ML042430579
| ML042430579 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/30/2004 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML042430572 | List: |
| References | |
| Download: ML042430579 (2) | |
Text
Hatch Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 13:24:42 Report 22 1
- EP INSPECTION Baseline Inspections 08/30/2004 09/03/2004 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Performance Indicator Verification IP 71151 1, 2 1
EB2-MR
- MAINTENANCE RULE Baseline Inspections 09/20/2004 09/24/2004 Maintenance Effectiveness IP 7111112B 1, 2 2
- REQUAL INSPECTION Baseline Inspections 09/20/2004 09/24/2004 Licensed Operator Requalification Program IP 7111111B 1, 2 2
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 10/12/2004 10/15/2004 Safety System Design and Performance Capability IP 7111121 1, 2 6
EB1SSDPC - SAFETY SYS DESIGN & PERF. CAPABILITY Baseline Inspections 11/01/2004 11/05/2004 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 11/29/2004 12/03/2004 Safety System Design and Performance Capability IP 7111121 1, 2 1
EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 02/14/2005 02/18/2005 Inservice Inspection Activities - BWR IP 7111108G 2
2 PS-RP
- RP OCCPATIONAL BASELINE & ISFSI WK-1 Other Routine 02/14/2005 02/18/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 02/14/2005 02/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/14/2005 02/18/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/14/2005 02/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 02/14/2005 02/18/2005 Performance Indicator Verification IP 71151 1, 2 2
PS-RP
- RP OCCUPATIONAL BASELINE WK-2 Baseline Inspections 02/28/2005 03/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/28/2005 03/04/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/28/2005 03/04/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 02/28/2005 03/04/2005 Performance Indicator Verification IP 71151 1, 2 2
PB2-PIR
- PI&R PRE-INSP VISIT Baseline Inspections 06/20/2005 06/24/2005 Identification and Resolution of Problems IP 71152B 1, 2 4
BR2-PIR
- BIENNIAL PI&R Baseline Inspections 07/11/2005 07/15/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 07/25/2005 07/29/2005 Identification and Resolution of Problems IP 71152B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Hatch Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 13:24:42 Report 22 1
BR2-FP
- FLOOD PROTECTION Baseline Inspections 08/15/2005 08/19/2005 Flood Protection Measures IP 7111106 1, 2 1
- EP INSPECTION Baseline Inspections 10/03/2005 10/07/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 1, 2 1
EB2-HS
- HEAT SINK Baseline Inspections 10/17/2005 10/21/2005 Heat Sink Performance IP 7111107B 1, 2 1
OL PREP
- INITIAL EXAM PREP Not Applicable 10/17/2005 10/21/2005 HATCH/EXAMS AT POWER FACILITIES V23230 1
2 OL EXAM
- INITIAL EXAM Not Applicable 10/31/2005 11/04/2005 HATCH/EXAMS AT POWER FACILITIES V23230 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE