ML042660048
| ML042660048 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/10/2004 |
| From: | Myers L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, PY-CEI/NRR-2827L | |
| Download: ML042660048 (3) | |
Text
FENOC FirstEnergy Nuclear Operating Company 76 South Main Street Akron, Ohio 44308 Lew W Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 September 10, 2004 PY-CEI/NRR-2827L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the August 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, ;
W.VMyrs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
- I I
Z
I§62LI
OPERATING DATA REPORT UNIT:
FErr_
DATE:
9/3/04
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period August 2004
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260
- 7.
Maximum Dependable Capacity (Net MWe):
1235 This Month Yr-to-Date Cumulative
- 8.
Hours Reactor was Critical 744.0
- 5. 552.7 117.797.4
- 9.
Hours Generator On-Line 744.0 5,522.4 115.033.7
- 10.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11.
Net Electrical Energy (MWeH)
.919.537.0 6.755.110.0 131.883.522.0 Page 1
UNIT SHUTDOWNS REPORT MONTH - AUGUST 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 9/3/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3 X~
I1
SUMMARY
- The Perry Nuclear Power remained on line the entire month of August, 2004.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
l A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explaIn)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2