MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] |
Text
September 2, 2004 Mr. Alan Hackerott Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
TRANSMITTAL OF REVISION 1 SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOK AND INFORMATION REQUEST FOR NEXT REVISION
Dear Mr. Hackerott:
On September 30, 2003, the NRC completed a two-year benchmarking activity for 71 Significance Determination Process (SDP) risk-informed inspection notebooks. All 71 notebooks were issued as revision 1, incorporating information obtained during the initial benchmarking visits. The NRC appreciates the support of each licensee in this resource intensive, first-of-a-kind effort which has greatly improved the quality of each SDP notebook to reflect the plant design-features, operational procedures and, in many cases, reduced unnecessary conservatism.
Over the course of this two year effort, insights were gained and it became apparent that these lessons learned would need to be captured in all of the notebooks, with additional effort needed for updating the notebooks that were benchmarked early in the process. It was also recognized that periodic maintenance would be required to achieve a reasonable level of accuracy as a screening tool, given changes in plant design, procedures, and revisions to the plant-specific probabilistic risk assessment (PRA) models since the original benchmarking visit.
In April of 2004, the NRC and its contractor Brookhaven National Laboratory (BNL) embarked on an SDP notebook enhancement/standardization effort for all 71 notebooks through a revision 2 process. Each revision 2 SDP notebook will contain a target set of equipment that is pre-solved in a manner similar to what was performed as part of the revision 1 benchmarking effort, in addition to capturing the lessons learned, and requesting information specific to gaps in the individual notebooks. The NRC estimates completion of the revision 2 SDP notebooks by June 30, 2005.
In order to achieve this milestone with minimal burden, the NRC requests that the plant-specific information for Fort Calhoun specified on the enclosed CD be sent to the address provided below. The CD also contains the revision 1 SDP notebooks generated from the initial benchmarking visit. The NRC requests that your response to the plant-specific information be provided on a CD within 30 days of receipt of this request. In addition to the plant-specific requests, the NRC welcomes your comments on the revision 1 SDP notebooks.
A. Hackerott 2 Mailing address for response:
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.
If you have any questions regarding the request, please contact See-Meng Wong at 301-415-1125.
Sincerely,
/RA/
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Nuclear Regulatory Commission
Enclosure:
As stated
A. Hackerott 2 Mailing address for response:
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.
If you have any questions regarding the request, please contact See-Meng Wong at 301-415-1125.
Sincerely,
/RA/
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Nuclear Regulatory Commission
Enclosure:
As stated DISTRIBUTION PUBLIC (w/o enclosure)
Adams Accession No. ML042510093 OFFICE SPSB-B SPSB-B SPSB-B/SC SPSB/BC NAME TValentine RPerch MCaruso MTschiltz DATE 8/ 30 /04 8/ 30 /04 9/ 1 /04 9/ 2 /04 OFFICIAL RECORD COPY