August 2004 Monthly Operating Report for Limerick, Units 1 and 2
ML042590596
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/15/2004
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002
Download: ML042590596 (3)


Text

Exelon Nuclear T.S. 6.9.1.6 September 15, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for August 2004 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of August 2004 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of August 2004 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Original signed by Bryan C. Hanson Bryan C. Hanson Plant Manager-LGS Attachments cc:

S. Collins, Administrator, Region I, USNRC S. Hansell, LGS USNRC Senior Resident Inspector

Unit:

Limerick 1 Docket No:

50-352 Date:

9/15/04 Completed by: Greg Lee Telephone:

(610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-August 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 744.00 5,460.17 144,026.64 Hours Generator On-Line (Hours) 744.00 5,416.38 141,997.58 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 852,455.00 6,129,177.00 147,955.466.00 B.

UNIT SHUTDOWN No.

Date (yymmdd)

Type Generator Off-line Duration (hrs)

Reason Method Corrective Actions/Comments None during August 2004

SUMMARY

Unit 1 began the month of August 2004 at 100.0% of rated thermal power (RTP).

On August 11th at 09:15 hours reactor power was reduced from 99.9% to 99.3% RTP for isolation of the 4B feedwater heater. At 11:29 hours, reactor power was restored to 99.9% RTP Unit 1 ended the month of August 2004 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During August 2004

Unit:

Limerick 2 Docket No:

50-353 Date:

9/15/04 Completed by: Greg Lee Telephone:

(610) 718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-August 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 744.00 5,824.13 120,274.23 Hours Generator On-Line (Hours) 744.00 5,805.02 118,492.74 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 846,143.00 6,656,369.00 127,677,735.00 B. UNIT SHUTDOWN No.

Date (yymmdd)

Type Generator Off-line Duration (hrs)

Reason Method Corrective Actions/Comments None During August 2004

SUMMARY

Unit 2 began the month of August 2004 at 100.0% of rated thermal power (RTP).

There were no power changes during the month of August 2004.

Unit 2 ended the month of August 2004 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During August 2004