2004 Calvert Cliffs Mid-Cycle Performance Review and Inspection Plan
ML042440516
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/30/2004
From: James Trapp
Reactor Projects Branch 1
To: Vanderheyden G
Constellation Generation Group
References
Download: ML042440516 (5)


Text

August 30, 2004 Mr. George Vanderheyden Vice President - Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT

Dear Mr. Vanderheyden:

On August 4, 2004, the NRC completed its mid-cycle plant performance assessment of the Calvert Cliffs Nuclear Power Plant. The mid-cycle review for Calvert Cliffs involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and the inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have the opportunity to prepare for these inspections and inform us of any planned inspections that may conflict with your plant activities. This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Proprietary Information in accordance with 10 CFR 2.390(d)(1)" will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006. However, the significance of a Unit 2 finding regarding a relay failure that caused the steam dump valves to fail open following a January 23, 2004, trip is still under review as part of the Significance Determination Process (NRC Inspection Report 2004-008).

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system

Mr. George Vanderheyden 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.govreading-rm/adams.html (Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5186 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69

Enclosure:

Calvert Cliffs Inspection/Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners J. M. Petro, Esquire, Constellation Energy Group, Inc.

J. E. Silberg, Esquire, Shaw, Pittman, Potts and Trowbridge Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)

Institute of Nuclear Power Operations (INPO)

Mr. George Vanderheyden 3 Distribution w/encl: (via E-mail)

S. Collins, RA J. Wiggins, DRA C. Miller, RI EDO Coordinator R. Laufer, NRR R. Guzman, PM, NRR R. Clark, PM, NRR P. Tam, PM, NRR (Backup)

J. Trapp, DRP N. Perry, DRP M. Giles, DRP, Senior Resident Inspector J. OHara, DRP - Resident Inspector C. Newgent - Resident OA D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDipmlipb Region I Docket Room (with concurrences)

DOCUMENT NAME: G:\DRP\BRANCH1\BRANCH1\2004 ROP 5 Mid-Cycle Review\2004 Mid-Cycle Letters\Calvert Cliffs 2004 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP C NAME NPerry/NSP JTrapp/JMT DATE 08/25/04 08/30/04 08/ /04 08/ /04 OFFICIAL RECORD COPY

Page 1 of 2 Calvert Cliffs 08/30/2004 10:33:08 Inspection / Activity Plan Report 22 07/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - EP PROGRAM INSPECT & PI VERIF 1 1, 2 IP 7111402 Alert and Notification System Testing 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/12/2004 07/16/2004 Baseline Inspections 7111401 - EXERCISE EVALUATION 4 1, 2 IP 7111401 Exercise Evaluation 10/04/2004 10/08/2004 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 12/13/2004 12/17/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 12/13/2004 12/17/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 12/13/2004 12/17/2004 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/13/2004 12/17/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 12/13/2004 12/17/2004 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program 12/13/2004 12/17/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/31/2005 02/04/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 01/31/2005 02/04/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/31/2005 02/04/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 01/31/2005 02/04/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/21/2005 02/25/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/21/2005 02/25/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/21/2005 02/25/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/21/2005 02/25/2005 Baseline Inspections 7111108P - INSERVICE INSPECTION - U2 3 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02) 02/25/2005 02/27/2005 Safety Issues 2 IP 7111108P Inservice Inspection Activities - PWR 02/28/2005 03/04/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/25/2005 07/29/2005 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 1 1, 2 IP 7111401 Exercise Evaluation 09/26/2005 09/30/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/26/2005 09/30/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 08/30/2004 10:33:08 Inspection / Activity Plan Report 22 07/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/10/2005 10/14/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/10/2005 10/14/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/10/2005 10/14/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/10/2005 10/14/2005 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 10/31/2005 11/04/2005 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 11/14/2005 11/18/2005 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/24/2005 10/28/2005 Baseline Inspections 7111111B - LO REQUAL PROGRAM INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 12/05/2005 12/09/2005 Baseline Inspections SSDI - SSDI 7 1, 2 IP 7111121 Safety System Design and Performance Capability 01/09/2006 01/13/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 01/23/2006 01/27/2006 Baseline Inspections MODS - MODS & 50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/23/2006 01/27/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 01/23/2006 01/27/2006 Baseline Inspections 71121 - OCC RADIATION SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/30/2006 02/03/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 01/30/2006 02/03/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/30/2006 02/03/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 01/30/2006 02/03/2006 Baseline Inspections 3/16+EXM - OPERATOR LICENSING INITIAL EXAM 1 1 U01585 CALVERT CLIFFS INITIAL EXAM (3/06) 02/06/2006 02/10/2006 Not Applicable 1 U01585 CALVERT CLIFFS INITIAL EXAM (3/06) 03/06/2006 03/10/2006 Not Applicable HEATSINK - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 02/20/2006 02/24/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.