UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION RAS 8333 DOCKETED 08/17/04 COMMISSIONERS SERVED 08/17/04 Nils J. Diaz, Chairman Edward McGaffigan, Jr.

Jeffrey S. Merrifield In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-CO

)

(Davis-Besse Nuclear Power Station, Unit 1) )

_________________________________________)

CLI-04-23 MEMORANDUM AND ORDER This proceeding arises from a challenge to a confirmatory order modifying the operating license of FirstEnergy Nuclear Operating Company (FENOC) for the Davis-Besse Nuclear Power Station, Unit 1. The Licensing Board denied an intervention petition, and the petitioners appealed that decision. We affirm the Boards order.

I. BACKGROUND On March 6, 2002, FENOC discovered that small cracks in a nozzle that penetrates the reactor pressure vessel at the Davis-Besse Nuclear Power Station, Unit 1, had permitted reactor coolant to leak onto the reactor pressure vessel head. Boric acid in the coolant, undetected over time, had created a cavity in the reactor pressure vessel head. The Staff determined the cause of the problem to be FENOCs failure to properly implement its boric acid

corrosion control and corrective action programs.1 The NRC attached high safety significance to FENOCs performance deficiency.2 By Confirmatory Action Letter on March 13, 2002,3 the NRC confirmed FENOCs agreement to seek NRC approval before restarting Davis-Besse.4 To this end, FENOC developed a return-to-service plan and, later, an operational improvement plan.

Notwithstanding FENOCs actions and plans, the NRC Staff considered additional measures necessary to improve FENOCs ability to self-assess plant problems. Thus, on March 8, 2004, the Staff issued the Confirmatory Order at issue in this proceeding and approved the restart of Davis-Besse.5 The agreed order modifies the operating license for Davis-Besse to require two additional actions: (1) FENOC must obtain comprehensive independent assessments of Davis-Besses operational performance, safety culture, corrective action program implementation, and engineering program effectiveness; and (2) FENOC must conduct a visual examination of the reactor pressure vessel upper head during the next midcycle outage and report the results to the Staff before restart from the outage.6 1

Confirmatory Order Modifying License (Effective Immediately), 69 Fed. Reg. 12,357 (Mar. 16, 2004) (Confirmatory Order).

2 Id.

3 See CAL No. 3-02-01 (Mar. 13, 2002).

4 See Letter from J. E. Dyer (NRC) to Howard Bergendahl (FENOC), NRC Oversight Efforts Regarding the Davis-Besse Nuclear Power Station, (Apr. 29, 2002).

5 See 69 Fed. Reg. at 12,357.

6 The Confirmatory Order specifically provided:

1. FENOC shall contract with independent organizations to conduct comprehensive assessments of the Davis-Besse operations performance, organizational safety culture, including safety conscious work environment, the corrective action program implementation, and the engineering program effectiveness. . . . These outside independent assessments at Davis-Besse shall (continued...)

Pursuant to 10 C.F.R. § 2.202,7 the Commission invited any person adversely affected by the Confirmatory Order to request a hearing within 20 days. Michael Keegan, Joanne DiRando, Paul Gunter of the Nuclear Information and Resource Service, and Donna Lueke (collectively, Petitioners) requested a hearing. The Licensing Board denied the Petition,8 and Petitioners appealed. FENOC and the NRC Staff opposed both Petitioners hearing request and their appeal. For the reasons stated in LBP-04-11, we affirm the Boards decision.

II. DISCUSSION The Confirmatory Order provided that persons adversely affected by it could request a hearing within 20 days.9 Significantly, the Confirmatory Order set the boundaries for the hearing: If a hearing is held, the issue to be considered at such hearing shall be whether this 6

(...continued) be completed before the end of the 4th calendar quarter of 2004 and annually thereafter for 5 years. Within 45 days of completion of the assessments, the Licensee shall submit . . . all assessment results and any action plans necessary to address issues raised by the assessment results.

2. FENOC shall conduct a visual examination of the reactor pressure vessel upper head bare metal surface, including the head-to-penetration interfaces; the reactor pressure vessel lower head bare metal surface, including the head-to-penetration interfaces; and the control rod drive mechanism flanges . . . during the Cycle 14 midcycle outage. The results and evaluation of the inspections will be reported by letter to the Regional Administrator, NRC Region III, prior to restart from the midcycle outage, and any evidence of reactor coolant leakage found during the inspections will be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery . . .

69 Fed. Reg. at 12,359.

7 NRCs new adjudicatory rules, which became effective on February 13, 2004, apply to this proceeding. See Changes to Adjudicatory Process, 69 Fed. Reg. 2182 (Jan. 14, 2004).

8 See FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1),

LBP-04-11, 59 NRC __ (June 2, 2004).

9 69 Fed. Reg. at 12,360.

Confirmatory Order should be sustained.10 The order dealt with improving FENOCs ability to recognize and evaluate its own problems. Nevertheless, the Petitioners hearing request asked the NRC to hold an evidentiary hearing on fire-protection issues; to suspend FENOCs operating license and halt the restart of Davis-Besse because of the NRCs alleged regulatory indifference; and to require FENOC to satisfy all licensing criteria before allowing commercial generation of electricity at Davis-Besse. In essence, Petitioners sought a broad hearing in which to litigate concerns outside the permissible scope of the hearing.

