September 21, 2004 Mr. Stephen M. Quennoz, Vice President Power Supply/Generation Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048
SUBJECT:
CLOSURE OF CLEARANCE OF MATERIALS ISSUE AT THE TROJAN NUCLEAR PLANT
Dear Mr. Quennoz:
In April 2003, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at the Portland General Electric Company (PGE) Trojan Nuclear Plant (Trojan). At that time, PGE had initiated final status surveys of the Turbine Building and equipment. PGE used a release criterion of 21,000 dpm/100cm2 based on the default NRC screening derived concentration guideline limits adjusted for the radionuclide mix and fractions expected from primary to secondary system leaks. The inspectors noted that in planning the FSS design for the Turbine Building, PGE treated certain components as "install systems," using the provisions of draft Regulatory Guide DG-4006 (Section B) and NUREG-1757 (Vol. 2, Sect. G-1.1). Since the inspection, the staff has been evaluating whether PGEs decommissioning approach is consistent with the License Termination Rule (LTR) and current clearance policy. The Clearance Steering Committee and Working Group evaluated the issue, and NRC senior management, including the Commission, were made aware of the issue. Specifically, NRC evaluated whether:
1.
The PGEs interpretation of NRC guidance on "installed equipment" is within the context or basis of the LTR and Subpart E to Part 20; and
- b.
The dose due to the potential release of systems and components after license termination is consistent with NRC guidance which present a prospective criterion of a "few mrem" for the control of solid materials.
The staffs evaluation concluded that PGEs decommissioning approach, as described in the approved License Termination Plan, is consistent with the basis for the LTR, and consistent with current NRC guidance regarding the control of solid materials. Therefore, NRC considers this issue closed.
S.Quennoz In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions concerning this evaluation, please contact me at (301) 415-6607.
Sincerely,
/RA/
John T. Buckley, Project Manager Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-344 License No.: NPF-1
S. Quennoz In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions concerning this evaluation, please contact me at (301) 415-6607.
Sincerely,
/RA/
John T. Buckley, Project Manager Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-344 License No.: NPF-1 DISTRIBUTION:
DECD r/f DWMEP r/f DGillen BEvans, R IV BSpitzberg, R IV Trojan distribution list ML042660005
- See previous concurrence
- Concurred via fax.
OFC DWMEP*
DWMEP*
R IV**
DWMEP*
NAME JBuckley CBurkhalter BSpitzberg CCraig DATE 9/17/04 9/17/04 9/21/04 9/20/04 OFFICIAL RECORD COPY
Trojan Distribution List Mr. Stephen M. Quennoz Vice President, Power Supply/ Generation Trojan Nuclear Power Plant Portland General Electric Company 71760 Columbia River Highway Rainier, OR 97048 Chairman of the Board of County Commissioners Columbia County St. Helens, OR 97501 Mr. David Stewart-Smith Oregon Department of Energy 625 Marion Street, N.E.
Salem, OR 97301 Regional Administrator, RIV U.S. Nuclear Regulatory Commission Harris Tower and Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Jerry D. Reid Manager, Licensing Portland General Electric Company 71760 Columbia River Highway Rainier, OR 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, OR 97009 Mr. Jerry Wilson Do It Yourself Committee 570 N.E. 53rd Street Hillsboro, OR 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, OR 97204 Douglas Nichols, Esq.
Vice President, General Council and Secretary Portland General Electric Company 121 S.W. Salmon Street Portland, OR 97204 Mr. Steven B. Nichols General Manager, Trojan Portland General Electric Company Trojan Nuclear Power Plant 71760 Columbia River Highway Rainier, OR 97048