ML042940268

From kanterella
Jump to navigation Jump to search
September 2004 Monthly Operating Report for South Texas Project, Units 1 and 2
ML042940268
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/14/2004
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02, NOC-AE-04001802, STI: 31797254
Download: ML042940268 (14)


Text

Nuclear Operating Company October 14, 2004 NOC-AE-04001802 File No.: G02 10CFR50.71 STI: 31797254 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for September 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for September 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - September 2004

2)

STPEGS Unit 2 Monthly Operating Report - September 2004

cc:

(paper copy)

(electronic copy)

Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service Michael K. Webb U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT SEPTEMBER 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 A

/1413 4

  • G.L. PARKEY Da Approved By:

MONTOLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT I DATE Oct. 5 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS 1.

2.

REPORTING PERIOD: 9/1/04 - 9/30/04 GROSS HOURS IN REPORTING PERIOD:

720 CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None REASONS FOR RESTRICTION (IF ANY): N/A 3.

4.

THIS MONTH YR TO DATE CUMULATIVE

5.

NUMBER OF HOURS REACTOR CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

NET ELECTRICAL ENERGY GENERATED (MWH)

11.

REACTOR SERVICE FACTOR (%)

12.

REACTOR AVAILABILITY FACTOR (%)

13.

UNIT SERVICE FACTOR (%)

14.

UNIT AVAILABILITY FACTOR (%)

15.

UNIT CAPACITY FACTOR - Using MDC (%)

16.

UNIT CAPACITY FACTOR - Using DER (%)

17.

UNIT FORCED OUTAGE RATE (%)

720.0 0

720.0 0

918.693 100.0 100.0 100.0 100.0 102.0 102.0 0.0 6.519.9 0

6,503.8 25.128.505 8.305.199 99.2 99.2 98.9 98.9 101.0 101.0 1.1 110.535.4 0

108.831.3 0

408,095,962 133,380 036 78.3 78.3 77.1 77.1 75.6 75.6 14.0 18.

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT I

DATE Oct. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH SEPTEMBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 1276 1277 1277 1276 1274 1273

  • 1274 1277 1279 1277 1277 1277 1276 1276 1275 1276 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL (MWe-Net) 1270 1267 1271 1274 1275 1277 1273 1278 1279 1280 1280 1280 1280 1277

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50498 1

Oct. 5. 2004 R.L. Hill 361-972-7667 REPORT MONTH SEPTEMBER 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report#

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT SEPTEMBER 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 G.L.

Dal I I Approved By:

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE Oct. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS

1.

REPORTING PERIOD: 9/1104 - 9/30/04 GROSS HOURS IN REPORTING PERIOD:

720

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS THIS MONTH 720.0 0

720.0 0

GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%s)

UNIT CAPACITY FACTOR - Using DER (%)

UNIT FORCED OUTAGE RATE (%)

2,784.899 913.769 100.0 100.0 100.0 100.0 101.5 101.5 0.0 YR TO DATE 5.929.9 0

22.759,595 7.476,192 90.2 89.9 89.9 90.9 90.9 0.7 CUMULATIVE 107.634.4 0

105.318.0 394.447.701 128.574.369 80.3 80.3 78.6 78.6 76.7 76.7 13.3

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Oct. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH SEPTEMBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1270 2

1271 3

1271 4

1270 5

1269 6

1269 7

1269 8

1271 9

1273 10 1272 11 1270 12 1271 13 1271 14 1270 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1267 18 1261 19 1267 20 1266 21 1269 22 1270 23 1270 24 1270 25 1272 26 1270 27 1250 28 1272 29 1272 30 1271 15 16 1271 1270

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Oct. 5, 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH SEPTEMBER 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

I I

I I

I 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.