E-mail from L. Lukens of Vermont Yankee to VY All Users, Regarding Inservice Testing Program, PP7013, Rev 12
ML042090182
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/24/2003
From: Lukens L
Entergy Nuclear Vermont Yankee
To:
- No Known Affiliation, Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0267
Download: ML042090182 (6)


Text

Sienel, Beth From: Lukens, Larry Sent: Tuesday, June 24, 2003 11:28 AM To: VTY - All Users

Subject:

Inservice Testing Program, PP 7013, Rev. 12 Revision 12 of the IST Program Procedure, PP 7013 has been issued, with an effective date of 6/24/2003. This revision incorporates Revision 20 of the IST Program Plan. This revision also accompanies the cancellation of AP 0054. All IST Program information is now contained in PP 7013.

A summary of the changes to the program procedure and the program plan is attached.

Program Plan, kppxRev 20 chang...

PP 7013, Rev. 12 is located at Controlled Doc.Library\Plant Procedures PDF Conversions The current Bases for pumps and valves may be found as pdf files in vyshared1\public\IST\4th Ten Year Interval\Third Interval. The folder'Bases, Third Interval" contains the Bases for pumps and valves. The Third Interval folder also contains a list of all components listed in the Bases, and a Cross-Reference of IST components and test procedures.

If you don't find what you are looking for, please do not hesitate to contact me. If you need a special report concerning components in the IST Program, I either have it already or I can generate it quickly.

Lany L. D. Lukens, Sr Engineer Plant IST Coordinator Entergy Nuclear Vermont Yankee llukens~entergy.com (802) 451-3131 1 W

I-Appendix A (continued)

Vermont Yankee Nuclear Power Station Third Ten-Year Interval Inservice Testing Program Revision 20 Revision Summary Revision Affected Summary Number Pages Revision 20 Complete rewrite and Revision 20 accompanies the retirement of AP 0054, the reformat, affecting all streamlining of PP 7013, and the incorporation of IST Program sections Implementation requirements into the IST Program Plan document, Appendices A and B of PP 7013.

There are 3 major sections in Appendix A: Section 1, General; Section 2, Pump Testing Program; and Section 3, Valve Testing Program.

Appendix B of PP 7013 contains Valve Table Notes, CSJs, ROJs, and Relief Requests.

Revision 20 Tables 1-19 The Valve Test Tables, Tables 1-19 of PP 7013, are reorganized.

The Tables are now organized alphabetically by system abbreviation.

Revision 20 Appendix A, Section 11 The following previously %withdrawnPump Relief Requests (RR-Pxx) were deleted from the Pump IST Program to reduce the number of unnecessary pages:

RR-P07 RR-P08 Revision 20 Appendix B, CSJs The following previously withdrawn Valve Cold Shutdown Justifications (CSJ-Vxx) were deleted from the.Valve IST Program to reduce the number of unnecessary pages:

CSJ-V02 CSJ-V03 CSJ-V05 CSJ-V07 CSJ-V09 CSJ-VI I CSJ-VI2 CSJ-V13 CSJ-V16 CSJ-VI7 CSJ-VI8 Appendix A PP 7013 Rev. 12 Page 15 of 109

Appendix A (continued)

Vermont Yankee Nuclear Power Station Third Ten-Year Interval Inservice Testing Program Revision 20 Revision Summary Revision Affected Summary Number Pages Revision 20 Appendix B, ROJs The following previously withdrawn Valve Refueling Outage Justifications (ROJ-Vxx) were deleted from the Valve IST Program to reduce the number of unnecessary pages:

ROJ-VOI ROJ-V02 ROJ-V09 ROJ-V10 ROJ-V13 ROJ-V 17 ROJ-V 18 ROJ-VI9 ROJ-V20 ROJ-V28 ROJ-V30 ROJ-V3I ROJ-V32 ROJ-V34 Revision 20 Appendix B, Relief The following previously withdrawn Valve Relief Requests (RR-Requests Vxx) were deleted from the Valve IST Program to reduce the number of unnecessary pages:

RR-VOI RR-V02 RR-V04 RR-V05 RR-V06 RR-V07 RR-V09 RR-VI0 RR-Vl I RR-V12 RR-V16 Appendix A PP 7013 Rev. 12 Page 16 of 109

Appendix A (continued)

Vermont Yankee Nuclear Power Station Third Ten-Year Interval Inservice Testing Program Revision 20 Revision Summary Revision Affected Summary Number Pages I

Revision 20 Valve Test Tables for The following relief valve and vacuum breaker test requirements all systems containing and commitments were expanded to include all Code-required safety or relief valves. tests:

PSV-NG-34A, B SR-14-20A, B SR-72-6A, B, C, D SR-78-3A, B RV19-232A, B SR-23-34 SR-23-66 SR-SACC-IA-I SR-SACC- I A-2 SR-SACC-1 B-I SR-16-19-77 SR-72-1 SR-72-1OA, B RV-2-71A, B, C, D SV-2-70A, B RV-70-117A SR-70-1A, B SR-70-6A, B SR-13-25 SR-13-26, SR-13-27 RV-20-82A RV-20-94A SR-10-36A, B SR-10-40 SR-10-72A, B, C, D SR-10-80A, B SR-10-86A, B SR-72-3A, B SR-1I-39A, B RV70-260A, B SR-70-13A, B, C, D SR-70-16A, B SR-70-2A, B These changes are administrative. Since the relief valve test procedures OP 4200, OP 4201, and OP 4261 already perform these tests, no changes to those procedures are required to implement this administrative change.

