September 23, 2004 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Myers:
In a telephone conversation on September 16, 2004, Mr. M. Brogan, Perry Station Licensed Operator Requalification Program Lead Instructor, and Mr. D. McNeil, Reactor Engineer, made arrangements for the NRC to inspect the licensed operator requalification program at the Perry Nuclear Power Plant. The inspection is planned for the week of November 15, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. Mr. Brogan has been provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
L. Myers In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9631.
Sincerely,
/RA by Michael Bielby Acting for/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc:
G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department F. von Ahn, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health R. G. Collings, Training Department
L. Myers In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9631.
Sincerely,
/RA by Michael Bielby Acting for/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc:
G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department F. von Ahn, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health R. G. Collings, Training Department DOCUMENT NAME: G:DRS\\
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MBielby for DMcNeil:sd MBielby for RLanksbury DATE 09/23/04 09/23/04 OFFICIAL RECORD COPY
L. Myers ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS