July 2004 Monthly Operating Report from Limerick Generating Station Units 1 and 2
ML042300449
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/09/2004
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002
Download: ML042300449 (4)


Text

Exeken M Exelon Nuclear Limerick Generating Station P.O. Box 2300 Sanatoga, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 August 9, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating ReportWfoYrJuly 2004 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of July 2004 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of July 2004 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Bryan C. Hanson Plant Manager-LGS Attachments cc:

S. Collins, Administrator, Region I, USNRC

-S. Hansell, LGS USNRC Senior Resident Inspector

-fe2A

Unit:

Docket No:

Date:

Completed by:

Telephone:

A.

OPERATING DATA REPORT REPORTING PERIOD-July 2004 l Design Electrical Rating (MWe-Net) 11191.00 1 l Maximum Dependable Capacit (MWe-Net) 1134.00 l

Limerick 1 50-352 8/9/04 Greg Lee (610) 718-3707 Month Year to Date Cumulative Hours Reactor Critical (Hours) 744.00 4,716.17 l 143,282.64 Hours Generator On-Line (Hours) 744.00 4,672.38 l 141,253.58 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 851,970.00 5,276,722.00 147,103,011.00 B.

UNIT SHUTDOWN

'III No.

Date (yymmdd)

Type Generator Off-line Duration (hrs)

Reason Method Corrective Actions/Comments J.

a a

4 4

4 None during July 2004

SUMMARY

Unit 1 began the month of July 2004 at 100.0% of rated thermal power (RTP).

There were no Dower chanoes durina the month of July 2004.

Unit 1 ended the month of July 2004 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION Date l Valves Actuated l No. & Type of Actuation : Plant Condition l Description of Event None During July 2004 1

l l

Unit:

Docket No:

Date:

Completed by:

Telephone:

A.

OPERATING DATA REPORT REPORTING PERIOD-July 2004 l Design Electrical Rating (MWe-Net) l1191.00 l

Maximum Dependable Capacity (MWe-Net) 1134.00 Limerick 2 50-353 8/9/04 Greg Lee (610) 718-3707 Month Year to Date Cumulative Hours Reactor Critical (Hours) 744.00 5,080.13 119,530.23 Hours Generator On-Line (Hours) 744.00 5,061.02 117,748.74 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 843,463.00 5,810,226.00 126,831,592.00 B. UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off -line

__ (yymmd)-Duration'(hrs) __

i None During I 1

1July 2004

SUMMARY

Unit 2 began the month of July 2004 at 99.9% of rated thermal power (RTP).

On July 9m at 22:03 hours, reactor power was reduced from 99.9% RTP to 65.3% RTP for channel bow testing and rod pattern adjustment.

On July 10'n at 20:26 hours, reactor power was restored to 99.7% RTP.

Unit 2 ended the month of July 2004 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION l Date l Valves Actuated l No. & Type of Actuation l Plant Condition l Description of Event None During July 2004 l

l l

or e

I. -

-<'2 q -

, -