Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Fort Calhoun
ML042510093
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/02/2004
From: Tschiltz M
NRC/NRR/DSSA/SPSB
To: Hackerott A
Omaha Public Power District
Perch R, NRR/DSSA/SPSB, 415-1422
Shared Package
ML042530660 List:
References
Download: ML042510093 (3)


Text

September 2, 2004 Mr. Alan Hackerott Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

TRANSMITTAL OF REVISION 1 SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOK AND INFORMATION REQUEST FOR NEXT REVISION

Dear Mr. Hackerott:

On September 30, 2003, the NRC completed a two-year benchmarking activity for 71 Significance Determination Process (SDP) risk-informed inspection notebooks. All 71 notebooks were issued as revision 1, incorporating information obtained during the initial benchmarking visits. The NRC appreciates the support of each licensee in this resource intensive, first-of-a-kind effort which has greatly improved the quality of each SDP notebook to reflect the plant design-features, operational procedures and, in many cases, reduced unnecessary conservatism.

Over the course of this two year effort, insights were gained and it became apparent that these lessons learned would need to be captured in all of the notebooks, with additional effort needed for updating the notebooks that were benchmarked early in the process. It was also recognized that periodic maintenance would be required to achieve a reasonable level of accuracy as a screening tool, given changes in plant design, procedures, and revisions to the plant-specific probabilistic risk assessment (PRA) models since the original benchmarking visit.

In April of 2004, the NRC and its contractor Brookhaven National Laboratory (BNL) embarked on an SDP notebook enhancement/standardization effort for all 71 notebooks through a revision 2 process. Each revision 2 SDP notebook will contain a target set of equipment that is pre-solved in a manner similar to what was performed as part of the revision 1 benchmarking effort, in addition to capturing the lessons learned, and requesting information specific to gaps in the individual notebooks. The NRC estimates completion of the revision 2 SDP notebooks by June 30, 2005.

In order to achieve this milestone with minimal burden, the NRC requests that the plant-specific information for Fort Calhoun specified on the enclosed CD be sent to the address provided below. The CD also contains the revision 1 SDP notebooks generated from the initial benchmarking visit. The NRC requests that your response to the plant-specific information be provided on a CD within 30 days of receipt of this request. In addition to the plant-specific requests, the NRC welcomes your comments on the revision 1 SDP notebooks.

A. Hackerott 2 Mailing address for response:

Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.

If you have any questions regarding the request, please contact See-Meng Wong at 301-415-1125.

Sincerely,

/RA/

Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

Enclosure:

As stated

A. Hackerott 2 Mailing address for response:

Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.

If you have any questions regarding the request, please contact See-Meng Wong at 301-415-1125.

Sincerely,

/RA/

Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

Enclosure:

As stated DISTRIBUTION PUBLIC (w/o enclosure)

Adams Accession No. ML042510093 OFFICE SPSB-B SPSB-B SPSB-B/SC SPSB/BC NAME TValentine RPerch MCaruso MTschiltz DATE 8/ 30 /04 8/ 30 /04 9/ 1 /04 9/ 2 /04 OFFICIAL RECORD COPY