ML042190152

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Nuclear Management Co, LLC Regarding Performance of Point Beach Plant
ML042190152
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/04/2004
From: Louden P
NRC/RGN-III/DRP/RPB7
To: Koehl D
Nuclear Management Co
References
CAL 3-04-001
Download: ML042190152 (5)


Text

August 4, 2004 CAL 3-04-001 Mr. Dennis Koehl Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

PUBLIC MEETING ON JUNE 25, 2004, TO DISCUSS PERFORMANCE OF THE POINT BEACH NUCLEAR PLANT

Dear Mr. Koehl:

This letter refers to the public meeting conducted on June 25, 2004, in Mishicot, Wisconsin.

The purpose of the meeting was to discuss the preliminary results of the NRCs initial inspection of Nuclear Management Companys (NMC) progress in meeting the commitments made to the NRC, as documented in the Confirmatory Action Letter dated April 21, 2004. In addition, NMC provided a status of the nine areas from the Point Beach Excellence Plan that are subject to the Confirmatory Action Letter.

At the meeting, NMC acknowledged the preliminary results of the inspection and stated that corrective actions had been implemented for two Excellence Plan action plan step closure packages with which the inspectors had identified quality problems. The NRC expressed concern that the identification of problems with two of the six packages reviewed by the inspectors indicated a need for additional oversight by NMC of completed step closure packages. In addition, the NRC had requested that NMC provide a detailed overview of their process for quality review of Engineering products during the meeting. An observation from the inspection raised a question regarding the thoroughness of the Engineering product review process, particularly regarding the activities of the Quality Review Team. The licensee presented an overview which described additional teams/groups that performed various quality review functions for Engineering products and agreed to provide the inspectors with a step-by-step process briefing at the next available onsite opportunity.

The results of the inspection will be documented in a separate report and issued at a later date. Additional inspection activities will be conducted to assess further progress. A listing of principal NMC and NRC meeting attendees and a copy of the handout provided by NMC at the meeting are enclosed as Enclosures 1 and 2 to this letter.

D. Koehl In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions regarding this meeting, please contact me at (630) 829-9627.

Sincerely,

/RA/

Patrick L. Louden, Chief Branch 7 Division of Reactor Projects

Enclosures:

1. List of Meeting Attendees
2. NMC Meeting Handout cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation J. Cowan, Executive Vice President Chief Nuclear Officer D. Cooper, Senior Vice President, Group Operations J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer

DOCUMENT NAME: E:\Filenet\ML042190152.wpd o receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:dtp PLouden SReynolds DATE 07/29/04 07/29/04 08/04/04 OFFICIAL RECORD COPY

D. Koehl ADAMS Distribution:

WDR DFT DWS DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1

Enclosure 1 PUBLIC MEETING PRINCIPAL ATTENDEES June 25, 2004 NMC D. Cooper Senior Vice-President D. Koehl Site Vice-President G. Van Middlesworth Vice-President, Nuclear Oversight J. McCarthy Site Director J. Schweitzer Site Engineering Director J. Connolly Regulatory Affairs Manager M. Ray Emergency Preparedness Manager P. Russell Performance Manager NRC G. Grant Deputy Regional Administrator S. Reynolds Deputy Director, Division of Reactor Projects P. Louden Chief, Branch 7, Division of Reactor Projects H. Chernoff Project Manager, Office of Nuclear Reactor Regulation P. Krohn Senior Resident Inspector R. Michael Morris Resident Inspector M. Kunowski Project Engineer