{{#Wiki_filter:August 9, 2004 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION -MILLSTONE POWER STATION UNIT 2 AND UNIT 3
Dear Mr. Christian:
In a telephone conversation on August 4, 2004, Mr. Stephen Barr, Examiner/Inspector, and Mr. Timothy Kulterman, Millstone Unit 3 Requalification Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Millstone Power Station, Unit 2 and Unit 3. The inspection for Unit 2 is planned for the week of October 4, 2004, and the inspection for Unit 3 is planned for the week of October 25, 2004. These weeks coincide with your regularly scheduled requalification examination cycles. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish for each unit: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of each units inspection. Please provide these materials to the NRC by September 24, 2004, for Unit 2, and by October 15, 2004, for Unit 3. Mr. Kulterman has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC
2 Mr. David A. Christian 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Stephen Barr at (610) 337-5316. Sincerely, /RA/ DSilk for Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos. 50-336 & -423 License Nos. DPR-65 & NPF-49 cc: J. A. Price, Site Vice President - Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford V. Juliano, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC) S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) R. Bassilakis, CAN J. M. Block, Attorney, CAN J. A. Price, Site Vice President - Millstone M. J. Wilson, Manager - Nuclear Training D. W. Dodson, Supervisor, Station Licensing
3 Mr. David A. Christian Distribution: (via E-mail) S. Collins, RA J. Wiggins, DRA R. Bellamy, DRP K. Jenison, DRP S. Schneider, Senior Resident Inspector C. Miller, RI EDO Coordinator J. Clifford, NRR V. Nerses, PM, NRR S. Wall, Backup PM, NRR S. Glenn, INPO (GlennSG@Inpo.org) W. Lanning, DRS S. Barr, DRS Examiner, DRS C. Bixler, DRS (OL Facility File) L. Vick, HOHB, NRR R. Conte, DRS DRS File DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042220331.wpd ADAMS PKG#: ML040780737 After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBixler SBarr RConte DSilk for DATE 08/09/04 08/04/04 08/09/04 OFFICIAL RECORD COPY}}