Turkey Point Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2004 14:24:46 Report 22 1
2515/153
- TI 2515/153 RPV CONTAINMT SUMP BLOCKAGE Safety Issues 09/01/2004 11/03/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)
2 PIR F/U
- PI&R FOLLOWUP Baseline Inspections 09/13/2004 09/17/2004 Identification and Resolution of Problems IP 71152 3,4 1
EB2 ISI
- U3 INSERVICE INSPECTION Baseline Inspections 10/04/2004 10/08/2004 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RP BASELINE & HEAD REPLACEMENT Other Routine 10/04/2004 10/08/2004 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 10/04/2004 10/08/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 3,4 2
EB2-BMI
- U-3 2515/152: RPV BOTTOM MOUNTED INST Safety Issues 10/11/2004 10/14/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)
2 EB2 RPV
- U3 REACTOR HEAD REPLACEMENT Other Routine 10/12/2004 10/15/2004 Reactor Vessel Head Replacement Inspection IP 71007 3
2 EB2 RPV
- U3 CONTAINMENT WELDING REPAIR Other Routine 10/18/2004 10/22/2004 Reactor Vessel Head Replacement Inspection IP 71007 3
2 EB2SGISI
- U3 STEAM GENERATOR INSERVICE INSPECTION Baseline Inspections 10/18/2004 10/22/2004 Inservice Inspection Activities - PWR IP 7111108P 3
2 EB2 RPV
- U3 CONCRETE REPAIR Other Routine 11/01/2004 11/05/2004 Reactor Vessel Head Replacement Inspection IP 71007 3
4 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/10/2005 01/14/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3,4 Baseline Inspections 01/10/2005 01/14/2005 Permanent Plant Modifications IP 7111117B 3,4 3
OL PREP
- INITIAL EXAM PREP Not Applicable 02/07/2005 02/11/2005 TURKEY POINT/EXAM AT POWER FACILITIES V23236 3
- EMERGENCY EXERCISE Baseline Inspections 02/14/2005 02/18/2005 Exercise Evaluation IP 7111401 3,4 Baseline Inspections 02/14/2005 02/18/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3,4 Baseline Inspections 02/14/2005 02/18/2005 Performance Indicator Verification IP 71151 3,4 4
OL EXAM
- INITIAL EXAM Not Applicable 02/21/2005 03/04/2005 TURKEY POINT/EXAM AT POWER FACILITIES V23236 3
1 EB2 HEAD
- REACTOR HEAD REPLACEMENT Other Routine 04/18/2005 04/20/2005 Reactor Vessel Head Replacement Inspection IP 71007 4
2 EB2-ISI
- INSERVICE INSPECTION-U4 Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Turkey Point Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2004 14:24:46 Report 22 3
PS-RP
- RADIATION PROTECTION Other Routine 04/18/2005 04/22/2005 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 04/18/2005 04/22/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 04/18/2005 04/22/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 04/18/2005 04/22/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 04/18/2005 04/22/2005 Performance Indicator Verification IP 71151 3,4 2
PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 04/25/2005 04/29/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 04/25/2005 04/29/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3,4 1
EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 05/09/2005 05/13/2005 Inservice Inspection Activities - PWR IP 7111108P 4
2 PS-RP
- RADIATION PROTECTION Other Routine 05/16/2005 05/20/2005 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 05/16/2005 05/20/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 05/16/2005 05/20/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 05/16/2005 05/20/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 05/16/2005 05/20/2005 Performance Indicator Verification IP 71151 3,4 2
EB2 HEAD
- CONTAINMENT WELDING REPAIR Other Routine 05/23/2005 05/27/2005 Reactor Vessel Head Replacement Inspection IP 71007 4
2 PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 05/23/2005 05/27/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 05/23/2005 05/27/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 05/23/2005 05/27/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 05/23/2005 05/27/2005 Performance Indicator Verification IP 71151 3,4 2
EB2 HEAD
- CONCRETE REPAIR Other Routine 05/31/2005 06/03/2005 Reactor Vessel Head Replacement Inspection IP 71007 4
1 EB2-HS
- HEAT SINK Baseline Inspections 11/14/2005 11/18/2005 Heat Sink Performance IP 7111107B 3,4 2
- REQUAL INSPECTION Baseline Inspections 01/09/2006 01/13/2006 Licensed Operator Requalification Program IP 7111111B 3,4 2
EB2-MR
- MAINTENANCE RULE Baseline Inspections 02/06/2006 02/10/2006 Maintenance Effectiveness IP 7111112Q 3,4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Turkey Point Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2004 14:24:46 Report 22 3
PS-RP
- RP PUBLIC BASELINE Baseline Inspections 02/13/2006 02/16/2006 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 02/13/2006 02/16/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 3,4 Baseline Inspections 02/13/2006 02/16/2006 Radiological Environmental Monitoring Program IP 7112203 3,4 Baseline Inspections 02/13/2006 02/16/2006 Performance Indicator Verification IP 71151 3,4 1
- EP INSPECTION Safety Issues 02/27/2006 03/03/2006 Mitigating Systems Performance Index Pilot Verification IP 2515/149 3,4 Baseline Inspections 02/27/2006 03/03/2006 Alert and Notification System Testing IP 7111402 3,4 Baseline Inspections 02/27/2006 03/03/2006 Emergency Response Organization Augmentation Testing IP 7111403 3,4 Baseline Inspections 02/27/2006 03/03/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 3,4 Baseline Inspections 02/27/2006 03/03/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3,4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.