ML043200229

From kanterella
Jump to navigation Jump to search
Arkansas, Units 1 and 2 - Entergy Operations, Inc., Confirmation of Implementation of April 29, 2003, Orders to Arkansas Nuclear One
ML043200229
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/08/2004
From: Eubanks C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-03-038, OCAN110401
Download: ML043200229 (3)


Text

Entergy Operations, Inc.

1448 S.R. 333 Enterg Russellville, AR 72802 Tel 479-858-5000 OCAN110401 November 8, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

Entergy Operations, Inc. - Confirmation of Implementation of April 29, 2003, Orders to Arkansas Nuclear One Arkansas Nuclear One Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

REFERENCES:

See Below

Dear Sir or Madam:

The NRC issued Orders dated April 29, 2003: EA-03-038, Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel; EA-03-039, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearns Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel; and EA-03-086, Order Requiring Compliance with Revised Design Basis Threat (collectively referred to as "Orders") for Arkansas Nuclear One (ANO). In addition to other requirements, the Orders required nuclear power plant licensees to revise their physical security plans, safeguards contingency plans, and security force training and qualification plans; submit those plans to the NRC for approval by April 29, 2004; and complete implementation of those plans by October 29, 2004, unless a request for a schedule extension for one or more elements of those plans was approved by the NRC.

On October 4, 2004 (OCAN100402), Entergy filed a Supplemental Response to Order EA-03-086 that contained the Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan as required by Order EA-03-086 for ANO. By letter dated October 28, 2004 (OCNA100404),

the NRC issued a Safety Evaluation Report documenting the NRC's review and acceptance of those plans.Section III.C. of Order EA-03-086 required Entergy to advise the NRC when implementation of the NRC approved physical security plans, safeguards contingency plans, and general training and qualification plans had been accomplished.Section III.C.2. of Order EA-03-39 required Entergy to advise the NRC when full compliance with the requirements in Attachment 2 to that Order has been achieved.

Entergy hereby certifies that those conditions have been met, and the exercise of enforcement discretion pursuant to the Orders during the transition period will no longer be necessary.

as 0 O

OCAN1 10401 Page 2 of 3 This letter includes no new commitments. Should you have any questions concerning this submittal, please contact Ms. Natalie Mosher at (479) 858-4635.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 8th day of November 2004.

Respectfully submitted, Cliff Eubanks General Manager, Plant Operations CE/nbm REFERENCES Updated Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses dated October 4, 2004 (OCAN1 00402)

April 29, 2004 (OCAN040404), letter to Document Control Desk, Supplemental Response to the April 29, 2003, Orders to Entergy NRC Letters from Samuel J. Collins to Holders of Licenses for Operating Power Reactors as listed in Enclosure 2, dated April 29, 2003, Regarding Issuance of Order Requiring Compliance with Revised Design Basis Threat (EA-03-086), Issuance of Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel (EA-03-039) (OCNA04031 0, OCNA04031 1)

V OCAN 110401 Page 3 of 3 cc:

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 05-E-07 One White Flint North 11555 Rockville Pike Rockville, MD20852-2738 Office of the Secretary U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205 U. S. Nuclear Regulatory Commission Attn: Mr. Tom Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001 Assistant General Counsel for Materials Litigation and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Martin J. Virgilio Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847