To obtain a hearing, a petitioner must demonstrate standing and proffer at least one admissible contention.11 For an enforcement order, however, the threshold question, intertwined with both standing and contention admissibility issues, is whether the hearing request is within the scope of the proceeding outlined in the enforcement order itself; i.e.,

whether the Confirmatory Order should be sustained. The Commission has the authority to define the scope of the hearing, including narrowly limiting the proceeding.12 Accordingly, the only matters at issue here are the measures -- described in the enforcement order -- intended to improve FENOCs self-assessment efforts.

10 Id.

11 See 10 C.F.R. § 2.309(d), (f). The Commission imposed similar requirements for obtaining a hearing under our old adjudicatory rules. See, e.g., Dominion Nuclear Connecticut Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI-01-24, 54 NRC 349, 356-57 (2001);

Duke Cogema Stone & Webster (Savannah River Mixed Oxide Fuel Fabrication Facility), CLI-01-28, 54 NRC 393, 398 (2001).

12 See Bellotti v. NRC, 725 F.2d 1380, 1381 (D.C. Cir. 1983), affg Boston Edison Co.

(Pilgrim Nuclear Power Station), CLI-82-16, 16 NRC 44 (1982); Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), CLI-04-05, 59 NRC 52, 56 (2004); Public Serv. Co.

of Indiana (Marble Hill Nuclear Generation Station, Units 1 and 2), CLI-80-10, 11 NRC 438, 441-42 (1980). Bellotti is the controlling precedent for this case. The Board has discussed Bellotti and our recent decision in Maine Yankee and accurately applied these precedents to this proceeding. See LBP-04-11, 59 NRC at __, slip op. at 4-8. We see no need to repeat or amplify the Boards well-reasoned analysis here.

As the Board noted, the Petitioners did not make any effort to show how the corrective measures would cause them any harm. By itself, this failure to establish injury-in-fact defeated standing of the Petitioners and required the Board to reject the hearing request.13 In addition to their failure to establish standing, the Petitioners did not offer any admissible contentions. This omission independently doomed the Petitioners hearing request.

The Board correctly stated that issues would fall within the scope of the proceeding only if they amount to matters that oppose the issuance of the order as unwarranted, so as to require relaxation, or affirmatively detrimental to the public health and safety, so as to require rescission (as opposed to supplementation).14 The Petitioners have no interest that would be adversely affected by the conditions imposed by the Confirmatory Order at issue in this proceeding; indeed, Petitioners did not argue the contrary. Likewise, the Petitioners did not contend that any provision of the Confirmatory Order is unwarranted and ought to be relaxed. Finally, they did not suggest that the additional requirements of the Confirmatory Order are unnecessary.

The appellant bears the responsibility of clearly identifying the asserted errors in the decision on appeal.15 Here, however, the Petitioners did not identify any Board error. Instead, they merely reiterated their contentions and protested that they have not been allowed to litigate their concerns regarding FENOCs operation of the repaired Davis-Besse reactor. But injury alleged as a result of failure to grant more extensive relief is not cognizable in a proceeding on a Confirmatory Order16 and thus does not constitute grounds for appeal.

13 See Maine Yankee, CLI-04-5, 59 NRC at 56, n.14.

14 LBP-04-11, 59 NRC at __, slip op. at 7.

15 Advanced Medical Systems, Inc. (One Factory Row, Geneva, Ohio 44041), CLI-94-6, 39 NRC 285, 297 (1994), affd, Advanced Medican Systems, Inc. v. NRC, 61 F.3d 903 (6th Cir.

1995).

16 See Bellotti, 725 F.2d at 1383. Filing a petition pursuant to 10 C.F.R. § 2.206 is the (continued...)

III. CONCLUSION As in Maine Yankee,17 we ask whether the Petitioners seek additional measures beyond those set out in the disputed order. Unmistakably, the answer to this question is yes.

Therefore, under the principles enunciated in Bellotti and appropriately applied by the Board in this case, we affirm the Boards decision to deny Petitioners hearing request and terminate this proceeding.

IT IS SO ORDERED.

For the Commission

/RA/

Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 17th day of August 2004 16

(...continued) appropriate vehicle for the public to make requests to the NRC to modify a license.

17 See Maine Yankee, CLI-04-5, 59 NRC at 60-61.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

FIRSTENERGY NUCLEAR ) Docket No. 50-346-CO OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, )

Unit 1) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-04-23) have been served upon the following persons by electronic mail, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.

Office of Commission Appellate Administrative Judge Adjudication G. Paul Bollwerk, III, Chair U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Washington, DC 20555-0001 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: gpb@nrc.gov Administrative Judge Administrative Judge Charles N. Kelber Peter S. Lam Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: cnk@nrc.gov E-mail: psl@nrc.gov Lisa B. Clark, Esq. Terry J. Lodge, Esq.

Office of the General Counsel 316 N. Michigan St., Suite 520 Mail Stop - O-15 D21 Toledo, OH 43624-1627 U.S. Nuclear Regulatory Commission E-mail: tjlodge50@yahoo.com Washington, DC 20555-0001 E-mail: lbc@nrc.gov

2 Docket No. 50-346-CO COMMISSION MEMORANDUM AND ORDER (CLI-04-23)

Lew W. Myers Steven P. Frantz, Esq.

Chief Operating Officer Morgan, Lewis & Bockius LLP FirstEnergy Nuclear Operating Company 1111 Pennsylvania Ave., NW Davis-Besse Nuclear Power Station Washington, DC 20004 5501 North State Route 2 E-mail: sfrantz@morganlewis.com Oak Harbor, OH 43449-9760 E-mail: lwmyers@firstenergycorp.com

[Original signed by Evangeline S. Ngbea]

Office of the Secretary of the Commission Dated at Rockville, Maryland, this 17th day of August 2004