July 2004 Monthly Operating Report for St. Lucie Units 1 and 2
ML042370334
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/10/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-182
Download: ML042370334 (3)


Text

FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 10, 2004 L-2004-182 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, WJ/KWF Attachment an FPL Group company

L-2004-182 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME St DATE Au COMPLETED BY K.

TELEPHONE (77 REPORTING PERIOD:

-335

. Lucie 1 gust 05, 2004 R. Boller

72) 467-7465 July 2004
1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe.Net) 830.00 839.00
3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 633,723.00 Yr-to-Date 4,314.30 4,271.40 0.00 3,602,937.00 Cumulative 197,858.30 195,981.70 0.00 160,703,884.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

St. Lucie Unit I operated in Mode 1 for the entire month of July. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

L-2004-1 82 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME St DATE Au COMPLETED BY K.

TELEPHONE

(_

REPORTING PERIOD:

-389

. Lucie 2 gust 05,2004 R. Boller

72) 467-7465 July 2004
1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 830.00 839.00
3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 627,852.00 Yr-to-Date 5,111.00 5,111.00 0.00 4,329,792.00 Cumulative 161,147.57 159,233.47 0.00 131,376,768.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date 5: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode 1 for the entire month of July. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)