Text
FENOC FirstEnergy N
,clear Oprating o 76 South Main Street Fff tewy NwearOpertin ComanyAkron, Ohio 44308 Low W. Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 August 13, 2004 PY-CEINRR-2824L United States Nuclear Regulatory Commission Document Control Desk Washingt~n,D-C-2Q555_
Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the July 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Lew W. Myers Attachment cc: NRC-Region mII Administrator NRC Project Manager NRC Resident Inspector i
I
-0 OPERATING DATA REPORT UNIT:
Perry DATE:
8/6/04 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period July 2004 Utility
Contact:
T. Phelps Telephone: 440-280-766 Design Electrical Rating (Net MWe):
1260 Maximum Dependable Capacity (Net MYe):
1235
- 8.
Hours Reactor was Critical
- 9.
Hours Generator On-Line
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
This Month 744.0 744.0 0.0 918960.0 Yr-to-Date 4.808.7 4.778.4 0.0 5.835.573.0 Cumulative 117.053.4 114.289.7 0.0 130 963, oqr%
n vv.vvv.svv.w Page 1
iI I
(
UNIT SHUTDOWNS REPORT MONTH - JULY 2004 DOCKETlNO: 50-440 NAME: Perry Nuclear Power Plant DATE: 816/04 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3 f
10 r
SUMMARY
- The Perry Nuclear Power remained on line the entire month of July 2004.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explainj.
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
Ucense Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
I - Manual 2 - Manual Scram 3 -Automatic Scram 4-Continuation 5 - Other Page 2 I