Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Benrwck, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pptweb.com July 13, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-3 87/NPF-14 and 50-3 88NPF-22 PLA-005787 The June 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman 476lq
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 07/13/2004 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U I)
- 2.
Reporting Period:
June 2004
- 3.
Design Electrical Rating (Net MWe):
1177*
- 4.
Maximum Dependable Capacity (Net MWe) 1135*
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
813,093 Yr.-to-Date 4,367 3,086.2 3,036.4 0
3,202,933 Cumulative 184,656 153,571.0 151,276.0 0
155,816,371 NOTES:
- Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April. The values may change slightly following official review of the Turbine Acceptance Test in June.
Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 07/13/2004 J. J. Hennings (570) 542-3747 REPORT MONTH June 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month
[
Summary: The only power reduction greater than 20% was for a planned control rod sequence exchange on 6/19/04. 100%
reactor power was achieved on 6/20/04.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page I of I
SUSQUEIHANNA STFAM ELECTRIC STATION Docket Number:
50-387 Date:
07/13/04 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenees to Main Steam Safetv Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 07/13/04 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susauehanna Steam Electric Station (U2)
- 2.
Reporting Period:
June 2004
- 3.
Design Electrical Rating (Net MWe):
1182
- 4.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 720' 720 720 0
808,263 Yr.-to-Date 4,367 4,367 4,367 0
5,026,000 Cumulative 169,896 148,262.8 146,275.6 0
153,784,011 NOTES:
Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 07/13/04 J. J. Hennings (570) 542-3747 REPORT MONTH June 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
s 3
No shutdowns this month.
Summary: The only power reduction greater than 20% was performed on 6/26/04 for a planned control rod sequence exchange and condenser maintenance. Power was returned to 100% on 6/27/04.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5-Other Page I of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
07/13/2004 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenues to Main Steam Safetv Relief Valves None.