ML042080106
| ML042080106 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 05/18/2004 |
| From: | Wallin G Vermont Yankee |
| To: | Hoffman J Office of Nuclear Reactor Regulation, Vermont Yankee |
| References | |
| FOIA/PA-2004-0267 | |
| Download: ML042080106 (2) | |
Text
r r
=: 3rr iviAr ror KrVU 24.XIS Page-I of 1 Sienel, Beth From:
Wallin, Greg Sent:
Tuesday, May 18, 2004 2:18 PM To:
Hoffman, John Cc:
Sienel, Beth
Subject:
RE: SFP MAP For RFO 24.xis Attached is the map that has the current post-RF024 discharge fuel assemblies labeled in dark green on the legend and reflects the 136 discharged fuel assemblies also color coded on the pool map.
- Thanks, Greg
Original Message-----
From: Hoffman, John Sent: Friday, May 14, 2004 8:06 AM To: Sienel, Beth Cc: Card, John; Wallin, Greg
Subject:
RE: SFP MAP For RFO 24.xls Can you folks answer Beth's question?
The file I have is labeled as Post RF024 and has a 4/29/04 date.
Thanks.
Original Message-----
From: Sienel, Beth Sent: Thu 5/13/2004 09:46 To: Hoffman, John Cc:
Subject:
- John, What timeframe in the outage is this? Is it after refueling was completed? I noticed that there are bundles shown (and color coded) on the map in locations where the new fuel (yellow) and ones to be reinserted into the core (green) were stored. I didn't think any changes to the original load schedule were made during the outage.
- Thanks, Beth
Original Message-----
From: Hoffman, John Sent: Wednesday, May 12, 2004 2:18 PM To: Sienel, Beth; Pelton, David
Subject:
SFP MAP For RFO 24.xls 40 6/15/2004
i; a
I 1.
-- m-7 7 p
-I-slXll -
lard l t1-t i
1-6i 1-i, 4.
IWi I Wl V 5-E3 -
_z _
m _
_E_
4" I
1-4
'E35'ilEH 1^5H IL-;i
- r-l
_:I-I--IlPlrSllff
_ =E F
n
. 7 Ci_
g
_ _ ! e w _
Be
=iC_
AW=
-e_,_--
!I? --- do I-i
=-lt1IZ
-E ii I
I I
ES I I