Inspection/Activity Plan 09/01/2004 Through 03/31/2006
ML042430567
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/30/2004
From:
Division Reactor Projects II
To:
Shared Package
ML042430555 List:
References
Download: ML042430567 (3)


Text

Page 1 of 3 Farley 08/30/2004 13:32:07 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RADIATION PROTECTION - PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/30/2004 09/03/2004 Baseline Inspections EB2-HEAD - REACTOR HEAD REPLACEMENT 1 1 IP 71007 Reactor Vessel Head Replacement Inspection 09/06/2004 09/10/2004 Other Routine LIC RENE - SECOND LICENSE RENEWAL INSPECTION 6 1, 2 IP 71002 License Renewal Inspection 09/13/2004 09/17/2004 License Renewal Insp 1, 2 IP 71002 License Renewal Inspection 09/27/2004 10/01/2004 License Renewal Insp EB2TI159 - TI2515/159 GL 89-13: SERVICE WATER 4 1, 2 IP 2515/159 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E 09/07/2004 09/11/2004 Safety Issues PB2-152 - RPV LOWER HEAD PENETRATIONS 2 1 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 10/02/2004 10/28/2004 Safety Issues PB2-153 - RX CONTAINMENT SUMP BLOCKAGE 2 1 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 10/02/2004 10/28/2004 Safety Issues PS-RP - RP OCCUPATION AL/RX HEAD REPLACEMENT W-1 2 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/04/2004 10/08/2004 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/04/2004 10/08/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 2 1 IP 7111108P Inservice Inspection Activities - PWR 10/11/2004 10/15/2004 Baseline Inspections EB2HEAD - RPV HEAD REPLACEMENT 1 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/14/2004 10/18/2004 Other Routine EB2SGISI - STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/18/2004 10/22/2004 Baseline Inspections PS-RP - RP OCCUPATION AL/RX HEAD REPLACEMENT W-2 2 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/18/2004 10/22/2004 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/18/2004 10/22/2004 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23234 FARLEY/EXAMS AT POWER FACILITIES 12/06/2004 12/10/2004 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Page 2 of 3 Farley 08/30/2004 13:32:07 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 3 1 V23234 FARLEY/EXAMS AT POWER FACILITIES 01/10/2005 01/14/2005 Not Applicable EB1-TFP - TRIENNIAL FIRE PROTECTION PRE-INSP VISIT 4 1, 2 IP 7111105T Fire Protection 03/01/2005 03/03/2005 Baseline Inspections EB1-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection 03/21/2005 03/25/2005 Baseline Inspections 1, 2 IP 7111105T Fire Protection 04/04/2005 04/08/2005 Baseline Inspections PS-RP - RADIATION PROTECTION PRE-INSP VISIT 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/06/2005 06/10/2005 Baseline Inspections BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 06/26/2005 06/30/2005 Baseline Inspections PS-RP - RP PUBLIC BASELINE 3 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/27/2005 07/01/2005 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/27/2005 07/01/2005 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 06/27/2005 07/01/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/27/2005 07/01/2005 Baseline Inspections 60854 - ISFSI DRY RUN INSPECTION 1 1, 2 IP 60854 Preoperational Testing Of An ISFSI 07/11/2005 07/15/2005 Other Routine EB2-MODS - MODIFICATIONS/10CFR50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 07/11/2005 07/15/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 07/11/2005 07/15/2005 Baseline Inspections BR2-PI&R - PI&R PREINSPECTION VISIT 1 1, 2 IP 71152B Identification and Resolution of Problems 07/18/2005 07/22/2005 Baseline Inspections EB2-PI&R - BIENNIAL PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/08/2005 08/12/2005 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/22/2005 08/26/2005 Baseline Inspections OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/22/2005 08/26/2005 Baseline Inspections EB2 HEAD - U-2 REACTOR HEAD REPLACEMENT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 08/29/2005 09/02/2005 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Farley 08/30/2004 13:32:07 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/19/2005 09/23/2005 Baseline Inspections EB2SGISI - STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/10/2005 10/14/2005 Baseline Inspections PS-RP - RP BASELINE & RX HEAD REPLACEMENT 1 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/31/2005 11/04/2005 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/31/2005 11/04/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/31/2005 11/04/2005 Baseline Inspections PS-RP - RP PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 12/05/2005 12/09/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/05/2005 12/09/2005 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/05/2005 12/09/2005 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 12/05/2005 12/09/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 12/05/2005 12/09/2005 Baseline Inspections EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 02/13/2006 02/17/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.