ML042450103
| ML042450103 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Seabrook, Turkey Point |
| Issue date: | 08/24/2004 |
| From: | Scott(Ois) Morris NRC/NSIR/DNS |
| To: | Maier R, Peschel J Florida Power & Light Co |
| Peralta J NSIR/DNS 301-415-6689 | |
| References | |
| Download: ML042450103 (2) | |
Text
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil and Criminal Penalties August 24, 2004 Mr. Richarad Maier Manager Nuclear Security Florida Power and Light Company 700 Universe Boulevard Juno Beach, Florida 33408 c/o Mr. James Peschel
SUBJECT:
CLARIFICATION OF VEHICLE SEARCH CRITERIA
Dear Mr. Maier:
In an August 6, 2004, letter from the Nuclear Regulatory Commission (NRC) Chairman Nils Diaz to Nuclear Energy Institute (NEI) President Joe Colvin, the NRC provided the power reactor industry with a revised position on the criteria for conducting vehicle searches. The enclosure to this letter forwards an update to the guidelines specified on page 23 of the May 8, 2004, document entitled NRC Guidance on Implementation of the April 2003 Revised Design Basis Threat. The staff conferred with the Commission in preparing this clarification.
If you have any questions regarding this letter or the guidance, please contact Mr. Juan Peralta at (301) 415-6689, or me at (301) 415-7083.
Sincerely,
/RA/
Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response
Enclosure:
Vehicle Search Requirements (August 23, 2004)
Docket Nos.: 50-335, 50-389, 50-250, 50-251,and 50-443 NOTICE: Enclosure transmitted herewith contains Safeguards Information. When separated from Enclosure(s) this Cover Document is DECONTROLLED
August 24, 2004 Mr. Richarad Maier Manager Nuclear Security Florida Power and Light Company 700 Universe Boulevard Juno Beach, Florida 33408 c/o Mr. James Peschel
SUBJECT:
CLARIFICATION OF VEHICLE SEARCH CRITERIA
Dear Mr. Maier:
In an August 6, 2004, letter from the Nuclear Regulatory Commission (NRC) Chairman Nils Diaz to Nuclear Energy Institute (NEI) President Joe Colvin, the NRC provided the power reactor industry with a revised position on the criteria for conducting vehicle searches. The enclosure to this letter forwards an update to the guidelines specified on page 23 of the May 8, 2004, document entitled NRC Guidance on Implementation of the April 2003 Revised Design Basis Threat. The staff conferred with the Commission in preparing this clarification.
If you have any questions regarding this letter or the guidance, please contact Mr. Juan Peralta at (301) 415-6689, or me at (301) 415-7083.
Sincerely,
/RA/
Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response
Enclosure:
Vehicle Search Requirements (August 23, 2004)
Docket: Nos. 50-335, 50-389, 50-250, 50-251,,and 50-443 DISTRIBUTION: (w/o enclosure)
W. Kane, OEDO L. Marsh, NRR NSIR r/f DNS r/f E. Brown, B. Moroney, V. Nerses W. Burton (A), J. Clifford E. Hackett, C. Holden V. McCree, RII, G. Matakas, RI Accession Number: ML OFFICE NSIR/DNS OGC NSIR/DNS NAME JPeralta DCummings SMorris DATE 08/24/04 08/24/04 08/24/04 OFFICIAL RECORD COPY