ML042090223

From kanterella
Jump to navigation Jump to search
E-mail from D. King of Vermont Yankee to E. Gray of Us NRC, Regarding RF023 ISI Scope
ML042090223
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/24/2002
From: King D
Entergy Nuclear Vermont Yankee
To: Gray E
Division of Reactor Safety I
References
FOIA/PA-2004-0267
Download: ML042090223 (71)


Text

[Edwin Gray FW: RFO231 SI Scope From:

"King, D To:

<ehgl r

Date:

9/24/02

Subject:

FW: RFR

!Page 1

C.-;

ave" <dking3@entergy.com>

irc.gov>

10:14AM 023 1SI Scope I'll try this again

-Original Message--

From: King, Dave Sent: Monday, September 23, 2002 4:22 PM To: 'ehgrayenrc.gov'

Subject:

RF023 ISI Scope

Harold, Here Is the ISI scope that we spoke of earlier this afternoon.

Unfortunately this does not have the scheduled days for performance but with the exception of some Service Water UT examinations and a selected number of support VT's, which we are doing now, we will be very busy during the week of the 7th. Let me know if I can be of further assistance prior to your arrival.

Dave King ISI Coordinator/NDE Level IlIl

<<RFO-23 ISI Plan.rtf>>

100K

I Edwin Gray - RFO-23 ISI Plan.rtf Page 1 I RFO-23 Total Scope - ISI Component 1D: CS-2

==

Description:==

SprftCan.lntegraltAtachmenl Program: E1l Isometric:

El-5920-9211 Location:

ASMECategory:

F-A ASMIEttem:

FI.10 Nom Dia.: NWA ASSOCASUECATEGORY:

B-K ASSOCASMEITE.:

B10.20 Cal Bockl: N/A Interval: 3 Period: 3 Outage: 7 Comments: Integral attachment (B-K-1 PF and Vr-3 scheduled durng RFO-23 ComponentID: CS-HD61A Descrtption:

RestrahlntInlegralAdtachmenl Program: ISI isometric:

El1-5920-9211 Location:

ASMEECategory:

F-AUG ASUEtterm:

NWA Noem DI&.: NWA ASSOCASUECATEGORY:

C-C ASSOCASMErTEM.:

C3.20 Cat Block 1: NWA Interval: 3 Period: 3 Outage: 7 Comrents: Augmented IWF -

hih pipe. Code Case N-509. MT end Vr-3 ecleduled durIng RFO-23 Monday, September23,2002 OW 290 Thckness: WA Exam 1:

Vr-3 NECR 213 Thickness: NWA Exam 1:

Vr-3 System ID: CS On-line No Safety Class: I Exam 2 FT System D1: CS On-line Yes Safety Class: 2 Exam 2: MT Component ID: CS-lD61B Progrm Ml AShE Category F-AUG ASSOCASUECATEGORY:

N/A Interval: 3 Period: 3 Comments: Augmented IWF-thin pipe ComponentlD: CS-MIC Program El ASMECategory:

FALUG ASSOCASMECATEGORY:

NIA Interval: 3 Period: 3 Comments: Augmented IWF-hhn pipa

==

Description:==

Spring Can Isometric:

El-5920-9211 ASNE tram:

NWA Nomn ASSOC ASMEITEM:

NIA Ca IE Ouage: 7

. Dl-NA hock t: Nj Location:

NECR 213 Thickness: NWA

'A Exam t: Vr-3 Location:

NECR 213 Thickness: NWA

'A Exam 1: V1-3 Sysbtm ID: CS On-lne Yes Safety Class: 2 Exam 2: NWA System ID: CS On-line Yes Safety Class: 2 Exam 2: NWA

==

Description:==

Graity Manger Isomerice:

E3-5920-9211 ASME heom: NWA Nom. D4 ASSOCASMErlEM:

NIA CatIBoc Outage: 7 iNIA k t: N/l

I Edwin Gray - RFO-23 ISI Plan.rtf Page 21 I.J coorumtforl.

v. m nnJ;

&,pelvsor. Code Programs (D. C Ganolh:.

Dats: _ __ __ _

DsAq:____

Page of35

I Edwin Gray - RFO-23 ISI Plansrtf Pa-ge 3i

=.d RFO-23 Total Scope - ISI Mondayt September23, 2002 Componeniti: V14-12A

==

Description:==

ValveBodyandBolting Program: ISI Isometric:

tSI-5920-9211 Location:

RxBLDG 22W ASMECategory BG-2 ASMEt em: B7.70 Norm Ota.:

8.00-Thickness: N/A ASSOCASMECATEGORY:

BM-2 ASSOCASUEITEAE:

812.50 ColBlockl: N/A Exam1:

VT-1 Interval: 3 Period.: 3 Outage: 7 Comments: Boltng VT-1 scheduled during RFO-23 as VWe nesult t Outage 8-review.

Componentt1D: V14-14A Descrtption: Vave Body and Botting Program: ISI isometric: ISI-5920G9211 Location:

AS ECategory:

B-G-2 ASUE hem:

B7.70 Nor. Dtab 8.00-ASSOCASUEC4TEGORY:

B41.2 ASSOCASUE IEMt:

B12.50 CalBlockl: N/A Interval: 3 Perod.: 3 Outage: 7 Comments: Bolting VTr1 scheduled during RFO-23 as the result ot Outage 8-review.

DW 290 ThicIness: W/A Exam 1:

VT-1 System ID: CS On-line Yes Safely C/ass: I Exam 2: VT-3 System ID: CS On-lne No Safely Class: I Exam 2: VT-3 System ID: FDW On-line No Seey C/ass: I Exam 2: VT-3 Componentl D: V2-29A Descripton: ValveBodyandBolting Program: tSt hometrk:

ISI-FDV-PART 5 Location:

DW 251 ASUE Category 8-G-2 ASME hem:

B.7T0 Nonm Oba: 1t.00-Thickness: WtA ASSOCASMECATEGORY:

"4-2 ASSOCASUEflEb:

B12.50 Ca/Block?: NrA Exam1:

VT-1 Irnterval: 3 Period: 3 Outage: 7 Comments: Bolting VT-1 sdheduled during RFO-23 as the result Of Outage 8-review.

ComponentID: USD-HD7

==

Description:==

Restraint Program: tSI Isometric: VYAtSD PART 28 ASUECategory N/A ASUE Ihem: t, A No ASSOCAStECATEGORY:

NtA ASSOCASMEITEU:

N/A Cat nhterval:

3 Period: 3 Outage: 7 Comments: Augmented Seisrmic Support Progrm

. Web: N/A c Block 1: N/i Location:

HPCI 213' Thickness: N/A A

Exam 1:

VT-3 System ID: MS O-ne Yes Safety Class: NNS Exam 2: N/A

i i

A_ i __eA -

I Edwin Gray - RfU-23 ISI Plan.tr Page 41 IS, Coordinator(D.. RK)ng):

Dat:______

Page 2 of35 Supfovsor-Code Programs (D Datao:_

I..

C GlnrJ

I Edwin Gray - RI-O-23 ISI Pilan.r Pa-ge 51 RFO-23 Total Scope - ISI Component tO: 45-N

==

Description:==

RPV Nut Program:,IS isometrlc:

ISI-RPV-103 Loi ASUECategory?

B-C-1 AStEllem:

BS.10 Nom DI.: NIA ASSOCASfECATEGORY:

N/A ASSOCASMEITEM':

WA Cal Block 1: NWA Interval: 3 Period: 3 Outage: 7 Comments: RR B-4 aflows VT-i hI lou of surtace exam.

ComponentID: 45-S Descriptton RPVStud Program: tLt Isometric:

SISRPV-103 Lo(

ASME Category:

B-C-I ASUEItem:

85820 Nom. OVAR:

5.05 ASSOCASUECATEGORY:

B--1 ASSOCASMEtITEM:

88.30 Cal Block 1: RPB-2 Interval: 3 Period.: 3 Outage: 7 Comments: Detal Drwang 5920-44. UT only during RF:O23.

Component tO: 45-W/B

==

Description:==

RFVtsher1Bushtng Program: tI Isometric:

ISI-RPV-103 Loc ASMECategory:

B-C-1 ASE Itetm:

B5.50 Nomm De.: N/A ASSOCAStECATEGORY:

N/A ASSOCASMEITEM.:

W/A CalBlockt: NWA Interval: 3 PerIod: 3 Outage: 7 Comments: Bushing visual not requtired when stud is hI-ptace.

Monday, September 23. 2002 atlon:

Rx BLDG 345' Thickness: NA Enam t: VT-I catton:

Rb BLDG 345t Thtckness: NIA Eram 1: UT

atlon
Rx BLDG 345' Thickness: WA Exam 1: VT-i
aton: Rx8LDG 345' Thickness: NWA Eram 1: VT-I System I0: N8 On-,Ine No Safety Class: I Exam 2: W/A System ID: NS On-line No Safetyclass: 1 Exam 2.- UT System ID: NB On-line No Safety class: 1 Exam 2: NtA System OD: NB On-lne No Safety Class: I Exam 2: NIA ComponenttO: 48-N

==

Description:==

RFVNut Program: tSt Isometic: ISI-RPV-103 ASMUECategory:

BC-I ASUEitem:

80.10 NC ASSOCASUECATEGORY:

NtA ASSOCASUEITEM:

NWA Co Interval: 3 Period: 3 Outage: 7 Comments: RR 8-4 allows Vr-i hI Neu of surtace exem.

srLB

Die, N/A I Block 1: W/A Log

I Edwin Gray - RFO-23 151 Plan.rtf Page 6I ISICoordtnatorlD.& KItngo:

Dafs: ______

Page 3 of 35 3upwvisof. Cod0 crgams (D. C. uwrml::

_u__.s:

-3 I Edwin yray - KR-F-2 ISI Plan.rtt Page 7 I 1RFO-23 Total Scope - ISI Monday, September 23,2002 Component ID: 48-S

==

Description:==

RPV Stud Program: El1 Lsometric:

ISIARPV-103 Location:

RxSLDG 345' ASUECategory:

-C-11 ASME item: B520 NoJm 01a.: 5.0B' Thickness: N/A ASSOCASMECATEGORY:

B1-G-ASSOCASMEtTEM:

B6.30 Cal Block I1: RPS-2 Eam 1:

Lrr Intervat: 3 Petiod: 3 Outage: 7 Comments: Detat Otawing 5920.484. UT only during RFO-23.

