Inspection/Activity Plan 09/01/2004 Through 03/31/2004
ML042430679
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/30/2004
From:
Division Reactor Projects II
To:
Shared Package
ML042430675 List:
References
Download: ML042430679 (3)


Text

Page 1 of 3 Turkey Point 08/30/2004 14:24:46 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/153 - TI 2515/153 RPV CONTAINMT SUMP BLOCKAGE 1 3 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 09/01/2004 11/03/2004 Safety Issues PIR F/U - PI&R FOLLOWUP 2 3, 4 IP 71152 Identification and Resolution of Problems 09/13/2004 09/17/2004 Baseline Inspections EB2 ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/04/2004 10/08/2004 Baseline Inspections PS-RP - RP BASELINE & HEAD REPLACEMENT 2 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 10/04/2004 10/08/2004 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections 3, 4 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/04/2004 10/08/2004 Baseline Inspections EB2-BMI - U-3 2515/152: RPV BOTTOM MOUNTED INST 2 3 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 10/11/2004 10/14/2004 Safety Issues EB2 RPV - U3 REACTOR HEAD REPLACEMENT 2 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/12/2004 10/15/2004 Other Routine EB2 RPV - U3 CONTAINMENT WELDING REPAIR 2 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/18/2004 10/22/2004 Other Routine EB2SGISI - U3 STEAM GENERATOR INSERVICE INSPECTION 2 3 IP 7111108P Inservice Inspection Activities - PWR 10/18/2004 10/22/2004 Baseline Inspections EB2 RPV - U3 CONCRETE REPAIR 2 3 IP 71007 Reactor Vessel Head Replacement Inspection 11/01/2004 11/05/2004 Other Routine EB2-MODS - MODIFICATIONS/10CFR50.59 4 3, 4 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/10/2005 01/14/2005 Baseline Inspections 3, 4 IP 7111117B Permanent Plant Modifications 01/10/2005 01/14/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 3 V23236 TURKEY POINT/EXAM AT POWER FACILITIES 02/07/2005 02/11/2005 Not Applicable OL EP - EMERGENCY EXERCISE 2 3, 4 IP 7111401 Exercise Evaluation 02/14/2005 02/18/2005 Baseline Inspections 3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/14/2005 02/18/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 02/14/2005 02/18/2005 Baseline Inspections OL EXAM - INITIAL EXAM 4 3 V23236 TURKEY POINT/EXAM AT POWER FACILITIES 02/21/2005 03/04/2005 Not Applicable EB2 HEAD - REACTOR HEAD REPLACEMENT 1 4 IP 71007 Reactor Vessel Head Replacement Inspection 04/18/2005 04/20/2005 Other Routine EB2-ISI - INSERVICE INSPECTION-U4 2 4 IP 7111108P Inservice Inspection Activities - PWR 04/18/2005 04/22/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Page 2 of 3 Turkey Point 08/30/2004 14:24:46 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RADIATION PROTECTION 3 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 04/18/2005 04/22/2005 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 04/18/2005 04/22/2005 Baseline Inspections PS-RP - RP OCCUPATIONAL BASELINE - WEEK 1 2 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 04/25/2005 04/29/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 04/25/2005 04/29/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 04/25/2005 04/29/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 04/25/2005 04/29/2005 Baseline Inspections EB2SGISI - STEAM GENERATOR ISI 1 4 IP 7111108P Inservice Inspection Activities - PWR 05/09/2005 05/13/2005 Baseline Inspections PS-RP - RADIATION PROTECTION 2 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 05/16/2005 05/20/2005 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 05/16/2005 05/20/2005 Baseline Inspections EB2 HEAD - CONTAINMENT WELDING REPAIR 2 4 IP 71007 Reactor Vessel Head Replacement Inspection 05/23/2005 05/27/2005 Other Routine PS-RP - RP OCCUPATIONAL BASELINE - WEEK 2 2 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 05/23/2005 05/27/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 05/23/2005 05/27/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 05/23/2005 05/27/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 05/23/2005 05/27/2005 Baseline Inspections EB2 HEAD - CONCRETE REPAIR 2 4 IP 71007 Reactor Vessel Head Replacement Inspection 05/31/2005 06/03/2005 Other Routine EB2-HS - HEAT SINK 1 3, 4 IP 7111107B Heat Sink Performance 11/14/2005 11/18/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 3, 4 IP 7111111B Licensed Operator Requalification Program 01/09/2006 01/13/2006 Baseline Inspections EB2-MR - MAINTENANCE RULE 2 3, 4 IP 7111112Q Maintenance Effectiveness 02/06/2006 02/10/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Turkey Point 08/30/2004 14:24:46 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP PUBLIC BASELINE 3 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 02/13/2006 02/16/2006 Baseline Inspections 3, 4 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/13/2006 02/16/2006 Baseline Inspections 3, 4 IP 7112203 Radiological Environmental Monitoring Program 02/13/2006 02/16/2006 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 02/13/2006 02/16/2006 Baseline Inspections OL EP - EP INSPECTION 1 3, 4 IP 2515/149 Mitigating Systems Performance Index Pilot Verification 02/27/2006 03/03/2006 Safety Issues 3, 4 IP 7111402 Alert and Notification System Testing 02/27/2006 03/03/2006 Baseline Inspections 3, 4 IP 7111403 Emergency Response Organization Augmentation Testing 02/27/2006 03/03/2006 Baseline Inspections 3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/27/2006 03/03/2006 Baseline Inspections 3, 4 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/27/2006 03/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.