Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 OCT 1 5 2004 LR-N04-0424 0 PSEG Nuclear LLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 2 THIRD TEN-YEAR INSERVICE INSPECTION PROGRAM SUBMITTAL FACILITY OPERATING LICENSES DPR-75 DOCKET NO. 50-311 The second ten-year interval of the inservice Inspection (ISI) Program for Salem Generating Station - Unit 2 ended November 23, 2003. Pursuant to the requirements of 10CFR50.55a, enclosed is the Salem Generating Station - Unit 2 third ten-year Interval ISI Long Term Plan (Volumes A, B, and C). The Third Interval ISI Program is described in detail in Volume A (Inservice Inspection Program Summary). The associated ISI
,ablon - Destructive Examination (NDE) boundary diagrams are also included. Any relief requests will be submitted on an as needed basis.
In accordance with 10CFR50.55a(g)(4)(ii), the ISI program for Salem Generating Station
- Unit 2 was revised to comply with the requirements of the latest edition and addenda of the ASME Code incorporated by reference in 1 OCFR50.55a(b)(2) twelve months prior to start of the third ten-year interval. The latest edition of the ASME Code referenced by paragraph (b) of 10CFR50.55a at4hat time was the 1998 Edition through the 2000 Addenda except for Subsection IWE and IWL that will comply with the 1998 Edition through the 1998 Addenda.
PSEG Nuclear requests NRC approval of the Salem Generating Station - Unit 2 Third Ten-Year Interval ISI Program Plan by March 1, 2005, to support the Spring 2005 Refueling Outage (2R14).
Should you have any questions regarding this request, please contact Michael Mosier at 856-339-5434.
S-I C
tiaL er no Director - Licensing and Nuclear Safety
Enclosures:
Salem Unit 2 Third Ten-Year Interval ISI Long Term Plan (Volumes A,B, and C) 95-2168 REV. 7199/
' LR-N04-0424 2
Document Control Desk C
All without enclosure Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Collins, Project Manager-Hope Creek/Salem U.S. Nuclear Regulatory Commission Mail Stop 08C2 Washington, DC 20555-0001 USNRC Senior Resident Inspector-Salem (X24)
Mr. K. Tosch Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625