ComponentID: 46-W/B

==

Description:==

RPVFWasher/Bushing Program: IS3 Isometric:

9St.RPV-103 Location:

ASMECatgoqr:

B ASUEItIem:

88.50 Norm Dta.: NMA ASSOCASMECATEGORY:

W4A ASSOCASMEtrTEA:

NWA Cal Block 1: NWA Interval: 3 Period:

3 Outage: 7 Comments: Bushing visual not reoulred when stud hin-otbce.

Rx BLDG 345' Thickness: W/A Exam 1:

VrT1 System ID: NS On-line No Safety Class: I Exam 2: uT System ID: NB On-line No SafetyClass: I Exam 2: N/A System tD: NB On-line No SafetyC/ass: I Exam 2: NA System ID: NB On-ine No Safty Ctass: 1 Exam 2: Wr ComponentID: 47-N

==

Description:==

RPVNot Program: LSI Isometric:

S1-RPV-103 ASMECAteloriy f-1I ASUEItem:

B8.10 NoN ASSOCASME CATEGORY:

NrA ASSOCASME17EMt:

NNA Cal Interval: 3 Perio&

3 Outage: 7 Comments: RR B-4 slows Vr-1 In leu of surface exm.

om. Dla: NWA I Block 1: N/A Location:

Rx BLDG 345S Thickness: NMA Exam 1:

Vr-1 caton:

Rx BLDG 345' Thickness: NWA Exam 1:

Ur Component ID: 47-S

==

Description:==

RPVStud Program: t1S isometrIc:

SJRPV-103 Loc ASUECateorr f-G-1 ASUEltem:

r8.20 Nom. Di4: 5.06' ASSOCASUECATEGORY:

B-;-1 ASSOCASAtE17Elt:

B830 Cal Block 1: RPS-2 Interval: 3 Period: 3 Outage: 7 Comments: Detail Drawing 592048. Ur only during RFO-23.

IEdwin Uray - RK-U-23 ISI Plan.rtt Page 8 ISJ Coonfinato (D. S. lCng):.

I Dat:_

Dart:_

Page 4 Of3s Oup. rvlsor. L.O VrO T ms (U.

. _ __r_

17_

V-I.

-

3 I Edawin cyray - RI-L DiOb 508' Block 1: RPE Location:

Rx BLDG 346 Thickness: WA B-2 Exam 1:

ur System ID: NB On-lne 4No SafetyClass: I Exam 2: MT Component ID: 53-WIB

==

Description:==

RPVWaslheBushng Program: ElI isometric: ESl-RPV-103 Location:

AWSECategory B-G-1 ASYE hem:

B8.50 Norm ObDa-WA ASSOCAStECATEGORY:

t4A ASSOCASMITEM.E:

WA Col Brock 1: WA interval: 3 Period: 3 Outage: 7 Comments: Bushing visual not required when stud Is Ih-place.

Rx BLDG 345' Thickness: WA Exam 1:

VT-1 SystermID: NB On-ine No SafetyClass: I Exam 2: WA SystemID: NB On-llne No Safety Class: I Exam 2: WA Component ID: 54-N Descripton:

RAP Mt Program:

l isometric:

6SRAPV-103 ASWE Caltgoy B-C-1 ASWEl hm:

B8.10 No ASSOCASFE CATEGORY:

WA ASSOCASYErTEM.t:

WA Ca nterval: 3 Period: 3 Outage: 7 Comments: R B-4 allows VT-1 is keu of surface exam.

om DOb: WA I Block 1: NIJ Location:

Rx BLDG 345' Thickness: WA

'A Exam 1:

VT-1

I Edwin f;ray - RFO-23 1St Plan.rtf Page.18I ISW Coor'dltor fD. S. King):

Sup*Msor-Cod. Programs a C. Gkrroir):.

Date:______

Oat*:_______

Page 9of35

.1 1,FEdwin g~ray - RFO-23 ISI Planrtt Page 19fX I

RFO-23 Total Scope - ISI Monday, September 23,2002 ComponntflD: 54-S

==

Description:==

RPVStujd Program: ISI isometric:

ISI-RPV-103 Loc ASME Category: B4--1 ASME Item:

B8.20 Nom. Dlab 5.06' ASSOCASME CATEGORY: B-t;1 ASSOCASMEITEM:

Bd.30 CatlBockl: RPS-2 Interval: 3 Period.: 3 Outage: 7 Comments: Detat Dawing 5920-484. UT only during RFO-23.

caton:

Rx BtLDG 345' Thickness: WA Exam 1:

UT ComrponentlD: 54-1WB Descriptlon:

RIVWashternBushing Program:

t isometrIc:

ISI-RPV-103 Location:

ASMECategory:

B-t-1 AS(EItem:

B8.50 Nom. Dba:

WA ASSOCASMECATEGORY:

WA ASSOCASUEITEM:

NtA Cal Block?: WA Interval: 3 Period: 3 Outage: 7 Comments: Bushing v1sual not requlred when stud ts

-place.

Rx BLDG 345' Thickness: WA Exam 1:

VT-1 System ID: NB On-line No Safety Class: I Exam 2: MT System ID: NB On-line No Safety Class: I Exam 2: WA System ID: NB On-line No Safety Class: I Exam 2: NWA System ID: NB On-lne No Safety Class: I Exam 2: MT Component iD: 5-N

==

Description:==

RPV Nut Program: 1 Isometric:

lSI-RPV-103 ASME Categorry B--1 ASMEIte m:

8.10 No ASSOCASME CATEGORY:

WA ASSOC ASME ITEM:

WtA Ca, Interval: 3 Prf:od 3

outage: 7 Comments: RR B-4 slows Vr-1 hI Neu of surface exam.

m. Dta-: WA I Block 1: W/A Locxation:

Rx BLDG 345' Thickness: WA Exam 1:

VT-1

!ation: Rx BlDG. 345' Thickness: WA Exam 1:

UT Component ID: 55-S

==

Description:==

RPVStud Program: tSt Isometric:

ISI-RPV-103 Lot AStEECategoryr B--1 ASME Htrm:

B8.20 Nom.DVa.: s.0o ASSOCASMEECATEGORY:

B--1 ASSOCASMEITEM.:

B8.30 Coa Block1: RPB-2 Interval: 3 Period.: 3 Outage: 7 Comments: Den Drawing 5920-484. Ur only during RFO-23.

Edwin Gray - RFO-23 ISI Plan.rtf Page 20 15t

~

~~ m edntttlRKrol WWIM*r

_ Dats:_

Date:_

Page Io 035 OMPWVIZ -

w r ij-I-t L.

r f

I Edwin,Gray - RFO-23 ISI Plan.rtf Page 21 1 RFO-23 Total Scope - ISI Component ID: 55-Wt3

==

Description:==

RPVWasher/Bushing Program:

ISI Isometric: ISI-RPV-103 Location:

ASME Category:

B-G-1 ASMEitem:

88.50 Nom Dla.: NtA ASSOCAStECATEGORY:

NA ASSOCASMEITEMt:

WA CatBlock1: WA Interval: 3 Period: 3 Outage: 7 Comments: Bushing visual not required when stud Is -lace.

Monday, September23 2002 Rx BLG 345' Thickness: WA Exam 1:

VT-1 System ID: NB On-tine No Safety Class: I Exam 2: WA System ID: N3 Ontne No Safety Class: 1 Exam 2: WA ComponentID: 58-N

==

Description:==

RPVNut Pogram: ISt Isomertrtc:

ISI-RPV-103 ASMECategory B-t-I ASMEItem:

5a.10 No ASSOCASME CATEGORY:

WA ASSOCASMEITEMt:

WA Ca interval: 3 Period: 3 Outage: 7 Comments: RR B4 alows Vr-1 i Nleu of surface exam.

wn. DI&: WA I Block 1: WA Location:

Rx BLDG 345t Thickness: NA x

tExam 1:

VT-1 ComponentID: 58-S Descriptlon:

RPV Stud Programn ISI Isometric:

ISI-RPV-103 ASUECategory.

B4-1 ASUE tem: 88.20 Non ASSOCASME CATEGORY:

B-4-1 ASSOCASMEITEMli:

8.30 Cal Interval: 3 Period 3

Outage: 7 Comments: Detail awing 5920-484. UT onlt during RFO-23.

DIb: 5.06' Block t: RR LocatIon:

Rx BLDG 345' I

Thickness: WA B-2 Exam 1:

UT System ID: NB On,1ine No Safety Class: I Exam 2: UT Component ID: W/B Description RFVWashenrBushing Program:

t Isometric: ElS-RPV-103 Location:

ASE Category B4--1t ASUEItem:

B8.50 Nom. Db-, WA ASSOCASUECATEGORY:

WA ASSOCASUEITE.:

WA Cal Block1: NtA Interval: 3 Period: 3 Outage: 7 Comments: BushhC visual not requited when stud Is "-lace.

Rx BLDG 345' Thickness: WtA Exam 1: VT-1 System ID: NB On-line No Safety Class: 1 Exam 2., WA

I I Edwin (Gray - RFO-23 ISI Plan.rtf rage 2 I II He

~~~~~an..........~...A_e IS/ Coorilnator (D. B. MKngJ:

Dteb:_

Page I1 of S Date: _

4up/visor -

d Pgroams ID-LG uWrTx!:_

I J.Edwin (,ray-RFO-23 ISI Planrtf Page 23-3 RFO-23 Total Scope - ISI Component ID: 57-N

==

Description:==

RPV Nul Program: IS Isometric: ISl-RPV-103 ASMECategory:

B4-G1 ASUE/term:

8B.10 No ASSOCASMECATEGORY:

NIA ASSOCASMEITEM:

NA Ca interval: 3 Period: 3 Outage: 7 Comments: RR B-4 slows Vr-I In eu of surc exam.

Monday, September23. 2002 m Dla.: WA tBlock I:

WA Location:

Rx BLDG 34S Thickness: WA 6

Exam 1:

VT-1 System ID: NB On4lne No SaletyClass: 1 Exam 2: NIA Component l0: 57-S

==

Description:==

RPVSbd Program: ISI isometrc:

ISI-RPV-103 ASUE Categot B-G-1 ASUEfitem:

9B.20 Non ASSOCASUE CATEGORY: B--I ASSOC ASUE ITEM:

B9830 Cal Interval: 3 Period: 3 Outage: 7 Comments: Detail Drawing 5920-484. UT only during RFO-23.

lock 1a:

5R03 Bl~ock 1: RPI Location:

Rx BLDG 34S Thickness: WA 9-2 Exam 1:

UT System ID: NB On-line No Safety Class: 1 Exam 2: MT Component ID: 57-WIB Descripton:

RWWasher/Bushing Program: IV isometric:

ESl-RPV-103 Location:

AStaECAtegory:

B-G-1 ASUE tem:

t8.50 Nonm DIa-WA ASSOCASME CATEGORY:

WA ASSOCASUEITEM:

WA Cal Block 1: NWA Interval: 3 Period: 3 Outage: 7 Comments: Bushing visual not required when sUd Is Is-p2ce.

Rx BLDG 345!

Thickness: NA Exam 1:

VT-1 System ID: NB On lne No Safety Class: I Exam 2: WA System ID: NB On-One No SafetyClass: 1 Exam 2 N/A Component ID: M8-N

==

Description:==

RNu Mt Progvmn El Isometric: EI-RPV-103 ASMECategot B-G-1 AStEltem:

Bf.10 No ASSOCASUECATEGORY:

WA ASSOCASME ITEM:

WA Ca Interval: 3 Period: 3 Outage: 7 Comments: RR B-4 slows VT-1 In eu of surface exam.

in Dia.: NA I Block 1: WN Location Rx BLDG 345' Thickness: NA

'A Exam 1:

Vr-I

-. a I Edwin Gray - RFO-23 ISI Plan.rtf Page 24

}

I ISI Coordinator(D. 8. Keg):

Supuivtsor -Code Programs (a C Gfrml4:.

. Dale:______

Date:______

Pago 12 of35

I Edwin Gray - RFO-23 ISI Plan.rtf Page 25j RFO-23 Total Scope - ISI Component ID: 68-S

==

Description:==

RPVStud Program: ESl Isomeic:

ISt-RPVt103 ASMECategoy.

BG-1 ASMEttem:

9820 Nor ASSOCASMECATEGORY:

Bt--1 ASSOCASMETEMtu:

B630 Cal Interval: 3 Period.: 3 Outage: 7 Comments: Detal Drawing 5920-484. Ur only during RFO-23.

Monday, September23. 2002

.Dia.: 5.08 Block 1: RF Location:

Rx BLDG 34S mThickness: WA

'B-2 Exam 1:

UT System ID:.NB On-line No Safety Class: 1 Exarm 2: MT ComponentID: S&WB

==

Description:==

RPVWashedr/ushkg Program: MI Isonetrtc: ISI-RPV-103 Location:

ASMECategorr B9--1 AStEltem:

B9.60 Nonm.Dba.:

WA ASSOCASuEC4rEGORY:

WA ASSOCASUEITEM.:

WA Cal Block 1: WNA Interval: 3 Period: 3 Outage: 7 Comments: Bushing %isual not required when stud Is hplce.

Rx BLDG 345' Thickness: WA Exam 1:

Vr-t Component ID: 59-N

==

Description:==

RPV MtA Program: ESl Isometric:

ISI-RPV-103 ASMUCategor B4--1 ASUEttem:

98.10 NO ASSOCASMECATEGORY:

WA ASSOCASbEITEU:

WA CeI Interval: 3 Period: 3 Outage: 7 Comments: RR B-4 slows VT-I hI ieu of surface exam.

omDbia NtA 1IBlock I: Wi Lor :atlon:

Rx BLDG 345' Thickness: FUA Exam 1: VT-1

atfon: Rx BLDr 345' Thickness: WA Exam 1:

UT SystemID: NB On-line No Safety Class: 1 Exam2:,WA System ID: NB On-line No Safety class: I Exam 2: WA System ID: NB On-flne No Safety CUlss: I Exam 2: UT ComponentID: 59-S

==

Description:==

RPV Stud Program: E1S Isometrtc:

ISIRPV-103 Loc ASUE categor B--1 ASWEItenm B8.20 Nonm DIb: 5.08 ASSOCASUEC4TEGORY:

B9-G1 ASSOCASMEtTEU.:

B8.30 Cal Block 1: RPB-2 Interval: 3 Period: 3 Outage: 7 Comments:

etlal Drawing 5920-484. Ur only during RFO-23.

'tdiwir Gray - RFO-23 ISi Plan.rtf -

Page 261 131 Coordlna to(. B KJing:__

Vate:_

Page 13 Ot3s Supervisor-Code Programs (DL C. G

_rror_:

Datfe:___

9 =,M.

_Edwin Gray - RF0-23 ISI Pian.rtf Page 27 1 RFO-23 Total Scope - ISI ComponentlO: 59-WSB

==

Description:==

RPVWasher/Bushing Program:

ISI Isometric: IS-RP103 I

ASMECategory:

BJ-1 ASUEltem:

88.50 Nonm Dla-N/A ASSOCASMECATEGORY:

N/A ASSOCASME7ITEJt NWA Cal Block 1: NtA Interval: 3 PerIod: 3 Outage: 7 Comments: Bushing visual not required when stud Is In-pface.

Monday. September23. 2002 Location:

Rx BLDG 345' Thickness: NA Exam 1:

VT-1

.ocatlon:

Rx BLDG 345' ThIckness: NWA Exam 1:

VT-1 System ID: NB On-line No Safety Class: 1 Exam 2:

N/A System ID: NB On-lIne No Safety Class: I Exam 2: WA ComponentID: 60-N

==

Description:==

RPVN t Program: ISI Isometric: EIS-RPV-103 ASME Category:

B-G-1 ASMElhem:

B6.10 NC ASSOCASMECATEGORY:

NA ASSOCASMEITEM:

NWA Ca inteval: 3 Priod: 3 Outage: 7 Comments: RR B-4 alows VT-1 hI leu of surface exam.

hn Dta: N/A IBlock 1: NWA ComponentID:

M0S

==

Description:==

RPVStud Program: SI1 Isometric: ISI-RPV-103 ASUE Category B-G1-AStElt em:

B820 Non ASSOCASUEtCATEGORY:

B-G-1 ASSOCASMEITEt:

B8.30 Cal Interval: 3 Petrod: 3 Outage: 7 Comrnents: Detl Drawing 5020484. UT only during RFO-23.

L DIa.: 5.06' B/ock 1: RPI Location:

Rx BLDG 345' Thickness: WA B-2 Exam r:

Ur System tD: NB Oni4ne N4O SafetlClass: I Exam 2: UT Component ID: 00-WAB Descript/on:

RPVWasher/Bushing Program: El1 Isometric:

ISI-RPV-103 Location:

ASME Category:

B-C1 ASMEhm:

B6.50 Nom Dls: N/A ASSOCASME CATEGORY:

N/A ASSOCASUEITEM.:

NtA Ca IBlock : NWA Interval: 3 Period: 3 Outage: 7 Conuments: Bushing visual not required when stud is h-ace.

RxBLDG 34S' ThIckness: N/A Exam t: V1T-System ID: NB On-11ne No Safety Class: I Exam 2 N/A

i

,1 I Edwin Gray - RFO-z3 ISI Plan.rtm rage zo I1. -_-

ISI Coordlnator(D. IL King):

Supplesor. Cod. Pgnrms (Da C. Gifofi:

Date:_

D.tae:__

Page 14 Of35

I.Edwin Gray - RFO-23 ISI Plan.rtf Page 291 RFO-23 Total Scope - ISI ComponentlD: 6i-N Descriptlon:

RPVVNut Program:

SI hsometdtc:

ISI-RPV-103 ASMECategory:

B-G-1 ASMEIlem:

BL.10 No, ASSOCASMECATEGORY:

WA ASSOCASlMEITEM:

WA Cal Interval: 3 Period: 3 Outage: 7 Comments: RR B-4 alows Vr-t hi Neu of surface exam.

Monday, September23 2002 om Dia: WA t

Block 1: NtW Lac ComponentID: 51-S

==

Description:==

RPV Stud Program ElI Isometric:

ISI-RPV-103 Loc ASMECategory:

B-C-1 AStEItemr:

9620 Norm x

I.: 50 ASSOCASMECATEGORY:

B-C-I ASSOCASMEITEM.:

B8.30 Cal Block 1: RPS-2 Interval: 3 Pertod:

3 outage: 7 Comments: Detal Drawing 5920454. UT rnly durung RFO-23.

ComponentID: 01-W/B Descrtptton:

R WaserlushkVg Program: ISI Isometric:

ISW I1 03 Loc AStECategory B-C-i ASUEltem B6.50 Nom. Oia.: WA ASSOCASMECATEGORY:

WA ASSOCAStEITEUt:

WA Cat Block 1: NWA hItervatl: 3 Period: 3 Outage: 7 Comments: Bushing Visual not tsqulred when stud Is hIn-pace.

afton:

Rx BLDG 34S' Thickness: WA Exam 1:

VT-i cat/on:

Rx BLDG 345' Thickness: WA Exam 1:

UT ctton:

Rx BLDG 345' Thickness: WA Exam 1:

VT-i ation:

Rx BLDG 345' Thickness: WA Exam 1: VT-1 SystemID: NB On-line No Safety Cass: I Exam 2: NWA System ID: NB On4tne No Safety Class: I Exam 2: UT System ID: NB On-tIne No Safety aass: I Exam 2 WA SystemIO: NB On-line No Safety Class: I Exam 2: WA ComponentID: 52-N

==

Description:==

RPV Nut Program: EIS Isometric:

IS!-RPV-103 ASMECategoy:

BC1 ASMElfem:

t8.10 NC ASSOCASUEFCATEGORY:

WVA ASSOCASUFlEtl.:

WA Ca Interval: 3 PerIodt: 3 Outage: 7 Comments: RR 5-4 atnws VT-1 hi 3eu of surface exam.

tm. Die.: WA

,i Blockt : WA 1.oc

