ML043150305
| ML043150305 | |
| Person / Time | |
|---|---|
| Site: | Limerick (NPF-039, NPF-085) |
| Issue date: | 11/10/2004 |
| From: | Bryan Hanson Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002 | |
| Download: ML043150305 (3) | |
Text
T.S. 6.9.1.6 November 10, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Monthly Operating Report for October 2004 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of October 2004 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of October 2004 for Units 1 and 2.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, Original signed by Bryan C. Hanson Bryan C. Hanson Plant Manager-LGS Attachments cc:
S. Collins, Administrator, Region I, USNRC S. Hansell, LGS USNRC Senior Resident Inspector
Unit:
Limerick 1 Docket No:
50-352 Date:
11/10/04 Completed by: Greg Lee Telephone:
(610) 718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-October 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 745.0 6,925.17 145,491.64 Hours Generator On-Line (Hours) 745.0 6,881.38 143,462.58 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 869,539.00 7,821,717.00 149,648,006.0 B.
UNIT SHUTDOWN No.
Date (yymmdd)
Type Generator Off-line Duration (hrs)
Reason Method Corrective Actions/Comments None during October 2004
SUMMARY
Unit 1 began the month of October 2004 at 100% of rated thermal power (RTP).
On October 15th at 22:35 hours, reactor power was reduced from 99.9% to 99.3% RTP because of a deficiency with the feedwater flow measurement.. Limerick submitted LER 1-04-002 concerning an overpower event discovered on September 15, 2004.
Unit 1 ended the month of October 2004 at 99.3% RTP.
Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
C.
SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During October 2004
Unit:
Limerick 2 Docket No:
50-353 Date:
11/10/04 Completed by: Greg Lee Telephone:
(610) 718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-October 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 745.0 7,289.13 121,739.23 Hours Generator On-Line (Hours) 745.0 7,270.02 119,957.74 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 853,068.00 8,265,265.00 129,286,631.00 B. UNIT SHUTDOWN No.
Date (yymmdd)
Type Generator Off-line Duration (hrs)
Reason Method Corrective Actions/Comments None During October 2004
SUMMARY
Unit 2 began the month of October 2004 at 98.3% of rated thermal power (RTP) in power ascension following a load drop to repair the 5A Feedwater Heater.
On October 1st at 03:58 hours, reactor power was restored to 100% RTP with the 5A Feedwater Heater removed from service.
On October 2nd at 09:07 hours, reactor power was reduced from 99.7% to 98.6% RTP for 2B Recirculation Pump MG Set maintenance. At 11:12 hours, reactor power was restored to 100% power.
On October 3rd at 09:10 hours, reactor power was reduced from 100% to 97.5% RTP for 2B Recirculation Pump MG Set maintenance. At 14:34 hours, reactor power was restored to 100% RTP.
On October 16th at 22:04 hours, reactor power was reduced from 99.1% to 71.1% RTP for channel distortion testing and removal of the 6A Feedwater Heater from service.
On October 17th at 22:29 hours, reactor power was restored to 99.9% RTP.
Unit 2 ended the month of October 2004 at 99.9% RTP.
Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During October 2004