- ENOC 5501 North State Route 2 FfrstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Mark. Bezlla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 1-138 1 July 27, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Request for Extension of Commitment to a Notice of Violation from Davis-Besse Nuclear Power Station NRC Inspection Report No. 50-346/03-010 Ladies and Gentlemen:
On June 30, 2004 the FirstEnergy Nuclear Operating Company (FENOC) requested a verbal extension of an NRC Inspection Report 2003-010 Notice of Violation commitment to provide documentation establishing flow requirements (e.g., to demonstrate full open position) for check valves SW17, SW18, and SW19 due by June 30, 2004. This commitment was originally documented in Davis-Besse Nuclear Power Station (DBNPS) letter Serial 1-1357, dated April 5, 2004. The extension will permit completion of the formal documentation. This extension request is necessary due to an apparent work coordination issue between work groups and was entered into our Corrective Action program for further evaluation. Verbal approval was granted to extend the due date to October 15, 2004, by Mr. Passehl, NRC Project Engineer and the DBNPS Corrective Action Program Focus Area NRC lead inspector.
The NRC identified Violation was of very low safety significance. The revised commitment date identified in this submittal is listed in Attachment 1.
If there are any questions concerning this matter, please contact Mr. Gregory A. Dunn, Manager -
Regulatory Affairs at 419-321-8450.
Very truly yours, JCS/s : Commitment Listing cc: NRC Regional Administrator, Region El DB-1 Senior NRC/NRR Project Manager DB-1 Senior NRC Resident Inspector C. A. Lipa, Chief, Branch 4, Division of Reactor Projects D. Passehl, Project Engineer, Division of Reactor Projects Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 1-1381, Page 1 of 1 COMMITMENT LIST The following list identifies those revised actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE Documentation will be provided establishing flow requirements October 15, 2004 (e.g., to demonstrate full open) for check valves in the Check Valve program, including Service Water (SW) 17, SW18, and SW19.