ML042160104

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Farley Nuclear Plant
ML042160104
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/23/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Stinson L
Southern Nuclear Operating Co
References
Download: ML042160104 (6)


Text

July 23, 2004 Southern Nuclear Operating Company, Inc.

ATTN: Mr. L. M. Stinson Vice President P. O. Box 1295 Birmingham, AL 35201

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - FARLEY NUCLEAR PLANT

Dear Mr. Stinson:

In a telephone conversation on July 22, 2004, Mr. George T. Hopper, Senior Operations Engineer, and Mr. John Horn, Operations Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Farley Nuclear Plant. The inspection is planned for the week of August 9, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (one week prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRCs inspection program needs. Mr. Horn has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

SNC 

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. George T. Hopper at (404) 562-4645 or myself at (404) 562-4638.

Sincerely,

/RA/

Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8 cc w/encl: (See page 2)

SNC 

Enclosure:

Materials Request List cc w/encl:

B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. E. Grissette General Manager, Farley Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution J. B. Beasley, Jr.

Executive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Charles D. Nesbitt, Plant Training &

Emergency Preparedness Manager Joseph M. Farley Nuclear Plant P. O. Box 470 Ashford, Al 36312

SNC 

Distribution w/encl:

F. Rinaldi, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRs RII:DRS RII:DRP SIGNATURE /RA Bt MErnstes for/ /RA/ /RA/

NAME GHopper MErnstes BBonser DATE 7/23/04 7/24/04 7/24/04 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML042160104.wpd

Materials Request List The items listed below are being requested per telephone conversation on July 22, 2004, to support the upcoming IP-71111.11 B inspection in August 2004 at the Farley Nuclear Plant.

Items in paragraph "A" are to be sent prior to the inspection. They should be received in our office by August 3, 2004. Please have the items listed in paragraph "B" ready for our review upon arrival on August 9, 2004.

A. In-office inspection material:

1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2. A copy of the last biennial requal written examination. (2RO/SRO exams)
3. List of personnel scheduled for requal testing the week of August 9, 2004.
4. Copies of simulator scenarios for this exam.
5. Program evaluation for the previous 2 years training cycle.
6. A list of all personnel that reactivated their licenses since the last requal inspection.
7. Simulator:

List of all open simulator discrepancies (DRs).

Copy of the Simulator Management and Configuration Procedures.

List of all closed simulator DRs for last 12 months.

List of Simulator Performance tests.

B. On-site inspection material:

1. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2. All training feedback forms since the last requal inspection.
3. All remedial training packages since the last requal inspection.
4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.

Enclosure

2

5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7. All Medical Exam Records with a copy of the individuals license available. A list for review will be presented during the inspection week.
8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9. Copy of an Organizational Chart for the training department including the simulator group.
10. Complete list of all Licensed individuals complete with license restrictions.
11. Security procedures for the simulator.