Inspection/Activity Plan for Hatch 09/01/04 - 03/31/06
ML042430579
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/30/2004
From:
Division Reactor Projects II
To:
Shared Package
ML042430572 List:
References
Download: ML042430579 (2)


Text

Page 1 of 2 Hatch 08/30/2004 13:24:42 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/30/2004 09/03/2004 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/30/2004 09/03/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/30/2004 09/03/2004 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/30/2004 09/03/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/30/2004 09/03/2004 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 09/20/2004 09/24/2004 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 09/20/2004 09/24/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 10/12/2004 10/15/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF. CAPABILITY 6 1, 2 IP 7111121 Safety System Design and Performance Capability 11/01/2004 11/05/2004 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 11/29/2004 12/03/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108G Inservice Inspection Activities - BWR 02/14/2005 02/18/2005 Baseline Inspections PS-RP - RP OCCPATIONAL BASELINE & ISFSI WK-1 2 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 02/14/2005 02/18/2005 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/14/2005 02/18/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/14/2005 02/18/2005 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 02/14/2005 02/18/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/14/2005 02/18/2005 Baseline Inspections PS-RP - RP OCCUPATIONAL BASELINE WK-2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/28/2005 03/04/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/28/2005 03/04/2005 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 02/28/2005 03/04/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/28/2005 03/04/2005 Baseline Inspections PB2-PIR - PI&R PRE-INSP VISIT 2 1, 2 IP 71152B Identification and Resolution of Problems 06/20/2005 06/24/2005 Baseline Inspections BR2-PIR - BIENNIAL PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 07/11/2005 07/15/2005 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 07/25/2005 07/29/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Page 2 of 2 Hatch 08/30/2004 13:24:42 Inspection / Activity Plan ENCLOSURE Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 08/15/2005 08/19/2005 Baseline Inspections OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 10/03/2005 10/07/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/03/2005 10/07/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/03/2005 10/07/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/03/2005 10/07/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/03/2005 10/07/2005 Baseline Inspections EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 10/17/2005 10/21/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 1 1 V23230 HATCH/EXAMS AT POWER FACILITIES 10/17/2005 10/21/2005 Not Applicable OL EXAM - INITIAL EXAM 2 1 V23230 HATCH/EXAMS AT POWER FACILITIES 10/31/2005 11/04/2005 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.