ML042870261
| ML042870261 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/23/2004 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Roush K Susquehanna |
| Conte R | |
| References | |
| 50-387/04-302, 50-388/04-302 | |
| Download: ML042870261 (3) | |
Text
September 23, 2004 Mr. Kenneth M. Roush, Manager Nuclear Training PPL Susquehanna, LLC Susquehanna Learning Center 769 Salem Boulevard Berwick, PA 18603-0467
Dear Mr. Roush:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on August 6, 2004, and the walkthrough (overall) and simulator operating tests administered August 9 through August 16, 2004 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Twelve individuals were administered the examination and eleven passed. However, we will not be issuing licenses for four of the applicants who passed until you inform us they have completed the eligibility requirements for which they were issued waivers. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Facility Docket No(s). 50-387/50-388 Facility License No(s). : NPF-14, NPF-22
Mr. Kenneth M. Roush 2
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
B. T. McKinney, Vice President - Nuclear Site Operations
Mr. Kenneth M. Roush 3
Distribution: w/o enclosures:
Master Exam File DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042870261.wpd ADAMS PKG: ML030900773 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBixler /RA/
JDAntonio /RA/
RJConte /RA/
DATE 9/23/04 09/23/04 09/23/04 OFFICIAL RECORD COPY