July 2004 Monthly Operating Report for Perry Unit 1
ML042320208
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/2004
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2824L
Download: ML042320208 (3)


Text

FENOC FirstEnergy N

,clear Oprating o 76 South Main Street Fff tewy NwearOpertin ComanyAkron, Ohio 44308 Low W. Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 August 13, 2004 PY-CEINRR-2824L United States Nuclear Regulatory Commission Document Control Desk Washingt~n,D-C-2Q555_

Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the July 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Lew W. Myers Attachment cc: NRC-Region mII Administrator NRC Project Manager NRC Resident Inspector i

I

-0 OPERATING DATA REPORT UNIT:

Perry DATE:

8/6/04 1.

2.

3.

4.

5.

6.

7.

Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period July 2004 Utility

Contact:

T. Phelps Telephone: 440-280-766 Design Electrical Rating (Net MWe):

1260 Maximum Dependable Capacity (Net MYe):

1235

8.

Hours Reactor was Critical

9.

Hours Generator On-Line

10.

Unit Reserve Shutdown Hours

11.

Net Electrical Energy (MWeH)

This Month 744.0 744.0 0.0 918960.0 Yr-to-Date 4.808.7 4.778.4 0.0 5.835.573.0 Cumulative 117.053.4 114.289.7 0.0 130 963, oqr%

n vv.vvv.svv.w Page 1

iI I

(

UNIT SHUTDOWNS REPORT MONTH - JULY 2004 DOCKETlNO: 50-440 NAME: Perry Nuclear Power Plant DATE: 816/04 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I

Hours 2

3 f

10 r

SUMMARY

The Perry Nuclear Power remained on line the entire month of July 2004.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explainj.

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

Ucense Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 -Automatic Scram 4-Continuation 5 - Other Page 2 I