Semi-Annual Fitness for Duty Program Performance Report
ML042470353
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/13/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042470353 (7)


Text

NMC Committed to Nuc Palisades Nuclear Plant Operated by Nuclear Management Company, LLC August 13, 2004 10 CFR 26.71 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Semi-Annual Fitness For Duty Pro-ram Performance Report In accordance with 10 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Semi-Annual Fitness For Duty Program Performance Report for the Palisades Nuclear Plant and the support locations for the period of January 1, 2004, through June 30, 2004.

Enclosures 1 and 2 summarize the test results at the Palisades Nuclear Plant and the support locations.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. M lone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)

CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 -Pr Telephone: 269.764.2000

ENCLOSUREI SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January 1 through June 30, 2004

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company conducted a total of 330 random tests with the following results:

Donor Groun Random Tests Results Employees 253 Random testing did not identify any positive drug/alcohol result.

Contractors 77 Random testing did not V identify any positive drug/alcohol results.

The positive drug/alcohol rate for 2004 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leading Substance Employees CN's Employees CN's Cocaine THC 1994 652 144 0.2% 0.7% 1 I 1995 665 207 0.0% 0.5% I 1996 629 216 0.2% 0.9% 2 1997 891 120 0.2% 0.8% 3 1998 767 208 0.5% 0.0% 3 1999 496 140 0.2% 0.0% 1 2000 536 53 0.0% 0.0%

2001 438 131 0.0% 0.0%

2002 482 122 0.0% 0.0%

2003 366 156 0.3% 0.0% I 2004 (YTD) 253 77 0.0% 0.0%

B. PRE-ACCESS TESTING A total of 175 pre-access tests were conducted during this reporting period. Three individuals were denied access based on positive test results.

Page 1 of 2

ENCLOSURE1 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January 1 through June 30, 2004 C. FOR CAUSE TESTING One 'For Cause" test was required during the reporting period, because of observed behavior. The results were negative.

D. FOLLOW-UP TESTING One individual tested positive for cocaine during "Follow-Up" testing. Plant access was revoked.

E. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant did not encounter any Fitness for Duty event that required reporting under 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 - June 30, 2004 Nuclear Management Company June 30, 2004 Company 6 Months Ending Palisades Nuclear Plant Location Jefferv J Fletcher 269-764-2575 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (nglml): Appendix A to 10 CFR 26 Marijuana I Amphetamines l l Cocaine I Phencyclidine l l Opiates I Alcohol (% BAC)* l

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 583 N/A 237

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access 27 0 _ 139 3 FOR Post-Accident 1 0 _ 0 0 CAUSE Observed 0 0 _ 1 0 Behavior Random 224 0 74 0 Follow-up 25 1 _ _ 11 0 Other 0 0 0 0 TOTAL 277 1 225 3 Page 1 of 4

ENCLOSURE2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 - June 30, 2004 Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees 1 Long-Term Contractors Short-Term Contractors 2 1 A Total 2 1 = I 1 =I I I _= I4 l Page 2 of 4

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 - June 30, 2004 Nuclear Manaaement Company June 30, 2004 Company 6 Months Ending Support Location Jefferv J Fletcher 269-764-2575 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana / Amphetamines / /

Cocaine / Phencyclidine / /

Opiates I Alcohol (% BAC)*

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Employees Contractor Contractor Personnel Personnel Average Number With Unescorted Access 47 N/A 13 Categories #Tested #Positive #Tested #Positive #Tested #Positive Pre-Access 9 0 _  ; 0 0 FOR Post-Accident 0--- --- 0 0 CAUSE Observed 0 0 _ 0 0 Behavior Random 29 0 _ 3 0 Follow-up 3 .0 - 0 0 Other 0 0 0 0 TOTAL 41 0 _ 3 0 Page 3 of 4

ENCLOSURE2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 - June 30, 2004 Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees E Long-Term Contractors . _ _ _ _ ___ __

Short-Term Contractors A Total =_ [ = === III Page 4 of 4 I