August 2004 Monthly Operating Report for St Lucie Units 1 and 2
ML042660020
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/13/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-207
Download: ML042660020 (3)


Text

FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 September 13, 2004 L-2004-207 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2004 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William Jefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment an FPL Group company

L-2004-207 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

50-335 UNIT NAME St. Lucie 1 DATE September COMPLETED BY K. R. o1e r TELEPHONE (T/72)4 u9=1 465 I

REPORTING PERIOD:

August 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date 744.00 5,058.30 744.00 5,015.40 0.00 0.00 631,457.00 4,234,394.00 Cumulative 198,602.30 196,725.70 0.00 161,335,341.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 1 operated essentially at full power for the entire month of August. In accordance with Technical Specification 6.9.1.6 there were no challenges to the PORVs or safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

L-2004-207 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-389 St. Lucie 2 September 09,2004 K. R. Boller (772) 467-7465 August 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date 744.00 5,855.00 744.00 5,855.00 0.00 0.00 625,204.00 4,954,996.00 Cumulative 161,891.57 159,977.47 0.00 132,001,972.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated essentially at full power for the entire month of August. In accordance with Technical Specification 6.9.1.6 there were no challenges to the PORVs or safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)