i Edwin Gray - W-U-23 ISI Plan.rt Page 30 q IDCdnsen U RKlol of wcrwnvlur I

_ Date:

Dats:_

Page 1S of35 oUpmVISOI - coa0 rograms3 I.

k.. unoirJ;

Edwin Gray - RFO-23 ISI Planrtf Page 31 RFO-23 Total Scope - ISI Monday, September 23 2002 Component ID: 62-S DescriptIon:

RPVStud Program: MSI Isometric:

ISI-RPV-103 Loc ASMECategory:

B9-G1 AStEitrm:

9t.20 Nom. Dtb 5.06s ASSOCASMECATEGORY:

B-G-1 ASSOCASME ITEM:

86.30 Cal 8tock I: RPB-2 Interval: 3 PerIod: 3 Outage: 7 Comments: Detal Dvwing 5920484. Ur only during RFO-23.

alUon:

Rx LDG 345' Thickness: NA Exam : tI T System ID: NB On-4ine No Safety Class: 1 Exam 2: UT Component ID: e2-W9

==

Description:==

RPVNWashe Bushing Program: tSt Isometric:

ISI-RPV-103 Location:

ASMECatogrory:

t-0-1 ASWEitem:

B9.50 Nom. Dba_ WA ASSOCASMECATEGORY:

WA ASSOCASUEITEMt:

WA Cal Block 1: WA interval: 3 Period: 3 Outage: 7 Comments: Bushing visual not required when stud Is -bace.

Rx BLDG 345S Thickness: WA Exam 1: VT-I System ID: NB On-line No Safety Class: I Exam 2: WA ComponentitD: 63-N

==

Description:==

RN Not Progrnm: ISJ Isometrlc:

tS04t -t03 AStECategor,'

B9G-1 ASEltem:

90.10 No ASSOCASMElCATEGORY:

WA ASSOCASMEITEU:

WA Ca Interval: 3 Pentod: 3 Outage: 7 Comments: RR B-4 alows VT-1 in Neu of surfac exam.

tom Db:- WA I Block 1:

WA Location:

Rx BLDG 34S Thickness: WA L

Exam 1:

VT-I SystemID: NB Onlilne No SafetyClass: 1 Exam 2: WA Component ID: 63-S

==

Description:==

R VStud Program: ElI Isometric: ISI-RPV-103 ASUECategry:

B94--1 ASUEltem:

8620 Non ASSOCASMECATEGORY:

B-G-1 ASSOCASMEITEUt:

B930 Cal Interval: 3 Perlod: 3 Outage: 7 Comments: Dotal Drawing 5920404. UT only during RFO-23.

L Dba: 5AD Block 1: RP Location:

Rx BLDG 345' Thickness: WA 3-2 Exam 1:

UT System ID: NB Ontine to Safety Class: I Exam 2: MT

I.Edwin Gray - RFO-23 ISI Plan.rtf Page 321 Date:_

Page 16 o135 Ila Coo lnarw IV. = Mnn; Supervtsor -Code Pogrms (DLt Glnowr:,

Dat:____

I Edwin Gray - RFO-23 ISI Plan.rtf Page 331 RFO-23 Total Scope - ISI Monday September 23.2002 Component ID: 83-WA3 DescrIption.:

RPVfVsher1Busttng Program: LA hsomntrtc:

ISIlRPV-iO3 1

ASME Category: 1 ASUE htem: B8.50 Nam Dl.: NWA ASSOCASMECATEGORY:

N/A ASSOCASMEITEM':

N/A Cal Block 1: NWA hbterval: 3 Pertod:

3 Outage: 7 Comments: Bushing visual not required when stud Is hi-pbces.

Location:

Rx BLDG 34S Thickness: NtA Exam 1:

VT-t Location:

Rx BLDG 345 ThIckness: NWA Exam 1:

VT-i System iD: tNB On-tine No SafetyClass: I Exam 2: N/A System tO: NB On-lIne No Safety Class: I Exam 2: NWA ComponentID:

4-N

==

Description:==

RPV Nit Program: ISI isometric: E-RPV-103 ASMECategoryr B--4 ASMEttem:

B8tO NC ASSOCASMECATEGORY:

NWA ASSOCASMEtTEM:

NWA CA Interval: 3 Period: 3 Outage: 7 Comments: RR B 4 alows VT-l hI leu ot surface exarn.

lom DI.: N/A itBlock 1: NWA Component ID: 64-S DescrIption:

RPVStud Program: tSI Isometrc: ISilRPVtO3 ASUECategory:

B-CG-ASMEItem:

B820 Nfon ASSOCASAECATEGORY:

B-G-I ASSOCASMEflTEMi:

8830 Cal Interval: 3 PerIod: 3 Outage: 7 Commnents: DetulDrawing592-454. LTonlrdungRFO-23.

s. Die.: 5.08 Block 1: RP Location:

Px BLDG 34S Thickness: NtA B-2 Exam 1:

UT System ID: NB On-line No Safety class: I Exam 2: ur Component tD: t4-WlB

==

Description:==

RPVWasher/Bushing Program: IS1 Isometric: [SRP-103 Location:

ASUECategory:

B-Gt-ASME nm: 88.50 Nam. Die,: NtA ASSOCASUECATEGORY:

NWA ASSOCASME ITEM:

NWA Cat Block 1: NIA tnterval: 3 Pertod: 3 Outage: 7 Comments: Bushing vIsusl not required when stud Is hobplace.

Rx BLDG 345S Thickness: NWA Exam I:

VT-l System tD: NB Ontno No Safety Class: 1 Exam 2: NWA

[Edwin Gray - RFO-23 ISI Plan.rft Page 341 a

p t

_ ~

c e

3 IS, CoorefnatorfD. a KOng):

SupeMsors. Code Pmagrm

{D. C Girrotr:_

Date: -

Page 17of35

E.Edwin Gray - RFO-23 ISI Plan.rtff Page 35' i

RFO-23 Total Scope - ISI Monday, Sept ember 23. 2002 Component ID: SC Program ISI ASUE Category: B-A ASSOCASMECATEGORY:

NtA Interval: 3 PerIod: 3 Comments: None

==

Description:==

RPV Head to Flange Weld Isometric:

LSI-RPV-103 LocatIon:

ASMEthem:

B1.40 Norm DIl.: 217.00 ASSOCAStUEITEM:

NtA Cal Block 1: RV-2 Outage: 7 Rx BLDG 345' Thickness: 3.9375' Exam 1:

UT System ID: NB On-1ine No Safety Class: I Exam 2 UMT Component ID: NIO-SE Descriptfon:

Nozzle to Safe End Weld Program: tI3 Isometric:

ISl-RPV-103 Location:

OW 28g ASuECategoly:

B-F ASMEltem:

B5.20 Nonm Ia.: 2 Thickness: 0.2 ASSOCASMECATEGORY:

NtA ASSOCASAIEiTEM.:

NtA Cal Block 1:

Exam 1: PT Interval: 3 Period.: 3 Outage: 7 Comments: Augmented exam In accordance vIth BWRVP-27-A Per C. Larsen SystemIO: NB On-ftne Safety aass: I Exam 2: NWA ComponentlO: Nt2B-SE Program: Ml ASMIE Category:

B-F ASSOC ASME CATEGORY:

N/A interval: 3 Prhd 3 Comments: None Descriptfon:

Nozzle to Sa End Weld isometric: ISIRP-103 Location:

ASMEItem:

65.20 Nonm Dl: 3a00-ASSOCASMEITEM.:

N/A Cal Block 1: NtA Outage: 7 DW 290W Thickness: 0.531 Exam 1:

PT System ID: NB On-line No Saesty Cla.s: I Exam 2: NA System 10: NB On-fIne No Safety Class: I Exam 2: NWA Component ID: N4C-tR

==

Description:==

NozzleInnerRadolus Progrm: tSI Isometric:

ISI.RPV-103 ASMECategoy B6D ASUE hem:

B3.100 Nom. Da, I

ASSOCASMECATEGORY:

NtA ASSOCASMEITEM:

N/A Cal Block 1:

Interval: 3 Period: 3 Outage: 7 Comments: PeOomi examinatlon during RFO-23 o arma that was krmited during RFO-22.

0.7, W-.

Location:

OW 290' 5

7Thickness: 5.125 W.N4-IR Exam 1:

UTIR

IEd Win Gray - RFO-23 ISI Plan.rtf Page 36 IS Coorfinator ED. B. Wng):

OData:_

Page 18 of35 Supwvlsor -Code Progrnms (. CQ Ginori:.

Date:_

TM

,Edwin Qray - RFU-23 ISI Plan.rtf Page it I I -

-

1 RFO-23 Total Scope - ISI Monday. September23. 2002 Component ID: N58 Program:

ISI ASME Category:

B-D ASSOCASMECATEGORY:

N/A Interval: 3 Perlod: 3 Comments: None Descrption:

Nozzle to Vessel Weld isometric:

SI.RPV-103 Location:

ASMEitem:

83.90 Nom. Ma.: 3125' ASSOCASMEITEMA:

WA Cal Block I:

RV-3 Outage: 7 DW 290 Thickness: 55' Exam 1:

Ur System ID: NB On-line No Safety Class: I Exam 2: WA Component ID: N5BMJR Prog2m: ISI ASME Category: B-D ASSOCASMECATEGORY:

NIA interval: 3 Perrotd: 3 Conments: None

==

Description:==

Nozzle Inner Radius Isometric:

tSi-RPV.103 ASUEltem:

B3.100 Nom.

.a: 1 ASSOCASMEITEM:

NWA Cal Block 1:

Outage: 7 2.11 RV Locatilon:

DW 290' r

Thickness: B.25'

.3 Exam 1:

UTIR SystemID: NB On41ne No Safetyclass: 1 Exam 2: WA Component ID: NBA Program.: IS ASMECatgorvy 8-D ASSOCASUECATEGORY:

WA Interval: 3 Pertod: 3 Comments: Detail Dawing 5920.243

==

Description:==

Nozzle to Vessel Weld Isometric:

ISI-RPV.103 Locatilon:

ASAIE hem:

83.90 Nom Da.: 1B.75 ASSOCASMEITEMt:

NrA Cal Block I1: RV-2 Outage: 7 Rx 8LDG 345' Thickness: 31t75' Exam 1:

UT System ID: NB On-line No SafelyClass: I Exam 2: WA Component ID: NBMIR Program LOA ASAtECategory:

8D ASSOCAStECATEGORY:

NWA Interval: 3 Periodt: 3 Comments: Det2a Drawing 5920-243

==

Description:==

Nozzr Inner Radus Isometric:

IZtRPV-103 ASAIEItem:

83.100 Nom Dlx_ a ASSOCASME ITER:

NrA Cal Block 1:

Outage: 7 e.14 FNR Location:

R t BLDG 345S Thickness: 2.75 V-2 Exam 1:

UTIR System ID: NB Olne No Safety Crass: 1 Exam 2: NWA

Edwuin gray - RFO-23 1SltPlan.rtf

__Page 381 151 Coordlnafo fD. B King):__

Date:__

Page It of`33 Supervlsor. Code Programa a.arro:e_:

Date:_

r_=-^.

.1r,

-s~1l--~~

~

