August 2004 Monthly Operating Report for Perry Unit 1
ML042660048
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/10/2004
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2827L
Download: ML042660048 (3)


Text

FENOC FirstEnergy Nuclear Operating Company 76 South Main Street Akron, Ohio 44308 Lew W Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 September 10, 2004 PY-CEI/NRR-2827L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the August 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, ;

W.VMyrs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

I I

Z

I§62LI

OPERATING DATA REPORT UNIT:

FErr_

DATE:

9/3/04

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period August 2004

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

1260

7.

Maximum Dependable Capacity (Net MWe):

1235 This Month Yr-to-Date Cumulative

8.

Hours Reactor was Critical 744.0

5. 552.7 117.797.4
9.

Hours Generator On-Line 744.0 5,522.4 115.033.7

10.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

11.

Net Electrical Energy (MWeH)

.919.537.0 6.755.110.0 131.883.522.0 Page 1

UNIT SHUTDOWNS REPORT MONTH - AUGUST 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 9/3/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I

Hours 2

3 X~

I1

SUMMARY

The Perry Nuclear Power remained on line the entire month of August, 2004.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

l A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explaIn)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2