SEPTBMBER 29,2004 Please Deliver TO; Mr. James L. Caldwell Regianal Administrator Location:

U.S. NRC Region III

Subject:

Advance Copy - Gary R. Leidich Letter - 29 September 2004 -

RE: Public Meeting Request Fax:

630-5 15-1096 Phone:

630-829-9657 From:

Gary R. hidich Number of pages:

(including cover).......3 IF you do not receive aIl pages, please call Ted Burgner, 330-761-7890.

4+

J I

FENOC -

76 Sourh Main Street Ahon, Ohio 44308 Gaiy R. Leidich Presidenr and Chiof Nuclear Otlicer September 29,2004 PY-CET/OIE-0 620L Mi. James L. Caldwcll Regional Adminisbator United States Regulatory Commission Rcgion III 2443 Wmenville Road, Suite 210 Lisle, IL 60532-4352 Mr. Samuel J. Collins Regional Administrator United States Regulatory Commission Region 1 475 Allendale Road King of Pruasia, PA 19406-1415 Perry Nuclear Power Plan1 Docket No. 5040 Davis-Besse Nuclear Power Station Docket No. 50-346 Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 bockct No. 50-334, License No. DPR-66 BV-2 Docket No. 50412, License No. NPF-73

. Gentlemen:

This letter confirms our conversations requesting a public meeting to rcview FirstEnergy Nuclear Operating Companys (FENOC) overall performance. While the recent classification of the Perry Nuclear Power Plant into the Multiple/Degrd.ed Cornerstone certainly provides a near-term catalyst for further discussion, OUT industry benchmarking also finds that periodic public meetings (perhaps annually) between the U.S. Nuclear Regulatory Commission and the licensee at the fleet level are productive.

Our staffs (through Region ILL) are working on dates and logistics for the meeting. I would offer the proposed topics bc covered as we begin to formulate the agenda:

e Brief.presentation of the overall FENOC fleet strategy, approach and plan 0

Summary of 2004 progress, fleet-wide and each plant, including the Nuclear Oversight perspective

e PIans going forward 2005-07, fleet-wide and each plant, including the Nuclear Oversight perspective 4

Challenges we face and what we are doing to overcome them Open discussiodQuestion &Answer The above approach is merely a starting point and we welcome your input on ropics you would like to be sure we cover in the meeting. The Akron office will continue to remain your point of contact on ths particular session.

We look forward to a productive meeting.

Sincerely, GRL:twb 2