September 2, 2004 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Nazar:
By letter dated October 31, 2003, Indiana Michigan Power Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
Based on discussions with Mr. Richard Grumbir of your staff, a mutually agreeable date for your response is within 30 days of the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at 301-415-4053 or by e-mail at jgr@nrc.gov.
Sincerely,
/RA/
Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-315 and 50-316
Enclosure:
As stated cc w/encl: See next page
ML042470181 DISTRIBUTION: See next page Document Name: C:\\ORPCheckout\\FileNET\\ML042470181.wpd OFFICE RLEP:DRIP:GE RLEP:DRIP:LA RLEP:DRIP:SC-A NAME J. Rowley Y. Edmonds S. Lee DATE 9/2/04 9/2/04 9/2/04
DISTRIBUTION: Ltr. to M. Nazar, Dated:September 2, 2004 Accession No: ML042470181 HARD COPY RLEP RF J. Rowley (PM)
E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Marco J. Strasma, RIII OPA
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4351 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Director, Design Engineering and Regulatory Affairs Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michael J. Finissi, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Richard J. Grumbir Project Manager, License Renewal Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Laura Kozak 2443 Warrenville Rd.
Lisle, IL 60532
Enclosure DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION (RAIs)
RAI 4.7.4-1 The LRA Section 4.7.4, Reactor Vessel Underclad Cracking, states, The numbers of design cycles and transients assumed in the WCAP-15338 analysis bound the number of design cycles and transients projected for 60 years of operation. Please provide information regarding how you arrived at this conclusion.