ML042300455
| ML042300455 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/06/2004 |
| From: | Zwolinski J Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:4071-03 | |
| Download: ML042300455 (3) | |
Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER August 6, 2004 AEP:NRC:4071-03 10 CFR 26.71(d)
Docket Nos:
50-315 50-316 U. S. Nuclear Regulatory Commission AT-N: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS In accordance with 10 CFR 26.71(d), Indiana Michigan Power Company hereby submits Fitness for Duty Program performance data for the six-month period of January 1, 2004, to June 30, 2004. Attached are the performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, and a summary of management actions.
There are no new commitments in this submittal.
questions, please contact Mr. Michael K. Scarpello, Licensing, at (269) 697-5020.
Should you have any Supervisor of Nuclear Sincerely, n A John A. Zwolinski Safety Assurance Director I
N_
DB/rdw Attachment c:
J. L.Caldwell, NRC Region III K. D. Curry, AEP Ft. Wayne, w/o attachment J. T. King, MPSC, w/o attachment J. G. Lamb, NRC Washington, DC MDEQ - WVHMD/HWRPS, w/o attachment NRC Resident Inspector I
OEI
Attachment to AEP:NRC:4071-03 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Page I Indiana Michigan Power Co.
Company Cook Nuclear Plant, Bridgman. Michigan Location Jim Bradshaw Contact Name 06/30/04 6 Month Ending (269) 466-3335 Phone E Appendix A to IOCFR26 1000/500 N/A N/A 25/25 N/A N/A 0.04%
N/A N/A Cutoffs: Screen/Confirmation (ng/ml)
Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC)
Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 1164 166 301 Unescorted Access Categories 1/I Tested Positive Tested Positive Tested Positive Pre-Access 16 0
5 0
207 1
For-Cause 3
0 0
0 0
0 Post Accident For-Cause I
0 1
0 0
0 Observed Behavior Random 334 I
40 0
75 0
Follow-Up 16 0
2 0
16 1
Other 16 0
6 0
0 0
Total 386 1
54 0
298 2
Attachment to AEP:NRC:4071-03 Page 2 BREAKDOOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refusal Marijuana Adulterated 50 100 To Test Suspect Specimen Wngml nglml Specimen Licensee 0
0 0
0 0
0 1
0 0
0 Employee Long-Term 0
0 0
0 0
0 0
0 0
0 Contractors Short-Term 0
1 0
0 0
0 0
1 0
0 Contractors Total 0
0 0
0 0
1 0
0 Total Confirmed Positive Tests For All Specific Substances, Refusals to Test, and Adulterated Specimens:
3 MANAGEMENT ACTIONS:
A meeting was held with laboratory, collection site, Medical Review Officer(s), Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the fitness for duty program.
APPEALS:
One appeal was received during this reporting period.
EVENTS:
There were no events identified as 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reportable in accordance with 10 CFR 26.73 during this reporting period.
TEMPORARY SUSPENSIONS:
No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.