FENOC First Energy Nuclear Operating Conpany 76 South Main Street Akron, Ohio 44308 Low W. Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 October 11, 2004 PY-CEIINRR-2836L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the September 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
10/7104
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period September 2004
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
- 8.
Hc
- 9.
H(
- 10.
UF
- 11.
NE This Month Yr-to-Date ours Reactor was Critical 720.0 6.272.7 ours Generator On-Line 720.0 6.242.4 nit Reserve Shutdown Hours 0.0 0.0 at PEcftricai Pnprv IMWaHl 879 Q42.0 7.628.152.0 mulative 118.517.4 115.753.7 0.0 7565R 64.
I..
VE~
w
.kU
.... -I,.
Page 1
UNIT SHUTDOWNS REPORT MONTH - SEPTEMBER 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/7/04 CONTACT: T. Phelis TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2;
3 I
I
SUMMARY
- The Perry Nuclear Power remained on line the entire month of September, 2004.
- 1. TYPE:
- 2. REASON:
- 3. METHOD:
F: Forced A-Equipment Failure (explain)
I - Manual S: Scheduled B - Maintenance or Test i 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4 - Continuation E - Operating Training &