Union Electric Callaway Plant PO Box 620 Fulton, MO 65251 July 9, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:

ULNRC-05025 wAmeren UE DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 INSERVICE INSPECTION (ISI)

SUMMARY

REPORTS FOR INTERVAL 2 PERIOD 2 Attached please find the Inservice Inspection (ISI) Summary reports for Interval 2, Period 2 at Callaway Nuclear Power Plant. These reports describe ISI activities performed from May 5, 1998 through November 26, 2002. Contained within the ISI Summary Reports are the "Owner's Data Report for Inservice Inspections" (Form OAR-1) which presents the information required by Code Case N-532, as requested by ULNRC-03334 (Dated February 15, 1996) and approved by the NRC (Letter dated March 19, 1996).

Each OAR-I was prepared and certified upon completion of each refueling outage within the period (Refuel 10, Refuel 11, and Refuel 12) and is being submitted following the end of the period, as required by N-532.

This letter does not contain any new commitments.

If you have any questions regarding this submittal, please contact me at (573) 676-8659 or Mr. Dave Shafer, Superintendent - Licensing at (314) 554-3104.

Sincerely, th D. Y g

Manager - Regulatory Affairs BFHhjdg Enclosures 1kw]

a subsidiary olAmeren Corporation

ULNRC-05025 July 9, 2004 Page 2 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7EI Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Jerry B. Uhlmann Director Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102