July 2004 Monthly Operating Report for Indian Point Units 2 and 3
ML042380360
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/13/2004
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NL-04-099
Download: ML042380360 (4)


Text

AEntergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB E

te1 My P.RO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration August 13, 2004 Indian Point Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-099

[1 OCFR50.36]

Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-Pl-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for July 2004

Reference:

1)

NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," dated May 15, 1997

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of July 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1).

There are no commitments contained in this letter.

Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.

S.

Fred R. Dacimo Site Vice President Indian Point Energy Center

Docket Nos. 50-247 and 50-286 NL-04-099 Page 2 of 2 : Operating Data Report Indian Point 2 : Operating Data Report Indian Point 3 cc:

Mr. Samuel J. Collins Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059

'Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223-1350

OPERATING DATA REPORT NL-04-099 Attachment I DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-247 Indian Point 2 (Unit)

August 09, 2004 Tom Orlando :-..4.

(914) 736-8340 REPORTING PERIOD:

July 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 993.00 956.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 718,755.00 Yr-to-Date 5,111.00 5,111.00 0.00 5,025,656.00 Cumulative 188,277.48 184,281.95 0.00 157,175,942.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments Reason:

,A Equipment Failure (Explain) 8 Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit 2 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 744,439 MWhrs.

Page 1 of 1

OPERATING DATA REPORT NL-04-099 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-286 Indian Point 3 (Unit)

August 09, 2004.

Tom Orlando.,-

(914) 736-8340 REPORTING PERIOD:

July 2004

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 979.00 979.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 735,027.00 Yr-to-Date 5,111.00 5,111.00 0.00 5,094,441.00 Cumulative 159,215.99 156,268.18 0.00 140,739,753.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments I

2 Reason:

. A Equipment Failure (Explain)

  • B Maintenance or Test C

Refueling

.D Regulatory Restriction

.E Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit 3 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 761,162 MWhrs.

Page 1 of I