Revision 20 Appendix B, ROJs Withdrew and deleted ROJ-V02. The Class I SRVs are Category C. The ROJ stated that it was for clarification only, and no clarification is needed. Therefore, the ROJ provided no value.

Appendix A PP 7013 Rev. 12 Page 17 of 109

Appendix A (continued)

Vermont Yankee Nuclear Power Station Third Ten-Year Interval Inservice Testing Program Revision 20 Revision Summary Revision Affected Summary Number Pages Revision 20 Valve Test Tables for Reassigned the following EFCVs from NB to HPCI, consistent NB and HPCI with EMPAC:

SL-23-37A, B, C, D Revision 20 Valve Test Tables Revised test commitments for the following valves, in accordance with the Bases in the IST Component Database, which see for the basis for the change:

Valve From To SSC-23-13 CD-RO SC-RO SSC-23-13 n/a SO-Q V23-18 SC-CS; SO-CS D&E-RO V23-56 CD-RO SO-Q V23-56 n/a SC-RO V72-918C SC-RO SC-OC V72-918E SC-RO SC-OC V70-28 SC-RO SC-OC SSC-13-10 CD-RO SC-RO V13-38 n/a SC-RO V10-57 Category A Category B VI0-66 Category A Category B V70-413 SC-RO SC-OC V70-413 SO-RO SO-OC V70-92A SC-RO SC-OC V70-92B SC-RO SC-OC Revision 20 Appendix B, Valve The following Valve Table Notes were deleted. They are Table Notes redundant to CSJs, ROJs, or Relief Requests: 6, 7, 11, 12, 13, 14,

&23.

Revision 20 Section 1-11.6 Incorporate commitment UND-2002-206_03 - Add relief valve grouping criteria to the IST program plan.

Revision 20 Valve Test Tables for Incorporate commitment UND-2002-205_02 - Make testing HPCI, RCIC consistent for SSC-23-13; SSC-13-10; V23-56; V13-38.

Revision 20 Section 1-6 Incorporate commitment ER-2002-2019_02 - Determine the appropriate division of responsibility and issue changes to AP 0054; OP 4261; PP 7013; and PP 7204.

Revision 20 Section 1-9.3 Incorporate commitment ER-2003-0441_01 - Incorporate the Code provision for retest in accordance with OM-10 (4.2.1.9) into the IST program.

Appendix A PP 7013 Rev. 12 Page 18 of 109

Appendix A (continued)

Vermont Yankee Nuclear Power Station Third Ten-Year Interval Inservice Testing Program Revision 20 Revision Summary Revision Affected Summary Number Pages Revision 20 Valve Test Tables for Changed LJ-2Y to LJ-RO and changed LT-2Y to LT-RO for CAD, CRD, HPCI, IA, certain valves that have RFO requirements satisfied by a leak rate NB, NM, PCAC, test.

RBCCW, RCIC, RHR Revision 20 Valve Test Tables for Changed Program commitment from "SC-RO; SO-RO" to HPCI, SW "D&E-RO" for check valves that are disassembled during RFO.

Changed HPCI V23-18 to "D&E-RO" because the method described in CSJ-V06 did not work in RFO-22, because V23-18 is a tilting disc check valve.

Revision 20 Valve Test Tables for Changed SV, RV, and SRV sizes to inlet size only from "inlet x IA, NB outlet." Outlet size adds no value for IST.

Revision 20 Valve Test Tables for Corrected V72-109 from "check" to "ball check."

IA Revision 20 Valve Test Tables for Deleted testing for SRV tailpipe vacuum breakers NB SR-2-14A, B, C, D in accordance with SCW 2000-0335J, DBD-CPS, and ER 1996-0076.

Revision 20 Valve Test Tables for Changed Program commitment for SB-16-19-1 IA, B from PCAC SP-6M to SP-Q, consistent with OP 4376 and VYOPF 4376.01.

Revision 20 Valve Test Tables for Revised Note on VIO-21B, D to delete extraneous information.

RHR Revision 20 Valve Test Tables for Deleted "FST-Q" from FCV-104-28A, B. They are skid-SW/RHRSW mounted.

Revision 20 Valve Test Tables for Changed V70-92A, B from Normal=O to Normal=L.O. Changed SW/RHRSW Test commitment from SC-RO to SC-OC, since the valve is augmented and is not subject to OM-10 requirements.

Appendix A PP 7013 Rev. 12 Page 19 of 109