Inspection/Activity Plan 09/01/2004 Through 03/31/2006
ML042430567
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/30/2004
From:
Division Reactor Projects II
To:
Shared Package
ML042430555 List:
References
Download: ML042430567 (3)


Text

Farley Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2004 13:32:07 Report 22 1

PS-RP

- RADIATION PROTECTION - PRE-INSP VISIT Baseline Inspections 08/30/2004 09/03/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1

EB2-HEAD

- REACTOR HEAD REPLACEMENT Other Routine 09/06/2004 09/10/2004 Reactor Vessel Head Replacement Inspection IP 71007 1

6 LIC RENE

- SECOND LICENSE RENEWAL INSPECTION License Renewal Insp 09/13/2004 09/17/2004 License Renewal Inspection IP 71002 1, 2 License Renewal Insp 09/27/2004 10/01/2004 License Renewal Inspection IP 71002 1, 2 4

EB2TI159

- TI2515/159 GL 89-13: SERVICE WATER Safety Issues 09/07/2004 09/11/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 1, 2 2

PB2-152

- RPV LOWER HEAD PENETRATIONS Safety Issues 10/02/2004 10/28/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)

IP 2515/152 1

2 PB2-153

- RX CONTAINMENT SUMP BLOCKAGE Safety Issues 10/02/2004 10/28/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)

IP 2515/153 1

2 PS-RP

- RP OCCUPATION AL/RX HEAD REPLACEMENT W-1 Other Routine 10/04/2004 10/08/2004 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/04/2004 10/08/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/04/2004 10/08/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/04/2004 10/08/2004 Performance Indicator Verification IP 71151 1, 2 2

EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 10/11/2004 10/15/2004 Inservice Inspection Activities - PWR IP 7111108P 1

1 EB2HEAD

- RPV HEAD REPLACEMENT Other Routine 10/14/2004 10/18/2004 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 1

EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 10/18/2004 10/22/2004 Inservice Inspection Activities - PWR IP 7111108P 1

2 PS-RP

- RP OCCUPATION AL/RX HEAD REPLACEMENT W-2 Other Routine 10/18/2004 10/22/2004 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/18/2004 10/22/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/18/2004 10/22/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/18/2004 10/22/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/18/2004 10/22/2004 Performance Indicator Verification IP 71151 1, 2 2

OL PREP

- INITIAL EXAM PREP Not Applicable 12/06/2004 12/10/2004 FARLEY/EXAMS AT POWER FACILITIES V23234 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Farley Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2004 13:32:07 Report 22 3

OL EXAM

- INITIAL EXAM Not Applicable 01/10/2005 01/14/2005 FARLEY/EXAMS AT POWER FACILITIES V23234 1

4 EB1-TFP

- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 03/01/2005 03/03/2005 Fire Protection IP 7111105T 1, 2 4

EB1-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Fire Protection IP 7111105T 1, 2 Baseline Inspections 04/04/2005 04/08/2005 Fire Protection IP 7111105T 1, 2 1

PS-RP

- RADIATION PROTECTION PRE-INSP VISIT Baseline Inspections 06/06/2005 06/10/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 1

BR2-FP

- FLOOD PROTECTION Baseline Inspections 06/26/2005 06/30/2005 Flood Protection Measures IP 7111106 1, 2 3

PS-RP

- RP PUBLIC BASELINE Baseline Inspections 06/27/2005 07/01/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Performance Indicator Verification IP 71151 1, 2 1

60854

- ISFSI DRY RUN INSPECTION Other Routine 07/11/2005 07/15/2005 Preoperational Testing Of An ISFSI IP 60854 1, 2 4

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 07/11/2005 07/15/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 07/11/2005 07/15/2005 Permanent Plant Modifications IP 7111117B 1, 2 1

BR2-PI&R

- PI&R PREINSPECTION VISIT Baseline Inspections 07/18/2005 07/22/2005 Identification and Resolution of Problems IP 71152B 1, 2 4

EB2-PI&R

- BIENNIAL PI&R Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2 1

OL EP

- EP INSPECTION Baseline Inspections 08/22/2005 08/26/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Performance Indicator Verification IP 71151 1, 2 1

EB2 HEAD

- U-2 REACTOR HEAD REPLACEMENT Other Routine 08/29/2005 09/02/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Farley Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2004 13:32:07 Report 22 1

EB2-ISI

- INSERVICE INSPECTION-U2 Baseline Inspections 09/19/2005 09/23/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 PS-RP

- RP BASELINE & RX HEAD REPLACEMENT Other Routine 10/31/2005 11/04/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 1, 2 4

PS-RP

- RP PUBLIC BASELINE Baseline Inspections 12/05/2005 12/09/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Performance Indicator Verification IP 71151 1, 2 1

EB2-HS

- HEAT SINK Baseline Inspections 02/13/2006 02/17/2006 Heat Sink Performance IP 7111107B 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.