~~~^>~-

I^

Edwin Gray - RFO-23 ISIFPlanrtt Page 39 J RFO-23 Total Scope - ISI Monday, September 23, 2002 ComponentID: NMA-SE DescrIption: Nozzle toSafeEndWeld SystemlID: NB Program: ISI lsonetrrc: ISI-RPV-103 Location:

Fx BG 34S5 On-lIne No ASMECategory B-F ASMEftem+/-

BS.10 Norm Dia.: 90' Thickness: 1.C25' Safety Class: I ASSOCASMECATEGORY:

WA ASSOCASMErTEM,:

WA CalBlock 1: NZL,8-SE Exam1:

UT Exam 2: PT Interval: 3 Period: 3 Outage: 7 Comments: Weld Is below flush with surrounding base material 380 degrees. RT performed as Code required volumetric exam during Interval 2.

ComponenttD: N6t Program: ISI ASMECathgory B-0 ASSOC AStME CATEGORY: WA Interval: 3 PerIod: 3 Comments: Detail Drawing 5920243

==

Description:==

Nozzle to Vessel Weld Isometric: ISIRPV-103 Location:

ASMEltnm: 93.90 Nonrm DM.: 18.75' ASSOCASMEITEM:

WA Cal Block 1: RV-2 Outage: 7 Rx BLDG 345' Thickness: 11675*

Exam 1: UT System ID: NB On-lne No Safety Class: I Exam 2: WA Component l:

N5B-4R Program: 3SI ASME Calegory B-D ASSOCASMECATEGORY:

NWA Interval: 3 Period.: 3 Comments: Detail Drawing 5920-243

==

Description:==

NozzleInnerRadius Isome tric:

S14-ROV-103 ASMEItem: B3.100 Norm Dbe.: r ASSOCASUWEITEU.:

WA Cal Block 1:

Outage: 7

.14' RV Location:

Rx BLDG 345' Thickness: 2.75' 12 Exam 1:

UVIR System ID: NB On-ine No Safety Class: t Exam 2: WA Component AD: NBB-SE Ptogranm ISI ASMErCategory:

S.F ASSOCASME CATEGORY: WA Interval: 3 Period: 3

==

Description:==

Nozzle to Safe End Weld Isometric:

IS4lRPV-103 Location:

ASMEIIE em: 85.10 NOn, DU.: 90-ASSOCASMEITEU.:

WA Cal Block 1: NL-8-SE Outage: 7 Px BLDG 345' Thickness: 1.825' Exam 1: UT System ID: NB On-line No SafetyClass: I Exam 2: PT Comments: Detal Drawing 5920-243. PT performed as Code required volumetric exam during Intervt 2.

_==

M -

 -

IEdwin Gray - RFU-Z3 ISI Plan.rtt Page 40 1 IS1 Cordnafo (D. a. Kwn'99:

_ Dato.:__

Date:_

Page 20 Of35 Supevisor -Code Po grams fL C. GWirrJ:

I EdwiffGay - RFO-23 -IS I Plami-tf Page 41 1i U

RFO-23 Total Scope - ISI Monday, September 23,2002 Componentr.D: N7 Program: ISt ASUE Catego B-D ASSOCASME CATEGORY. NA Interval: 3 Periodr: 3 Comments: Detail Daving 5920-243 Component ID: N7-B Program: ISt ASEC ategoryr B-0-2 ASSOCASME CATEGORY:

WA Interal: 3 PerIod: 3 Comments: Deta3 DravIng 5920.243 ComponentlD: N74R Program: ISI ASUECategoy: B-D ASSOC AStE CATEGORY: NA Interval: 3 Pertod: 3 Comments: Detal Drawing 5920-243

==

Description:==

Nozzle to Vessel Weld Isometric:

ISI-RPV-103 Location:

ASME Item: B3.90 1Noam DI:- 12.50 ASSOCASMEITIEM.:

WA CaI Block 1: RV-2 outage: 7 Rx BLDG 345S Thickness: 3.1875' Exam 1:

UT

==

Description:==

Flange Boiling Isometric:

ISI-RPV-103 ASMEItem:

B7.50 Nom. DA ASSOC ASME ITEM:

NA Cal Bloc Outage: 7 aI: WA k 1: WN Location:

Rx BLDG 345 Thickness: WA A

Exam 1:

VT-I System ID: NB On-lne No Safety Class: 1 Exam 2:

WA System ID: N3 On-ine No Safety Class: I Exam 2: NIA System ID: NB On-line No Salety Class: I Exam 2: WA

==

Description:==

NozzleInnerRaclus Isometric: IS-RPV-103 Location:

ASMEItem:

B3.100 Nonm Dia.: 420 ASSOCASMEITEM.:

WA Cal Block 1: RV-2 Outage: 7 Rxt BLDG 345S Thickness: 1.8325 Exam 1:

UTIR Component ID: N7-SE

==

Description:==

Nozzle to Safe End Weld Progrom:

ISI Isomeftc:

ISI-RPV-103 Location:

ASUtECategoq B-F ASUEItem:

5B.10 Nom Vs.: 6.37 ASSOCASMECATEGORY:

WA ASSOCASME ITEM:

WA Cal Block 1: NZL48-SE interval: 3 Period: 3 Outage: 7 Comments: Detal Drawing 5920-243. RT Perfonmed as Code required volumetric ecxm dutng Interval 2.

Rx BLDG 345S Thickness: 12745' Exam 1:

UT System ID: NB Online No Safety Class: I Exam2. PFT

l Edwin Gray - RFO-23 151 Plan.rtf Page 42 1 ISI Coonflnitor(

EL aWngl:_

SupenWsor - Code Ptograms (a Ci G/oklr:.

Date:_

Page 21 of35 D at e: _ _ _ _ _ _

UEd W-iriGra -RFO--23]ISI Plarinrtf Page 431

.1 RFO-23 Total Scope - ISI Monday, September23. 2002 Component ID: N9 Program: ESl Is ASME Category:.,

0 A:

ASSOCASMECATEGORY:

NWA A.

Interval,: 3 Perdod: 3 0

Comments: None Component ID: N94R Program: ISI is ASUMECategory:

-0 A'

ASSOCASMECATEGORY:

NWA A.

Interval: 3 Pertod: 3 0

Comments: None Component ID: NO-SE Program: ISt is ASUE Category B-F A,

ASSOC AStUE CATEGORY:

NWA A'

Interval: 3 Period: 3 0

Comments: Fallt ofDM weld cut and capped

==

Description:==

Nozzle to Vessel Weld ometflc: ISI-RPV-103 Location:

SUEt/em:

B3.90 Norm D/a.: 17.75 SSOCASMEtTEM:

NWA CalBlock1: RV-3 utage: 7 DescrIption:

Nozzle Inner Radius ometrtc:

ISI-RPV-103 Location:

SUE /te=

B3.100 Nomr. DMa 4.12 SSOC ASME ITEUb: NA Cal Block 1: RV-3 utago: 7

==

Description:==

Circumferential Weld. No2zle to Cap ometrtc: ISI-RPV-103 Locatlon:

SME he B5.10 Nomn DIt.: t.5' SSOCASMElTEUt:

NWA CalBlock I: WCRD-2 Lu/ge: 7 DW 290 Thickness: 5.5' Exam 1:

UT DW 290 Thickness: 4.0 Exam t: UTIR DW 290 Thickness:.875' Exam 1:

UT System ID: NB On-line No Safety Class: 1 Exam 2: NWA SystemlDD: NB On-i/ne No Safety Crass: I Exam 2: NWA System ID: NB On-tne No Safety Class: I Exam 2 PT ComponentlID: RPV SUPPORTSIORT DescrIption:

Component Support Integral Atachment (Reactor Pressur Vessel Support Skkt)

Program: tI Isometric: ISI-RPV-103 Location:

OW 251 ASM(E Category:

F-A ASUE lt*m F1.40 Nor. DM, NWA Thickness: 4.5 ASSOCASUEC4TEGORY:

B-K ASSOCASUEtTEt.:

B10110 Ca/Block t: NWA Exam I:

VT-3 Interval: 3 PerIod: 3 Outage: 7 Comments: ASME Section Xl, 1998 Edition though 2000 Addenda sgnaws single sided surface examinalton. the Pmposed Rulernal". Vol. 88 SystemID: NB On-line No Safety Class: 1 Exam 2. LIT

I.dwin Gray - RFO-23 ISI Plan.rtf Page 441 Ist Cooorawtor (a R rCng):*

Date:

Page 22 odS Supevmsor - Cods Progranms (/e. G wrnoiiJ:

Edwin Gray - RFO-23 ISI Plan.rtf Page 45

.._79......

RFO-23 Total Scope - ISI Monday, September 23.2002 ComponentID: V2-53A

==

Description:==

ValveBodyandBolting Program:

tSI Isometric: ISI-59206-22 SH I Location:

OW 238 ASME Category 2 ASUElhem:

B730 Norm Dia.: 28.00r Thickness: NA ASSOCASMECATEGORY:

B-M-2 ASSOCASMEITEM,:

B12.50 CalBlockl: WA Exam 1:

VT-1 Interval: 3 Period: 3 Outage: 7 Comments: Bodtng VT.1 cheduled during RFO-23 as the nesult of 'Outage 8 eew.

System ID: NS Onlins No Safety Class: I Exram 2: VT-3 ComponentID: VESSELCLADDING

==

Description:==

Vessel dadding Program: ElS Isometric:

lSI-RPV-103 ASMECategory:

F-AUG ASMEttem:

WA NonL CIa.

ASSOCAsMECATEGORY:

WA ASSOC ASMEITEM.:

WA Cal Block Interval: 3 Pridod: 3 OUage: 7 Comments: See previous data tor Ur technlque.May require confined space training.

  • WA 1 t: WN Location:

Rx BLDG 345' Thickness: NA A

Exam 1:

UT System ID: NB On-l1ne No Safety Class: 1 Exam 2: WA Component ID: H-E-8A

==

Description:==

Component Support, Integral Atachdment (RBCCW Heat Exchanger E-8IA)

Program: ISt Isometric: ISRCW-PART4SHNI Location:

RxBLDG 303!

