July 30, 2004 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Bo Pham, Project Manager, Section 2
/RA/
Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF MEETING HELD ON JULY 20, 2004, WITH THE BOILING WATER REACTORS OWNERS GROUP (BWROG) TO DISCUSS TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) 357, "REVISION TO TS 2.1.1.2, MCPR [MINIMUM CRITICAL POWER RATIO] SAFETY LIMIT" On July 20, 2004, representatives of the BWROGs TSTF Committee met with the staff to discuss the staffs recent findings on TSTF-357 (Accession No. ML030970130). As the staff had earlier communicated its intention not to approve TSTF-357, the BWROG requested this meeting to identify and address any further questions the staff had regarding TSTF-357's review.
The BWROG began the meeting with an overview presentation of TSTF-357, explaining the rationale behind its development and the proposal to relocate the MCPR safety limit numeric values to the Core Operating Limits Report. The BWROG insisted that the lack of a streamlined process like TSTF-357 has resulted in unnecessary resource expenditures and tight schedules during boiling water reactor (BWR) refueling outages. In addition, the BWROG requested the staff's reasoning behind not approving TSTF-357.
In its main discussion, the NRC staff indicated that, among other issues which will be addressed in later correspondence to the BWROG, the current methodology used by BWR licensees in their cycle-to-cycle reload calculations were not well understood by the staff, and that this level of comfort needed to be raised before TSTF-357 could be considered.
Going forward, the staff and BWROG agreed to engage each other through the fuel vendors to address any deficiencies in current methodologies that may further provide the staff necessary information for future reviews. The staff also agreed to keep TSTF-357 open for further review, as resolution could potentially be achieved in the future with cooperation from the industry in this effort. Following the meeting, the staff expressed its appreciation to the BWROG for the presentation and discussion.
S. Dembek An attendance list is provided in the attachment. The slides used during the meeting are available in ADAMS under Accession No. ML042100022.
Project No. 691
Attachment:
Meeting Attendees cc w/att: See next page
ML042100512 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BPham:mp EPeyton SDembek DATE 7/30/04 7/30/04 7/30/04 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042100512.wpd
BWR Owners Group Project No. 691 cc:
Mr. Joseph E. Conen Vice Chairman, BWR Owners Group DTE Energy - Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 Mr. J. A. Gray, Jr.
Regulatory Response Group Chairman BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35242 Mr. Carl D. Terry Vice President, Nuclear Engineering Nine Mile Point - Station OPS Building/2nd Floor P.O. Box 63 Lycoming, NY 13093 Mr. Thomas G. Hurst GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. Thomas A. Green GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. James Meister Exelon Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Mr. William A. Eaton ENTERGY Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 Mr. Mark Reddeman Vice President Engineering Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Mr. Richard Libra DTE Energy Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 Mr. James F. Klapproth GE Nuclear Energy M/C 706 175 Curtner Avenue San Jose, CA 95125 Mr. Kenneth Putnam, Chairman BWR Owners Group Nuclear Management Company Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324
MEETING ATTENDEES MEETING WITH BOILING WATER REACTORS OWNERS GROUP (BWROG)
JULY 20, 2004 BWROG B. Morris (TVA)
J. Conen (DTE)
M. Harding (GE/GNF)
M. Turkal (Progress Energy)
J. Holm (ARIVA)
D. Hoffman (Excel Services)
T. Loomis (Exelon)
R. Hill (GE)
NRC B. Pham F. Akstulewicz T. Tjader W. Reckley Z. Abdullahi R. Caruso PUBLIC Deann Raleigh Steven Dolley Nancy Chapman