ML043060415

From kanterella
Jump to navigation Jump to search
Reactor and Senior Reactor Operator Initial Examinations Turkey Point Nuclear Plant - 05000250/2005301 and 05000251/2005301
ML043060415
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/25/2004
From: Moorman J
Operator Licensing and Human Performance Branch
To: Stall J
Florida Power & Light Co
References
50-250/05-301, 50-251/05-301
Download: ML043060415 (5)


See also: IR 05000250/2005301

Text

October 25, 2004

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

TURKEY POINT NUCLEAR PLANT - 05000250/2005301 AND

05000251/2005301

Dear Mr. Stall:

In a telephone conversation on October 25, 2004, between Mr. Greg Laughlin, Operations

Training Manager, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made

for the administration of licensing examinations at Turkey Point Nuclear Plant during the weeks

of February 21 and 28, 2005. The on-site preparatory week is scheduled for the week of

February 7, 2005.

As agreed during the telephone conversation, the NRC will prepare the examinations based on

the guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." Your staff will be given the opportunity to review the examinations during the

week of January 24, 2004.

I would like to thank members of your staff for supplying us with some of the reference

materials, identified in Attachment 2 of ES-201, in advance. However, to meet the above

schedule, the remaining reference materials identified in Attachment 2 of ES-201, must be

furnished by November 15, 2004. Mr. Russell is aware of the remaining reference materials

that is required per the attachment. Any delay in receiving the required reference materials, or

the submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. If any additional material is required, we will contact the appropriate members of

your staff.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

2

FP&L

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2006. The public reporting burden for this collection of information is estimated to average 50

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to

the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Laughlin has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Edwin Lea at (404) 562-4567, or myself

at (404) 562-4647.

Sincerely,

/RA By G. Hopper For/

James H. Moorman, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPR-41

cc: (See page 3)

3

FP&L

cc cont'd:

T. O. Jones

Site Vice President

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Walter Parker

Licensing Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Michael O. Pearce

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

David Moore, Vice President

Nuclear Operations Support

Florida Power & Light Company

Electronic Mail Distribution

Rajiv S. Kundalkar

Vice President - Nuclear Engineering

Florida Power & Light Company

Electronic Mail Distribution

M. S. Ross, Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi, Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

William A. Passetti

Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

County Manager

Metropolitan Dade County

Electronic Mail Distribution

Craig Fugate, Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Curtis Ivy

City Manager of Homestead

Electronic Mail Distribution

Mr. Mike Baughman

Training Manager

Turkey Point Nuclear Plant

9760 SW 344th Street

Florida City, FL 33035

4

FP&L

Distribution:

E. Brown, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA By G. Hopper for/

/RA/

NAME

ELea:pmd

JMoorman

JMunday

DATE

10/25/04

10/25/04

10/25/04

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: E:\\Filenet\\ML043060415.wpd