Committed to NuoearExceIl' Palisades Nuclear Plant Operated by Nuclear Management Company, LLC October 13, 2004 EA-03-CG86 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Schedule Update For Completion of Actions Related to NRC Security Orders

Reference:

Letter from Nuclear Management Company, LLC (NMC) to Document Control Desk, "Supplemental Response to the April 29, 2003, Orders to Palisades Nuclear Plant," dated April 29, 2004 In the referenced letter, NMC submitted an implementation schedule for Order EA-03-086 and other security-related Orders for the Palisades Nuclear Plant (PNP).

Some interim completion dates provided in the implementation schedule have been revised to be consistent with the required overall implementation date of October 29, 2004 for Order EA-03-086.

In addition, it was subsequently determined that the Owner Controlled Area (OCA)

Surveillance System is not required for PNP to be in compliance with the Order.

Although this item will be completed in the future, it will not be completed prior to October 29, 2004.

Revisions to the implementation schedule are summarized below:

ITEM PREVIOUS DATE REVISED DATE Implementation of NRC Order EA-03-086 08/18/04 10/29/04 OCANVBS and Channeling 05/18/04 10/29/04 Checkpoint and Active Barrier System 06/22/04 10/29/04 Defensive Positions and Barrier Delays 08/18/04 10/29/04 OCA Surveillance System 08/18/04 N/A 27780 Blue Star Memorial Highway . Covert, Michigan 49043-9530 Telephone: 269.764.2000

Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on Octobe -, 2PO ./

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC CC Administrator, Region 111, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC