Inspection/Activity Plan for Watts Bar, 09/01/04 - 03/31/06
ML042430521
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 08/30/2004
From:
NRC/RGN-II
To:
Shared Package
ML042430505 List:
References
Download: ML042430521 (2)


Text

Watts Bar Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 13:53:22 Report 22 1

OL EP

- EP INSPECTION Baseline Inspections 08/30/2004 09/03/2004 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 08/30/2004 09/03/2004 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 08/30/2004 09/03/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 08/30/2004 09/03/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 08/30/2004 09/03/2004 Performance Indicator Verification IP 71151 1

4 EB-TI159

- REVIEW OF GL 89-13 (SW SYSTEM) RESPONSE Safety Issues 10/04/2004 10/08/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 1

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 11/15/2004 11/19/2004 Licensed Operator Requalification Program IP 7111111B 1

1 RP BR6

- UNIT 2 SYSTEMS LAYUP INSPECTION Other Routine 11/15/2004 11/19/2004 Review Of Quality Assurance For Extended Construction Delays IP 92050 1

3 PS-RP

- RP PUBLIC BASELINE Baseline Inspections 11/29/2004 12/03/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 11/29/2004 12/03/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 11/29/2004 12/03/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

Baseline Inspections 11/29/2004 12/03/2004 Radiological Environmental Monitoring Program IP 7112203 1

Baseline Inspections 11/29/2004 12/03/2004 Performance Indicator Verification IP 71151 1

4 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 01/31/2005 02/04/2005 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 02/14/2005 02/18/2005 Identification and Resolution of Problems IP 71152B 1

1 EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Inservice Inspection Activities - PWR IP 7111108P 1

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 03/21/2005 03/25/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/21/2005 03/25/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 03/21/2005 03/25/2005 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 03/21/2005 03/25/2005 Performance Indicator Verification IP 71151 1

2 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 04/04/2005 04/08/2005 Inservice Inspection Activities - PWR IP 7111108P 1

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 04/04/2005 04/08/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 04/04/2005 04/08/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 04/04/2005 04/08/2005 Radioactive Material Processing and Transportation IP 7112202 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Watts Bar Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 13:53:22 Report 22 2

PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 04/04/2005 04/08/2005 Performance Indicator Verification IP 71151 1

4 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 05/09/2005 05/13/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 05/09/2005 05/13/2005 Permanent Plant Modifications IP 7111117B 1

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 06/13/2005 06/17/2005 Safety System Design and Performance Capability IP 7111121 1

5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 07/11/2005 07/15/2005 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 07/25/2005 07/29/2005 Safety System Design and Performance Capability IP 7111121 1

2 OL EP

- EMERGENCY EXERCISE Baseline Inspections 10/31/2005 11/04/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 10/31/2005 11/04/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.