September 2004 Monthly Operating Report for Perry
ML042940427
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/11/2004
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2836L
Download: ML042940427 (3)


Text

FENOC First Energy Nuclear Operating Conpany 76 South Main Street Akron, Ohio 44308 Low W. Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 October 11, 2004 PY-CEIINRR-2836L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the September 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

10/7104

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period September 2004

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

7.

Maximum Dependable Capacity (Net MWe):

1260 1235

8.

Hc

9.

H(

10.

UF

11.

NE This Month Yr-to-Date ours Reactor was Critical 720.0 6.272.7 ours Generator On-Line 720.0 6.242.4 nit Reserve Shutdown Hours 0.0 0.0 at PEcftricai Pnprv IMWaHl 879 Q42.0 7.628.152.0 mulative 118.517.4 115.753.7 0.0 7565R 64.

I..

VE~

w

.kU

.... -I,.

Page 1

UNIT SHUTDOWNS REPORT MONTH - SEPTEMBER 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/7/04 CONTACT: T. Phelis TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I

Hours 2;

3 I

I

SUMMARY

The Perry Nuclear Power remained on line the entire month of September, 2004.
1. TYPE:
2. REASON:
3. METHOD:

F: Forced A-Equipment Failure (explain)

I - Manual S: Scheduled B - Maintenance or Test i 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4 - Continuation E - Operating Training &

5 - Other License Examination F - Administrative G - Operational Error (explain)

H -Other (explain)

X i

I I

II i

i I

I II Page 2 I