Text

Commifted to NKewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC July 6, 2004 NRC-04-072 RIS 2004-10 10 CFR 55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Response To Regulatory Issue Summary 2004-10 Regulatory Issue Summary (RIS) 2004-10, "Preparation and Scheduling of Operator Licensing Examinations," was issued on June 14, 2004. The RIS requested that within 30 days, licensees voluntarily submit schedular information concerning examination preparation for calendar years (CYs) 2005 through 2008, initial operator license examinations for CYs 2005 through 2008, and generic fundamentals examinations in CYs 2005 and 2006.

Enclosed is a completed NRC Form 536 that provides the requested information for the Kewaunee Nuclear Power Plant.

I declare under penalty of perjury that the foregoing is true and accurate. Executed on July 6, 2004.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure (1) cc: Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 yti3OD

-'I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131/2005 (5-2003) Estimated burden per response to comply with this voluntary Informatlon collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICeNSING OPERATOR LICNSI cestimate o to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory w.,Commission. Washington. DC 20555-0001, or by Internet e-mall to EXAMINATION DATA lnfocollects@nrc.gov. and to the (3150-0131).

Regulatory Affairs, NEOB-10202, Desk Officer, Office OfficeofofManagement Information end and Budget, Washington. DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Kewaunee Nuclear Power Plant Docket No. 50-305 Region III License No. DPR-43 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR OPERATORS 2 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE Sept. 2005 Oct. 2007 ALTERNATEDATE Oct. 2005 Nov. 2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I'