Security Plan Request for Withdrawal of Security Orders
ML043210477
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/09/2004
From: Bouchard G
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, NRC/FSME
References
-RFPFR, CY-04-1 76, FOIA/PA-2005-0203
Download: ML043210477 (2)


Text

- r -

>ONNECTICUT YANKEE ATOMIC POWER COMPANY X N VHADDAM EC NECK PLANT 362 INJUN HOLLOW ROAD

  • EAST HAMPTON, CT 06424-3099 NOV 9 2U0 Docket No. 50-213 CY-04-1 76 Re: 10CFR73.5 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck-Plant Defueled Physical Security Plan Request for Withdrawal of Security Orders Pursuant to 10CFR50.54(p) and 10CFR50.4(b)(4) Connecticut Yankee Atomic Power Company (CYAPCO) is informing the Nuclear Regulatory Commission (NRC) of a future change to the Security Plan for the Haddam Neck Plant (HNP). All spent fuel is expected to:be transferred to the Independent Spent Fuel Storage Installation (ISFSI) by February 2005.' Followin'g thtEitran'sfer of all'spent fuel; CYAPCO'will be revising'h'e Security Plan requiremen'its to eliminate the security eq'ir are associated with The Spent Fuel 'Building Protected Area.' The security plan requirmen'ts that are associated with the ISFSI Protected Area'will remain and will be unaffected by the change.

CYAPCO, therefore, requests that the Security Orders 1) t2)applicable to decommissioned plants with spent fuel in the spent fuel pool be withdrawn once all spent fuel has been removed from the pool and transferred to the ISFSI. Our response(3)(4)(5) to these Orders will no longer be applicable and associated

-commitments will no longer be implemented since the spent fuel pool will be empty.

The spent fuel pool is scheduled to be drained and the storage racks removed in S. J. Collins (USNRC) letter to K. J. Heider (CYAPCO), 'Issuance of Order for Interim Safeguards and Security Compensatory Measures for Haddam Neck Plant," dated May 23, 2002.

(2) M. V. Federline (USNRC) Letter to K. J. Heider (CYAPCO), 'Issuance of Order for Implementation

... of Additional Security Measures Associated with Access Authorization for Haddam Neck Plant" dated August 18i 2004. .:1..; -* . K - .- :. is:,, ,

( K. J. Heider (CYAPICO) letter to U. S. Nuclear Regulatoi'yCommission, -"Haddam Neck Plant, Responseto'NRC Security Order fo6Decomrrmissione-dPlanis," dated Jun6e 1,'2002 -

K ':Heider (CYAPCO) letter toU.S: N6cle'r'R 6gdlutdIraCommis'ior,-K"Haddam' Neck Plan{,

. SdI'pliTiental Information Reip'ie t'o NRC S6curitiy Order-f6r becom'mirssion'd Plants," dated Dedcember4,'2002.. ::. -. . i-(5)W. A. Norton (CYAPCO) Letter to Nuclear Regulatory Commission, "Response to Order for.

Implementation of Additional Security Measures Associated with Access Authorization", CY 178, dated September 2, 2004.

U. S. Nuclear Regulatory Commission CY-04-176 / Page 2 2005 in preparation to decommission the building. CYAPCO understands that upon termination of the Orders and revision of the security plan, the spent fuel pool will no longer be an authorized storage location for spent fuel.

Compliance with the Security Orders(6)(7) applicable to plants with spent fuel stored in an ISFSI will continue as will compliance with our responses(8)(9)(10)(11) to the ISFSI related Orders.

An evaluation of this change in accordance with 10CFR50.54(p) has determined that it does not reduce that safeguards effectiveness of the plan and, as a whole, the plan continues to meet the standards of 10CFR73.55 as applicable.

In conclusion, CYAPCO hereby requests NRC to rescind the NRC security orders for decommissioned plants contingent upon transfer-of-all fuel to-the-ISFSI. Transfer of spent fuel assemblies is expected to be complete by February 2005. CYAPCO plans to implement the security plan changes within 60 days after transfer of the last spent fuel assembly from the spent fuel pool to the ISFSI.

If you should have any questions regarding this submittal, please contact Mr. G. P.

van Noordennen at (860) 267-3938.

Sincerely, Gary H. oucbar Date Director, Nuclear Safety/Regulatory Affairs cc: S. J. Collins, NRC Region I Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region I E. L. Wilds, Jr., Director, CT DEP Monitoring and Radiation Division (6) M. J. Virgilio (NRC) letter to K.J. Heider (CYAPCO), 'Issuance of Order for Interim Safeguards and Security Compensatory Measures for Haddam Neck Plant."dated October 16, 2002.

(7) M. V. Federline (USNRC) letter to W. A. Norton (CYAPCO), "Issuance of Order for Implementation of Additional Security Measures Associated with Access Authorization for Haddam Neck Nuclear Plant," dated August 18, 2004.

(8) K. J. Heider (CYAPCO) letter to U.S. Nuclear Regulatory Commission, "Haddam Neck Plant, Response to NRC ISFSI Security Order for Decommissioned Plants," dated October 29, 2002.

(9)K. J, Heider (CYAPCO) letter to U.S. Nuclear Regulatory Commission, 'Haddam Neck Plant, Supplemental Response to NRC ISFSI Security Order," dated February 26, 2003.

'°) K. J. Heider (CYAPCO) letter to U. S. Nuclear Regulatory Commission, 'Haddam Neck Plant, Supplemental Response to NRC ISFSI Security Order," dated April 8, 2003.

W.

W" A. Norton (CYAPCO) letter to U. S. Nuclear Regulatory Commission, 'Response to Order for Implementation of Additional Security Measures Associated with Access Authorization for the ISFSI, CY-04-179, dated September 2, 2004.