ASME Categoryr F-A ASMEI1hm:

F140 Norm DU.: WA Thickness: WA ASSOCASMECATEGORY:

D-A ASSOCASMEITEM:

D1.10 Cal Block I:

WA Exam 1: VT-3 Interval: 3 Period: 3 Outage: 7 Comrments: Refer to Code Case N-509 toe D-A. VT-i only scheduled during RFO-23 System ID: RBCCW On-Ine Yes Safety Class: 3 Exam 2: VT-1 ComponentID: H-TK-7-tA

==

Description:==

Cornponent Support. IntegralAttadhment(RBCCWSurgeTank T-K-71A)

Progam: ISI isometric: El-RCW-PART3SHI Location:

RxBLDG 318' ASMECategory D-A ASUEltem: D10 Nom b

Di: WA Thickness: WA ASSOCASMECATEGORY:

F-A ASSOCASMEITEM:

F1.40 Cal Block 1: WA Exam 1: VT-I Interval: 3 Period: 3 Outage: 7 Commrents: Refer to Code Case N-509 tor D-A Category. VT-I only scheduled during RFO-23 System ID:

tRBCCW On-line Yes Safety Class: 3 Exam 2: VT-4

I edwin Gray - RFO-23 ISI Plan.rtf Page 46 b

50 I-w - -ctu gi. 0. nJ Supervisor - Code Pfogxams (D C C lrrohd:

Date:_

Page 23 ot3f5

V-

I Fzdwin Qray - RFU-23 161 Planrtt Page 411 I



RFO-23 Total Scope - ISI Monday. S Component lO: A-HTEX10-1 Program: LS ASME Category:

C-A ASSOCASUECATEGORY:

WA Intervat: 3 Period: 3 Comments: None

==

Description:==

RHR Heat ExchangerShe toFlange Clroumferental Weld Isometric: ISl-RPV-104 Location:

NECR 23Z ASUEhtem:

C1.10 Nom. DVA 48.0tr Thickness: 0.690 ASSOCASMEtTEM:

WA Cal Btock 1: WV6Y Exam 1:

UT Outage: 7 Sptember 23X 2002 System ID: RHR On-line Yes Safety Class: 2 Exam 2: WA Component ID: A-N4 Program:

/IS ASUECategory:

C-B ASSOCASUECATEGORY:

C-B Interval: 3 PerIod.: 3 Comments: None Descrptilon:

Nozzle to Vessel Weld isometric: tSI-RPV-104 Location:

NECR 232' AStEthem:

C231 Nom. Dia.: 44.58 Thickness: WA ASSOCASMEItEME:

C2.33 Cal Block 1: WA Exam 1:

MT Outage: 7 System ID: RHR On-tne Yes Safety Class: 2 Exam 2: vr-2 Component ID: HA-RHR-CC1

==

Description:==

Cc E-Program: El Isometrlc.t:

tSI-RPV-104 ASUE Category:

C-C ASMEltem:

C3.10 ASSOCASME CATEGORY:

F-A ASSOC ASME ITEM:

F140 Interval: 3 Period: 3 Outage: 7 Comments: Integral attachment Vr-3 onty scheduled during RFO-23 Component/D:.HA-RHR-CC-2 Descriptiono Cc E-1 Program:

It Isometric: ISI-RPV1-04 AStECartgory C-C ASUMEitem:

C310 ASSOCASMECATEGORY:

F-A ASSOCASU ITEME: F140 Interval: 3 Period: 3 Outage: 7 Comments: VT-3 only scheduled during RFO-23 onponent Support Intengral Atachment (RHR Heat Exchanger 14-1A)

Location: NECR 23Z Nom Die: 44.5r Thickness: WA Cal BVock t: WA Exam 1:

MT System ID: RHR On-ftne Yes Safety Class: 2 Exam 2: Vr-3 System ID: RHR On-One Yes Safety Class: 2 Exam 2: Vr-3 omponent Support Integral Allachment (RHR Heat Exchanger

-144A)

Location:

NECR 232' Non. Db.: 4458 Thickness: WA Cal Block 1: WA Exam 1:

MT

GFdw-

-,ra-y - RFO-23 ISI Plan.rtf a!J ISI Cooed~ntor (D.aRKing):______________________

Dats:_____

Page 24 of 35 Supervtsor. code Pmgtams (D. a. Gcur:_____________________

Date:____

I Edwin 5~ray - RFO-23 ISI Plan rtf Page 491 RFO-23 Total Scope - ISI Component ID: H-A-RHR-CC-3 Monday. September23 2002 Descrnption:

Component Support Integral Attachment (RHR Heat Exchanger E.14.tA)

Program: ISI isometric: ISI-RPV-104 Location:

NECR 212 ASUECaregory:

C-C ASMEltem:

C3.10 Nomn.

Dha.: 445r Thickness: WA ASSOCASAIECATEGORY:

F-A ASSOCASMEITEMt:

F1.40 CalBlock 1: WA Exam 1: M6T Interval: 3 Pertod: 3 Outage: 7 Comments: Integral aacrhment. LT and Vr-3 crheduled during RFO-23 System ID: RHR On-line Yes Safety Class: 2 Exam 2: VT43 System ID: RHR On4lne Yes Safety Class: 2 Exam 2: VT-3 Component ID: H-A-RHR-CC4

==

Description:==

Component Support. Integral Attachment (RHR Heat Exchanger E.14-1A)

Program: ISI Isometric: ISI-RPV-104 L

ASE Category:

C-C ASMEItrem:

C3.10 Nonm Di.: 44.58 ASSOCASMECATEGORY:

F-A ASSOCASMEITEM:

F1.40 Cal Block 1: WA Interval: 3 Period.: 3 Outage: 7 Comrnments: VT43 only scheduled during RFO-23 ocation:

NECR 232 Thickness: WA Exam 1: MT Component ID: RH5A-S209 Program: tSt ASME Category:

C-F-2 ASSOC ASE CATEGORY: WA Interval: 3 Period: 3 Comments: None

==

Description:==

Circumferential Weld. Pipe to Elbow Isormetdl: ESl-RHR-PART t1SH 3 Location:

ASE Item:

C5.51 Nom. DVa.: 1G.D0 ASSOCASMEfTEM.:

WA Cal Block t: VY-15 Outage: 7 NECR 232 Thickness:.375-Exam 1:

Ur System ID: RHR On-lne Yes Safety Class: 2 Exam 2: MT ComponentliD: RH5B-S220 Program: tSI ASMECategory:

C-F-2 ASSOC ASME CATEGORY: NWA Interval: 3 Period: 3 Comments: None

==

Description:==

CkcumferentlalWeld. PpetoValveVIO-28B Isometrtc:

SI-5920-9288 Location:

SECR 232 ASMEen.m:

C5.51 NonL Die.: 1t.00 ThIckness:.375-ASSOCASMEtTItM:

WA Cal Block 1: VY-87 Exam I: UT Outage: 7 System ID: RHR On-lne Yes Safety Cass: 2 Exam 2: MT

Iwin Gray - RFO-23 ISI Plan.rf Page 50 IS? CoocInator (I. ELl Kng):__

Date:_

Page 25 of3S Supervisor - Code Pogranms (. CQ Giroiro:

Date.:_l

I Edwin Gray - RFO-23 ISI Planrtf Page 51 i RFO-23 Total Scope -ISI Component ID: RHB-S231

==

Description:==

Clrnumferenflal Weld. Valve to Pipe Program:

ISI Isometric:

ISI-RHR-PARTIISH3 Location:

ASME Category C-F-2 ASUE htem:

C5.51 Norm Dia.: 20.00' ASSOCASUECATEGORY:

WA ASSOC ASMoEtTEM:

WIA Cal Block 1: W-S2 Interval: 3 Period.: 3 Outage: 7 Comments: None Component ID: RH-S233

==

Description:==

Circumerentsl Weld. Pipe to Tee Program: Et Isometric:

IS9I-R -PARTIISH3 Location:

ASMECategoy:

COF-2 ASME item:

CS.51 Norm D.:

20.00' ASSOCASUECATEGORY:

NWA ASSOCAS4EITEMr :

WA Cal Block 1: WS-2 Interval: 3 Period: 3 Outage: 7 Comments: None Component ID: RH7-S261

==

Description:==

ClrcumferentalWeld. Pip.eTee Program: ISE Isometric:

15S-5920-9288 Location:

AStE Category:

C-FP2 ASME ltem: CS.51 Nom. DOa.: 20.00' ASSOCASUECATEGORY:

WA ASSOCASMEITrEM:

NWA Cal Block 1: W42 Interval: 3 Period: 3 Outage: 7 Comments: None ComponntID: RHRH-187 Descripton:

RestraintIntegralAlladhmeni Program: ElS Isometric: ISI-RHR-PARTIISH3 Location:

ASMECategory F-A ASMEIt em: F1.20 Nom. Die.: NWA ASSOCASME CATEGORY:

C-C ASSOCASMEITEU.:

C3.20 Cal Block 1: WA Interval: 3 Period: 3 Outage: 7 Comments: Refer to Code Case N-509 for CC Category, PT and VT-3 scheduled dwung RFO-23 Monday. September 23 2002 NECR 232' Thickness:.500' Exam 1:

UT NECR 23Z Thrckness:.500' Exam 1:

UT SECR 213' Thickness:.500' Exam 1:

UT NEaR 232?

ThIckness: W/A Exam 1:

VT-3 System ID: RHR On-line Yes Safety Class: 2 Exam 2:

MT System ID: RHR On-line Yes SafetyClass: 2 Exam 2: MT System ID: RHR On-line Yes Safety Class: 2 Exam 2. IFT System ID. RHR On-line Yes Safety Class: 2 Exam 2: PT

I gdwin Pray - RFO-23 ISI Plan.rtf Page 521I

-0 ICOIIW U 0. -l1U.

Supetrsor. Code Progrms (tM C. Girrmil:_

_ Datb:_

Date:

Page 26 of35

I Fdwin Csray - RFO-23 ISI Plan.rtf Page 531 RFO-23 Total Scope - ISI Monday, September23, 2002 Component ID: RHR-HO200B Program: ISI ASME Category:

F-A ASSOC ASME CATEGORY: W/A Interval: 3 PerIod: 3 Comments: None Descriptlon: Restaint Isometrie: ESl-RHR-PMARTt1 SH2 Location:

NECR 23Z ASME tem: F1.20 Nom, We.: NWA Thickness: NWA ASSOCASMEITEM:

NWA Cal Block 1: NWA Exam 1:

VT-3 Outage: 7 System ID: RHiR On-OFne Yes SatltyCiass: 2 Exam 2: NtA ComponentID: V10-27A

==

Description:==

Valve Body and Bolting Proganm: Ml IsometrIc:

ESl-RHR-PART II SH I Location:

ASUECategory:

B-G-2 ASUEthem:

B7.70 Nom. Da.: 24.00 ASSOCASMECATEGORY:

B94-2 ASSOCASMEITEM/:

12Z50 CatBlockS: NWA Interval: 3 Period: 3 Outage: 7 Comments: Bolling VT-1 schediuled uring RFO.23 as the result otOutage Jr reiew.

