SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. George A. Williams Vice President Operations, GGNS Entergy Operations, Inc.
Grand Gulf Nuclear Station, Unit 1 P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NO. MC2924)
Dear Mr. Williams:
On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.
The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilitys physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.
Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.
Sincerely,
/RA/
Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response
Enclosure:
As stated cc: See next page Docket No.: 50-416 WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties NOTICE: Enclosure transmitted herewith contains Safeguards Information. When separated from Enclosure(s) this Cover Document is DECONTROLLED
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. George A. Williams Vice President Operations, GGNS Entergy Operations, Inc.
Grand Gulf Nuclear Station, Unit 1 P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NO. MC2924)
Dear Mr. Williams:
On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.
The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilitys physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.
Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.
Sincerely,
/RA/
Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response
Enclosure:
As stated cc: See next page Docket No.: 50-416 DISTRIBUTION:
SPRT R/F RFretz DHuyck JCreed BBenney BVaidya ACRS OGC MBurrell DSpaulding RManili PPeduzzi MChernoff NKalyanam RGramm HBerkow AHowell, RIV ADAMS Accession Number: ML042680180 OFFICE SPRT/LA SPRT SPRT SPRT NAME CHawes JPeralta JNakoski SMorris DATE 9/20/04 9/20/04 9/20/04 9/20/04 OFFICIAL RECORD COPY
Grand Gulf Nuclear Station cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, DC 20005-3502 Chief Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P. O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors P. O. Box 339 Port Gibson, MS 39150 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 399 Port Gibson, MS 39150 General Manager, GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 Attorney General Department of Justice State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005 State Health Officer State Board of Health P. O. Box 1700 Jackson, MS 39205 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Asst. Attorney General State of Mississippi P. O. Box 22947 Jackson, MS 39225 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Mr. George A. Williams Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150