ML042730269
| ML042730269 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/29/2004 |
| From: | Rowley J NRC/NRR/DRIP/RLEP |
| To: | Nazar M Indiana Michigan Power Co |
| Rowley J, NRR/DRIP/RLEP, 415-4053 | |
| References | |
| Download: ML042730269 (5) | |
Text
September 29, 2004 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Nazar:
By letter dated October 31, 2003, Indiana Michigan Power Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
Based on discussions with Mr. Richard Grumbir of your staff, a mutually agreeable date for your response is within 30 days from the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at 301-415-4053 or by e-mail at jgr@nrc.gov.
Sincerely,
/RA/
Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
As stated cc w/encl: See next page
ML042730269 DISTRIBUTION: See next page Document Name: C:\\ORPCheckout\\FileNET\\ML042730269.wpd OFFICE RLEP:GE RLEP:LA RLEP:SC-A NAME J. Rowley YEdmonds S. Lee DATE 9/28/04 9/28/04 9/29/04
DISTRIBUTION: Ltr. to M. Nazar, Dated: September 29, 2004 Accession No: ML042730269 HARD COPY RLEP RF J. Rowley (PM)
E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Marco J. Strasma, RIII OPA
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4351 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Director, Design Engineering and Regulatory Affairs Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Laura Kozak 2443 Warrenville Rd.
Lisle, IL 60532 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michael J. Finissi, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Richard J. Grumbir Project Manager, License Renewal Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
Enclosure DONALD C. COOK NUCLEAR PLANT (CNP), UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIs)
RAI 3.1.2-4 In CNP LRA Section 3.1.2.2.6 and Table 3.1.1-11, the applicant credits CNP AMP B.1.27, Reactor Vessel Internals Plates, Forgings, Welds, and Bolting Program, to manage changes in dimension due to void swelling of reactor vessel internals.
In CNP LRA Table 3.1.2-2, Page 3.1-51, the applicant credits the Reactor Vessel Internals (CASS) Program to manage distortion of the lower support plate and lower core plate support column cap in a treated water environment. Additionally, in LRA Appendix B, Sections B.1.27, Reactor Vessel Internals Plates, Forgings, Welds, and Bolting Program, and B.1.28, Reactor Vessel Internals Cast Austenitic Stainless Steel, the applicant describes the program description for each as managing the aging effect of distortion due to void swelling.
The staff requests the applicant to update LRA Section 3.1.2.2.6 and Table 3.1.1 item number 11 to include the Reactor Vessel Internals (CASS) Program with managing this aging effect or justify why it should not be credited with managing this aging effect.