Rx BLDG 25Z Thickness: NWA Exam t: VT-1 System ID: RHR On-tne Yes SafetyClass: I Exam 2: VT-3 Systm ID: RHIR On41ne No Safety ass: I Exam 2: VT-3 Component I: V1O-83 DescripUton: ValveBody andBoiling Program:

t Isometric:

IS1-5920-022 SH I Location:

DW 269 ASME Category:

9-G-2 ASMEItem:

97.70 Nom DI&.: 20,00 ThIckness: NWA ASSOCASMECATEGORY:

B-FA2 ASSOCASMEITEtU:

812.50 Calitlock : NWA Exam 1:

VT-1 Interval: 3 Period: 3 Outage: 7 Connts: Bolting VT-1 schdueed during RFO-23 as the result ot Outage tr review Component tD: RSW-HISS Program: ISI ASWE Category: D-A ASSOCASMECATEGORY:

F-A Interval: 3 Period: 3 Comments: None

==

Description:==

Anchor. Integral Attahmnent Isometric:

E31-SW-PART 1 SH 2 Location:

ASME nem 01.20 Nom DOI: N/A ASSOCASMEIrEEM:

F1.30 CalBlock 1: N/A Outage: 7 TORUS CTWLK 239' Thickness: N/A Exam t: VT-3 SystemID: RHRSW On-1ine Yes Safety Class: 3 Exam 2: VT-3

I Edwin Gray - RFO-23 ISI Plan.rtf Page 54I mi kv!c~oordnator(D. B.Kng):*

Date:_

Page 27 035

_A.

CW P e VISOr.G ~aM rr ugraM 3 (LA. .L I. JvW r

_ _ __ _ _ _ __ _ _ __ _ _ __ _ _ _ __ _ _ __ _ _ _ m arw: __ __ __

l Fdwin Gray - RFO-23 ISI Planrtf Page 55d RFO-23 Total Scope -ISI "oniay, September 23 2002 ComponentID: RSW-H168 Program: El1 AsME Categoy D-A ASSOCASMEC ATEGORY: F-A Interval: 3 Period: 3 Corments: None ComponentID: RSW-H1t9 Program: El1 ASME Category: D-A ASSOC ASE CATEGORY: F-A Interval: 3 PerIod: 3 Comments: None Component ID: RSW-HI170 Program ESl ASE Category:

D-A ASSOC ASWECATEGORY: F-A Interval: 3 Pertod: 3 Comments: None ComponenttDO: RSW-H1T7 Program: ElI ASMECatyo.

D-A ASSOCASUE CATEGORY:

F-A Interval: 3 Perbod: 3 Comments: None

==

Description:==

Restraint. Integral Attachment Isometric:

1S3SVW-PART 1 SH 2 LocatIon:

ASME ttem: D120 Nonr DU.: WA ASSOCASMEITEM:

F1.30 Cal Block 1: WA Outage:

7 DescrIpton:

Restnint.lntegral Attatment Isometric:

I1S-SW-PART t SH 2 Location:

ASMEttem:

D120 Nom DU.: WA ASSOCASMEITEM:

F1.30 Ca Block 1: WA Outage:

7

==

Description:==

Restaint Integral Attachment Isometric:

1314W-PART 9 Location:

ASMEIt em: D120 Norm Dlab WA ASSOCASMEITEM:

F130 Cal Block 1: NtA Outage: 7

==

Description:==

Restraln IntegralAfachment Isometric: ISt-SW-PART SH 2 Location:

ASMEItem: D120 Nom. Dib: WA ASSOCASMEITEMi:

F1.30 Cal Block 1: NWA Outage: 7 Rx BLDG 280 Thickness: NA Exam 1:

VT-3 Rx BLDG 280 Thsickness: WA Exam 1:

VT-3 Rx BLG 2B0 Thickness: WA Exam 1: Vr-3 Rx BLDG 28 Thickness: WA Exam 1: vr-3 System ID: RHRSW On-flne Yes Safety lass: 3 Exam 2: VT-3 System ID: RHRSW On-lne Yes Safety Class: 3 Exam 2: VT-3 System ID: RJHRSW Ons-ine Yes Safety Class: 3 Exam 2: VT-3 System ID: RHRSW On-line Yes Safety Class: 3 Exam 2: VT-3

I Edwin gray - RFO-23 ISI Plan.rtf Page 561 ISI Coordnator (D. B. KJng):_

Supwvtsor -Code PRograms

_ Datv:_

Da t:_

Page 28 of35 (D. C. Girrofr:

I Edwin Gray - RFO-23 ISI Plan.rtf Page 571 RFO-23 Total Scope - ISI Monday, September23. 2002 ComponentID.: RSW-H179 Program: ISI ASUE Category:

D-A ASSOC ASME CATEGORY:

F-A Interval: 3 Period: 3 Comments: None Componentl0: RSW-H180 Program: ISI ASMECategory:

D-A ASSOCAStE CATEGORY: F-A Intervala: 3 Period: 3 Comments: None ComponenttD: RSW-W21 Program: IS)

AStECategory D-A ASSOCASME CATEGORY:

F-A Interval: 3 Period: 3 Comments: None Component tO: RSWHZ20 Program-ISI ASME Category:

D-A ASSOCASME CATEGORY:

F-A Interval: 3 PerIod: 3 Comments: None

==

Description:==

Restraint IntegralAttachment Isometric:

IS1-SW-PART 9 Location:

ASMEltem:

D1.20 Nonm DIa.: WA ASSOCASMEtTEM:

F130 Cal Block 1: WA Outage: 7

==

Description:==

Restraint IntegralAttachment Isometric:

1St-SW-PART6SH2 Location:

ASMEItem:

D1.20 Nom. Dia.: WA ASSOC ASME fTEM:

F1.30 Cal Block 1: NIA Outage: 7

==

Description:==

RestralnL Integral Attacment Isometrfc:

ISt1SW-PART2SH3 Location:

ASME tem:

D1.20 Norm Dl:a WA ASSOCASMErTEM:

F1I30 Cal Block 1: WA Outage: 7

==

Description:==

Reslrsit. titegrl Attachment Isometric: tSI-SW-PART2SH4 Location:

ASMEftem:

D1.20 Nom. Dbl*

WA ASSOCASME ITEM:

F130 Cal Block 1: WA Outage: 7 Rx BLDG 2W0 Thickness: WA Exam 1:

VT-3 Rx BLDG 2BO Thickness: WA Exam t: VT-3 NECR 232 Thickness: WA Exam 1:

VT-3 NECR 23z ThIckness:

WA Exam 1:

VT-3 System ID: RHRSW On-lIne No Safety Class: 3 Exam 2: VT-3 System ID: RHRSW On-line No Safety Class: 3 Exam 2: VT-3 System ID: RHRSW On-lne Yes Safety Class: 3 Exam 2: VT-3 System lD: RHRSW On-ln Yes Safety Class: 3 Exam 2 VT-3

IdFb-w Gray - RFO-23 Sl Pian.rf Page 58]

MS Coondgnator (fD It ing):__

Datea_

Page 29 of35 Supir'sor. Code "grams (a Ca Glkow):_

Oa.:_

I F-dwin Gray - RFO-23 ISI Plan;rtf Page 59\\

RFO-23 Total Scope - ISI Monday. September 23t2002 Component ID: RSW-N221 Program: ISI ASMhECategory:

DA ASSOC ASE CATEGORY: F-A Interval: 3 Period: 3 Comments: None Component ID: RSW-H228A Program: ISI AWSEECatgory D-A ASSOC ASE CATEGORY:

F-A Interval: 3 PerIod: 3 Comments: None ComponenttD: RSW-H2288 Program: ISI AS/lECategory: D-A ASSOCASME CATEGORY:

F-A Interval: 3 Period: 3 Comments: None ComponenttDO: RSW-Ht232 Program:

[SI ASUE Category:

D-A ASSOC ASME CATEGORY: F-A itervalt: 3 Period: 3 Comments: None

==

Description:==

Restraint. Integral Axtchment Isometric: ISI-SW-PART2SH4 Location:

ASWEltem:

D1.20 Nom. Dta-NWA ASSOCASMEITEMt:

F1.30 Cat Block t: WA Outage: 7

==

Description:==

RestraInt Integral Attschment Isometric:

ISI-SW-PART3SH4 Location:

A SWEltem:

0120 Nom Dlj_ W/A ASSOCASME ITEM.: Ft.30 Cal Block 1: NWA Outage: 7

==

Description:==

Restilnt integralAlttchment Isometric:

1SSW-PART 3SH4 Location:

ASUEltemn D1.20 Nom DUt: N/A ASSOCASMEtrEU:

F1.30 Cal BIock 1: NWA Outage: 7

==

Description:==

Restrint. Integral Attachment Isometric:

tSI-SW-PART 10 SH S Location:

ASUEtEhm:

D120 Nomr Dla NWA ASSOCASMEtTEi.:

Ft.30 Cal Block 1: NA Outage: 7 NECR 232' Thickness: NWA Exam 1: VT-3 INTAKE 237' Thickness: N/A Exam 1:

VT-3 INTAKE 23r Thickness: N/A Exam 1:

VT-3 SECR 23Z Thickness: N/A Exam t: VT-3 System ID: RHRSW On-ttne Yes Safety aass: 3 Exam 2: VT-3 Systm ID: RHRSW On-tine Yes SafetyCIass: 3 Exam 2: VT-3 System ID: RHRSW On-then Yes Safety Class: 3 Exam 2: VT-3 System ID: RHRSW On-tine Yes Safety Class: 3 Exam 2: VT-3

I tdwin gray - KI-O-zi ISI Plan.rtf Page 6u N 1Sf Coordlmtor(D. B. King):

Supervfsor Code Pograms (D. C GltroI4:.

Date:

Date:

Page 30 of3S

I Vdwin Gray - RFO-23 ISI Pian.rtf Page 61 I RFO-23 Total Scope - ISI Monday. September 23 2002 Component ID: RSW41t233 Program: ElI ASMECategory:

D-A ASSOCAS4FECATEGORY:

F-A Interval: 3 Period: 3 Comments: None Component ID: RSW-HD21 8 Program: EtS ASME Category D-A ASSOC ASME CATEGORY:

F-A Inter.l: 3 Period: 3 Comments: None ComponentlO: RSW-HD225A Program: ESl ASME Category:

F-A ASSOCASME CATEGORY:

N1A Interval: 3 Period: 3 Comments: None Component ID: RSW-HD88C Program: ISI ASME Category F-A ASSOCASUECATEGORY:

WA Interval: 3 Pertod: 3 Comments: None

==

Description:==

RestrIlnt, Integral Aftahdment Isometric:

El1-SW-PART 10 SH5 L ocation:

ASMEttem:

D1.20 Nom. Dl.: WA ASSOCASMEITEM:

F1.30 Cal Block t: NIA Outage: 7

==

Description:==

Andwo. Integral Attachment Isometrtc: ISt-SW-PART2 SH 3 Location:

ASMEItwem:

D120 Norm Dla_ WA ASSOCASMEtTEM:

F1.30 Cal Block 1: WA Outage: 7 SECR 23Z ThIckness:

WIA Exam 1:

VT-3 NECR 232 Thickness: WA Exam 1: VT-3 System ID: RHRSW On-line Yes Safety Class: 3 Exam 2: VT-3 System ID: RHRSW On-11ne Yes SaetNyClass: 3 Exam 2: VT-3 System ID: RHRSW On-ine Yes Safety Class: 3 Exam 2: WA System mD:,RRSW On-ine Yes Safety Class: 3 Exam 2: WA DescrIption:

Gr2,Aty Hanger Isometric: ISI-SW-PART4 SH3 ASMEltem:

F130 Nonm DA ASSOC ASME ITEM:

NA Cal Bloc Outage: 7

==

Description:==

Gralty Hanger Isometric:

1El-SW-PART 2 SH1 ASMEItem:

F130 Nom DIA ASSOCASMEITE4:

NA Cal Bloc Outage: 7 I.: WA k1: WN iW: WA k1: W)

Location:

SECR 23Z Thickness: NWA S

Exam 1: VT-3 Location: NECR 23Z Thickness: WA A

EExam 1:

VT-3

Edwin Gray-RFO-23TISI Pan.rtf K

.........a....

