|
---|
Category:Letter
MONTHYEARML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 ML20149K4142020-05-27027 May 2020 NRC LAR Extension Supplemental Letter 2020-05-27 ML20135H1882020-05-15015 May 2020 Massachusetts Institute of Technology - Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20122A0622020-04-21021 April 2020 Massachusetts Institute of Technology, Regarding the, Amendment No. 42 to Renewed Facility Operating License No. R-37 for the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20090E2272020-04-16016 April 2020 Massachusetts Institute of Technology - Acceptance of the Application for a License Amendment Level 1 Position Title Change ML20097B6932020-03-31031 March 2020 Amendment No. 42 to Renewed Facility Operating License No. R-37 Regarding the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20097D2992020-03-27027 March 2020 Massachusetts Institute of Technology (Mit) - Annual Report for the Year 2019 ML20078J4852020-03-12012 March 2020 Massachusetts Institute of Technology (Mit), License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20055D3322020-02-18018 February 2020 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph IR 05000020/20192032020-01-15015 January 2020 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Security-Related Inspection Report 05000020/2019203 2024-01-05
[Table view] |
Text
NUCLEAR REACTOR LABORATORY AN INTERDEPARTMENTAL CENTER OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY Edward S. Lau 138 Albany Street, Cambridge, MA 02139-4296 Activation Analysis Superintendent Telefax No. (617) 253-7300 Coolant Chemistry MIT Nuclear Reactor Laboratory Tel. No. (617) 253-4211 Nuclear Medicine Reactor Engineering September 13, 2004 Mr. Kevin M. Witt Mail Stop 012-G13 U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Witt:
As per our September 10, 2004, exit meeting on the September 2004 Operator Licensing written exam, we would like to summarize our comments as follows.
Section B - Normal/Emergencv Procedures & Radiation Control (B.1) We suggest this question be removed because the material is from the MlTR-l SAR, which is not yet approved, and not a part of our current training. PM 5.0 of the AOPs is the normal source of dose information for various operation conditions and power histories. However, it doesn't address 100 kW operation. Also, the question does not indicate whether the 100 kW follows a period of prolonged operation for which there would be high levels of Na-24 or a long shutdown time for which there would be no Na-24.
(B.2) We suggest answers (a) and (d) both be acceptable because both are legitimate concerns if fission products are circulating in the primary coolant. (Note: For answer (d), see PM (AOP) 5.2.3-Immediate Action-Step 3).
(B.14) We suggest this question be removed because the official answer of "blockage of fuel element cooling channels" is taken from PM 4.5.2 which categorizes accidents as (1) credible accidents possibly leading to an off-site radiological emergency, (2) credible accidents not leading to an off-site radiological emergency, or (3) very-low probability accidents. It does not refer to which is the "most" credible. All of the answers given in this question are listed as per PM 4.5.2 and all would be equally valid answers. PM 4.5.2 does not address the issue of "most".
Section C - Facility and Radiation Monitoring Systems (C.8) We suggest answers' (a), (b), and (c) all be acceptable. Answer (a) is for manual initiation; answer (b) is the shut-off valve; answer (c) is for automatic initiation.
(See RSM diagram of Secondary Coolant System).
(C.10) We suggest answers (b) and (c) both be acceptable because both are normal means of satisfying the subcritical interlock. Answer (c) contributes to meeting the interlock's requirements, while answer (b) is a means of defeating (i.e. bypassing) it. (See RSM Pg.4-3). The question hinges on the words 'normal' and 'defeating'.
Mr. Doyle & Mr. Witt U.S. Nuclear Regulatory Commission Page 2 We describe startups as 'routine' and 'non-routine' (PM 2.3.2) but not as 'normal' or 'abnormal'. So, the word 'normal' does not clarify the question for us. The word 'defeating' does have special meaning in that one bypasses the interlock during blade calibrations, which are otherwise done using the routine (normal) startup procedure (RSM 4-3). Hence, the question's language points to both (b) or (c) as valid answers.
(C.1 1) We suggest answers (a), (b) and (c) be acceptable because the Log N period signal is fed by the fission chambers and gamma ion chambers of Nuclear Safety System Channels 1 and 2, as well as by the compensated ion chamber of Channel 3. (See RSM Section 5.3.1 as well as 5.3.2. Also see Figure 5.3 of RSM Pg. 5-14 which shows that Channel 1,2 and 3 feed to the Log N recorder).
(C.18) We suggest answers (a), (b), and (d) all be acceptable because in-core sample assemblies have been constructed using all three materials. (Note: The outer material is normally aluminum, but it could be stainless steel (see TS 5.2.2(b) and TS 5.3 Specification). The interiors have been aluminum, steel and titanium).
(C.19) We suggest answers (a) and (d) both be acceptable because Panel 1A and Panel 1 (Circuits 13-20) are the items supplied by emergency power. Certain control room wall receptacles are picked up. (See RSM Table 8-8-3 on Pg.8-34 and RSM Section 8.8.2 on Pg.8-30, especially the third paragraph). (Note: Strictly speaking, none of the answers is correct because:
a) Not all wall receptacles are supplied by emergency power. Only those supplied from Panel #1 Circuit #14 are covered.
b) Not true.
c) Not true.
d) Equipment from panel #1 (circuits 13-20) and panel #1A are operated on emergency power.
Another point of possible confusion is that the medical room wall receptacles were recently removed from the emergency power system.)
We thank you for the opportunity to comment on the exam. Thank you for your effort and time. Please do not hesitate to contact us if further questions arise.
Sincerely, Edward S. Lau Superintendent MIT Research Reactor ELgw