Technical Specifications, to Delete Surveillance Requirements for Power Range, Intermediate Range and Source Range Neutron Flux Monitors
ML042720297
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/23/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC2474, TAC MC2475
Download: ML042720297 (4)


Text

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible count rate circuit to be OPERABLE.

APPLICABILITY: MODE 6.

ACTION:

a. With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:

a. A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. A CHANNEL CALIBRATION at least every 18 months.*
  • Neutron detectors may be excluded from CHANNEL CALIBRATION COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-2 AM ENDMENT4-A,WA, 283

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.10 SPECIAL TEST EXCEPTIONS PHYSICS TESTS LIMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.4 and 3.1.3.5 may be suspended during the performance of PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, and
b. The Reactor Trip Sctpoints for the OPERABLE Intermediate Range, Neutron Flux and the Power Range, Neutron Flux, Low Setpoint are set at less than or equal to 25% of RATED THERMAL POWER.

APPLICABILITY: MODE 2.

ACTION:

With the THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trip breakers.

SURVEILLANCE REOUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than or equal to 5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.

4.10.4.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST prior to initiating PHYSICS TESTS.

PLANT-UNIT II Page 3/4 10-5 AMENDMENT , 4OZii NUCLEAR PLANT-UNIT COOK NUCLEAR Page 3/4 10-5 ANIENDINIENT Z8,4AZ83

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible count rate circuit to be OPERABLE.

APPLICABILITY: MODE 6.

ACTION:

a. With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1 .2.7.b.2.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REOUIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:

a. A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. A CHANNEL CALIBRATION at least every 18 months.*
  • Neutron detectors may be excluded from CHANNEL CALIBRATION COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-2 AM ENDM ENT 62,40-7, 3, 267

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.10 SPECIAL TEST EXCEPTIONS PHYSICS TEST LIMITING CONDITION FOR OPERATION 3.10.3 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, and
b. The Reactor Trip Setpoints for the OPERABLE Intermediate Range, Neutron Flux and the Power Range, Neutron Flux, Low Setpoint are set at less than or equal to 25% of RATED THERMAL POWER.

APPLICABILITY: MODE 2.

ACTION:

With the THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trip breakers.

SURVEILLANCE REQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.

4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST prior to initiating PHYSICS TESTS.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 10-3 AMENDMENT 4-,40i, 267