Page 62 ISV Cooenato {(D B. King):

Supervisor - Code Programs (D. C GfTrof4:.

Date:_

Pop 31 of 35 Date:_

I --

l.

I Vdwin Liray - KR-U-23 ISI PlanrtI Page 631 RFO-23 Total Scope - ISI Monday, September 23 2002 System ID: RWCU On-line No Component ID: CU-2 Program: ISI ASME Category:

F-A ASSOC ASME C4TEGORY:

NWA Interval: 3 PerIod: 3 Comments: None

==

Description:==

Hydraulc Snubber lsometric:

I14-5920-822 SH I Location:

DW 269' ASEtEltem:

FI.1O ASSOC ASME ITEM:

WA Outage: 7 Non. DIl: WA Cal Block 1: WA Thickness: NtA Safety Class: 1 Exam 1:

VT-3 Exam2:

tWA Component)ID: ACSP-H201A Program: ISt IsometrIc:

ASME Category:

WA ASMEhtem:

ASSOCASMECATEGORY:

NA ASSOCASh Interval: 3 Period: 3 Outage: 7 Comments: Augmented Seismic Support Program

==

Description:==

Restraint ISI-AC PART 5 NA Nor 4E ITEM:

WA Cal L DIr: NA Block t: NA Location: Rx BLDG 303 Thickness: WA I

Exam 1: VT-3 System ID: S8GT On-Oine Yes Safety Class.: NNS Exam 2: NWA ComponentitD: ACSP-HO203B Program 6tI ASMECate ory:

F-A ASSOCASUE CATEGORY:

WA Inervl: 3 PerIodr:

3 Comments: None

==

Description:==

Grailty Hanger lsometric:

131-5920-9201 Location: Rx BLDG 280 ASMEltem: F1.20 NonmDVe.:

WA Thickness: WA ASSOCASMEITEM,:

NtA Ca Block1: NA Exam 1:

VT-3 Outage: 7 System ID: S8GT On-line Yes Safety Class: 2 Exam 2: WA Component iD:

SL11I-F0 Program: ISt ASUECatory: BtJ ASSOCASME CATEGORY:

NA Interval: 3 Period: 3 Comments: None

==

Description:==

Crcumterental Wed. Pipe to Ebow Isometric:

ISI-SLC-PART4 ASMEtt m: B9.40 ASSOCASME ITEM,:

WA Outage: 7 Location:

Rx BLDG 25Z Necm. Dia.:

1.50 Thickness:.200 Calttocki: NA Exam 1:

PT System ID: SLC Or-Ine Yes Safhty Class: I Exam 2. NtA

K--

-,71 i,

Itiawin uray - Kt-u-zd 18i iansit Page b4 I fol Coordinatr4u I" LngJ:

v ars. ______

Pa g32 o33 Supewvs or Code Pogms (D. C Glrro/):

Date:_

Edwin.Gray - RFO-23 ISI Planrtf Page 65e RFO-23 Total Scope - IS!

Monday, September23, 2002 Component ID: SLt-Ft1I Program: IEl ASUE Category:

B4-ASSOC ASME CATEGORY:

WA Interval: 3 Period: 3 Comments: None

==

Description:==

Cinrumfenisl Weld. Ebow to Pipe Isometric: ISI-SLC.PART4 Location:

ASME Iem:

B9.40 Non Via.: 1.50 ASSOCASMEITEM:

WA Cal Block 1: WA Watage: 7 Rx BLDG 25Z Thckness:.200-Exam 1: PT System ID: SLC On-ftne Yes Safety Crass: I Exam 2: WA ComponentIO: SLII-F4 Program: Ml ASME Category: B-J ASSOC ASME CATEGORY:

WA intera: 3 Period: 3 Comments: None

==

Description:==

Orummerenttsl Weld, Ppe to Tee isometric:

IS-SLC-PART4 Location:

ASME Item:

89.40 Non. Dia.: 1.50' ASSOCASMEITEM:

WA Cal Block 1: WA Outage: 7 RX BLDG 25Z Thickness: 200' Exam 1:

PT System ID: SLC On-lne Yes Safety Class: I Exam 2: WA ComponentID: SLI1-FS Program:

lEt ASMECategorey B-8 ASSOCASMECATEGORY:

WA Interval: 3 Period:

3 Comments: None

==

Description:==

Ccumrnerentfls Weld Tee to Pipe Isometric:

tSl-SLC-PART 4 Location:

ASMEItem:

B9.40 Nom. DiOx t.50 ASSOCASMEITEM:

WA CalBlock 1: WA Oautge: 7 R BLDG 25Z Thickness:.200' Exam t: PT System ID:.SLC On-lne Yes Safety Cass: I Exam 2: NWA Component ID: SLI I-F Program: LEt ASMECategory:

B-4 ASSOCASME CATEGORY:

WA interval: 3 Period: 3 Comments: None

==

Description:==

ClrcumlerenUail Weld. Plpe to Elbow Isometric:

ISI-SLCtPART 4 Location:

ASME etem: B9.40 Non. Di.: I.50 ASSOCASUEITEU:

WA CalBlock 1: WA Outag*: 7 Px BLDG 25Z ThIckness:.200' Exam 1:

PT System ID: SLC On-ilne Yes Safety Class: I Exam 2: WA

I Edwin53ray - RFO-23 ISI Plan.rtf Page 661i

  • 0 bO*JOL lid C.rnUl; Oa.

D:______

Date:_______

Page 33 of35

&,pelyIaor. Code Programs (a. C. Girrohf)...

'i-C-w.

, C.

I",-

I I -awinpuray - ki-0i-28~ ISI ilan.m Page 671 RFO-23 Total Scope - ISI Monday, September23 2002 Component IO: SLt1-F7 Program: IS' ASMECafegor B-J ASSOCASMECATEGORY:

NWA Interval: 3 Period: 3 Comments: None Component ID: SLC4i47 Program: MI ASME Catehory F-A ASSOC ASME CATEGORY: WA Interval: 3 Period: 3 Comments: None

==

Description:==

Cirnumferensal Weld. Ebow to FPpe Isometric:

ESI-SLC-PART4 Location:

ASMEItem:

89.40 Nom Dia.: 1.50' ASSOC ASMEITEtM:

NA Cal Block 1: N/A Outage: 7 RxBLDG 25Z Thickness:.200 Exam 1: PT System ID. SLC On-rlin Yes Safty Class: I Exam 2: N/A System ID: SLC On-rlne Yes Safety cass: 1 Exam 2: NIA

==

Description:==

Restraint Isometric: ISI-SLC-PART4 ASUE hem: Ft 10 No ASSOCASUEfITEU:

WA Cal Outage: 7 m Dl.: N/A I Block 1: N/i Location:

Rx BLDG 252 Thickness: N/A A

Exam 1:

VT.3 Component ID:, H-P-7IA Program: iS ASUECategorC F-A ASSOC ASME CATEGORY: N/A Interval: 3 Period: 3 Comments: None Component ID: t-P-a-IA Program: 2El ASUECategory:

F-A ASSOC ASE C4TEGORY:

-A nternal: 3 Period: 3

==

Description:==

Cornponent Support (SW Pump P-7-IA)

Isometric:

EtI-SW-PART 3 SHZ l ocatton:

INTAKE 23r ASiE Item: Ft.40 Nom DIa t WA Thickness: N/A ASSOCASMEITEht:

WA Cal Block 1: NWA Exam 1: VT-3 Outage: 7

==

Description:==

Component Support Integral Alladment (SW Pump P4I--A)

Isometric: El1-SW-PART2SH4 Location:

NECR 23Z ASUEItebm:

F.t40 Nomr DUa-WA Thickness: N/A ASSOCASMEfTElt:

D1.30 Cal Blockl: N/A Exam1: VT-3 Outage: 7 Sysbtm ID: SW On-line Yes Safety Class: 3 Exam 2: NWA System [D: SW On-line Yes Safety Cass: 3 Exam 2: VT-1 Comments: Refer to Code Cae N-S09 for D-A Category. VT-3 and VT-I tcheduled durtg RFO-23 a

I E-dwinj3ray - RFO-23 ISI Plan.rtf Page 681 ISI Codin ftor (D. 8 King):.

Oato:,

Page 34 of.3 Supervfsor. Code Programs (D. C Glnolr):

Dato:_

-RFO-3iS;1 PIan rff Page69 RFO-23 Total Scope -ISI MondaSeptember23 2002 Component ID: I+S-3-1A

==

Description:==

ComponentSupport.ntegralAttasnment(SWStrainerS IA)

System ID: SW Program:

ISI Isometric:

S-SW-PART 3 SHI Loc1tion:

INTAKE 23r On-tine Yes ASUE Category:

F-A ASMEH em:

FIAO Nonm ia.: WA Thickness: WA Safety Class: 3 ASSOCASMECATEGORY:

D-A ASSOCASMEITEM,:

D1.20 Cal Block 1: WA Exam 1:

VT-3 Exam 2: VT-I lnterval: 3 Period: 3 Outage: 7 Comments: Refer to Code Case N-509 ter D-A Category. VT-3 only sedreuled during RFO-23 ISi CoordInator (D. B. King):

P80* 35 o`33

F_-I.. ~

s

-~

a, 2 i,3_

E!;dwin Gray - ir-u-zj ISI rian.rt Page 7I0 Supervisor - Code Pcgranms (t C. Gfrrow):

Date: