ML042600049

From kanterella
Jump to navigation Jump to search
Reactor and Senior Reactor Operator Initial Examinations - Farley Nuclear Plant - 05000348/05-301 and 05000364/-05-301
ML042600049
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/16/2004
From: Ernstes M
Division of Reactor Safety II
To: Stinson L
Southern Nuclear Operating Co
References
50-348/05-301, 50-364/05-301
Download: ML042600049 (4)


See also: IR 05000348/2005301

Text

September 16, 2004

Southern Nuclear Operating Company, Inc.

ATTN: Mr. L. M. Stinson

Vice President

P. O. Box 1295

Birmingham, AL 35201

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

FARLEY NUCLEAR PLANT - 05000348/2005301 and 05000364/2005301

Dear Mr. Stinson:

In a telephone conversation on September 14, 2004, between Mr. Joel Deavers, Senior

Instructor, Continuing Training and Mr. Ronald F. Aiello, Senior Operations Engineer,

arrangements were made for the administration of licensing examinations at the Farley Nuclear

Plant. The written examinations are scheduled to be given on January 19, 2005, and the

operating tests are scheduled to be given January 10 - 14, 2005. The on-site preparatory week

is scheduled for the week of December 6, 2004.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRC regional office will discuss with your staff any changes that might

be necessary before the examination is administered. Your staff will also provide copying

services for administering the exam.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by October 18, 2004. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by November 15, 2004.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

SNC

2

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The

public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. r. Deavers has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-

mail: rfa@nrc.gov), or myself at (404) 562-4638, (Internet E-mail: mee@nrc.gov).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-348, 50-364

License Nos. NPF-2, NPF-8

cc: (See page 3)

SNC

3

cc contd:

B. D. McKinney, Licensing

Services Manager, B-031

Southern Nuclear Operating

Company, Inc.

Electronic Mail Distribution

D. E. Grissette

General Manager, Farley Plant

Southern Nuclear Operating

Company, Inc.

Electronic Mail Distribution

J. B. Beasley, Jr.

Executive Vice President

Southern Nuclear Operating

Company, Inc.

Electronic Mail Distribution

State Health Officer

Alabama Department of Public Health

RSA Tower - Administration

Suite 1552

P. O. Box 303017

Montgomery, AL 36130-3017

M. Stanford Blanton

Balch and Bingham Law Firm

P. O. Box 306

1710 Sixth Avenue North

Birmingham, AL 35201

William D. Oldfield

Quality Assurance Supervisor

Southern Nuclear Operating Company

Electronic Mail Distribution

Charles D. Nesbitt, Plant Training &

Emergency Preparedness Manager

Joseph M. Farley Nuclear Plant

P. O. Box 470

Ashford, Al 36312

SNC

4

Distribution:

F. Rinaldi, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

RAiello:pmd

MErnstes

BBonser

DATE

9/15/04

9/15/04

9/15/04

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042600049.wpd