Preparation and Scheduling of Operator Licensing Examinations
ML041960587
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 07/14/2004
From: Funderburk C
Dominion Resources, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-374, RIS-04-010
Download: ML041960587 (5)


Text

J u l y 14, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 1

Dominion DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE POWER STATION UNITS 2 AND 3 Serial No.:

04-374 NL&OS/MM Docket Nos.:

50-280/281 50-3381339 50-336/423 License Nos.: DPR-32/37/65 NPF-4/7/49 SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS NRC REGULATORY ISSUE

SUMMARY

2004-10 In response to NRC Regulatory Issue Summary 2004-10, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.

Very truly yours, Y

C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments

SN 04-374 Docket Nos. 50-2801281 50-3381339 50-336/423 Response to NRC RIS 2004-10 Page 2 of 5 cc:

U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-141 5 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St. SW, Suite 237-85 Atlanta, Georgia 30303-8931 Mr. V. Nerses NRC Sr. Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, MD 20852 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Page 3 of 5 CY 07 -

CY 06 -

CY 05 -

PROPOSED NUMBER ESTIMATED NUMBER OF 1

(Unit 3)

LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED SN 04-374 Docket Nos. 50-280/281/338/339/

Response to NRC RIS 04-10 336/423 CY 08 1

(Unit 2)

INRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION I APPROVED BY OMB: NO. 3150-0131 EXPIRES: 071311200 PROPOSED NUMBER ESTIMATED CANDIDATES NUMBER OF cy 05 cy 06 JUNE SEPTEMBER DECEMBEI MARCH JUNE SEPTEMBER DECEMBER MARCH 10 10 (Unit 3)

(Unit 2)

Estimated burden per response to comply with this voluntary informatic collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This tnformatton collectton IS used to plan budge and resources for operator examinations. Send comments regarding burde estimate to the Records Management Branch (T-6 E6), U S Nuclear Regulatol Commission, Washlngton, DC 20555-0001, or by internet e-mall t infocollects@nrc.gov, and to the Desk Officer, Office of Information an Regulatory Affairs, NEOB-10202. (3150-0131), Offlce of Management an Budget Washington DC 20503 If a means used to impose an informatic colledtbn does not d;sDlav a currently valid OMB control number, the NRC mz I

0 P E RAT0 R LICENSING EXAMINATION DATA not conduct or sponsoi, and a person is not required to respond to, th information collection.

NRC REGION FACILITY Millstone Power Station - Units 2 and 3 I

LICENSE EXAMINATIONS B. INITIAL OPERATOR PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8

(Unit 2) 8 (Unit 3)

I NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2

1 I

(Unit 3) 2 (Unit 2)

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2

(Unit 2) 2 (Unit 3)

NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I PROPOSED DATES 02/11/08 (Unit 2) 03/12/07 (Unit 3)

PRIMARY DATE 03/10/08 (Unit 2) 02/12/07 (Unit 3)

ALTERNATE DATE IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (5-2003)

PRINTED ON RECYCLED PAPER

Page 4 of 5 PROPOSED NUMBER SN 04-374 Docket Nos, 50-280/281/338 339/336/423 Response to NRC RIS 04-10 CY&

CY -

06 C Y E cy-EXPIRES: 07/31/200~

K C FORM 5 3 6 -

u?s. NUCLEARREGULATORY COMMISSION I APPROVED BY OMB: NO. 3150-0131 5-2003) 0 P E RAT0 R LICENSING EXAMINATION DATA Estimated burden per response to comply with this voluntary informatlo collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection IS used to plan budget and resources for operator examinations. Send comments regarding burde estimate to the Records Management Branch (T-6 E6), US. Nuclear Regulator Commission, Washington. DC 20555-0001, or by internet e-mail t infocollects@nrc.gov, and to the Desk Officer, Office of Information an Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management an' Budget. Washington, DC 20503.

If a means used to impose an informatioi collection does not display a currently valid OM6 control number, the NRC ma not conduct or sponsor. and a Derson is not required to respond to, thm information collection.

NRC REGION

'ACILITY North Anna Power Station I1 ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED I

ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED

~

B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 06 -

cy 05 -

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 12 I

I I

I I

NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3

I I

I I

I NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2

I I

I I

I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I

I I

I I

PROPOSEDDATES I

I I

I I 05/29/06 I

PRIMARY DATE I

I I ALTERNATE DATE I

06/0$/06 I

10 I

2 I

4 12/03/07 I

12/ 10/07

~

~

~

~

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PRINTED ON RECYCLED PAPER NRC FORM 536 (5-2003)

336/423 Page 5 of 5 Response to NRC RIS 04-10 EXPIRES 07/31/200f Estimated burden per response to comply with this voluntary informatlo collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This information collection IS used to plan budget and resources for operator examinations Send comments regarding burde estimate to the Records Management Branch (T-6 E6), U S Nuclear Regulator Commission, Washlngton, DC 20555-0001 or by internet e-mall t infocollects@nrc gov, and to the Desk Officer, Office of lnformatlon an Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management an Budget. Washington, DC 20503 If a means used to impose an informatlo collection does not display a currently valid OMB control number, the NRC ma not conduct or sponsor, and a person IS not required to respond to, th information collection NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 (5 2003)

OPERATOR LICENSING EXAMINATION DATA NRC REGION FACILITY Surry Power Station I1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08 -

CY 07 -

CY 06 -

CY 05 -

PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED NRC-PREPARED 1

1 B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 08 -

CY 07 -

CY 06 -

CY 05 -

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 9

8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3

4 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3

3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/23/06 02/ 11/08 ALTERNATE DATE 01 /30/06 02/18/08 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cy 05 cy 06 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEI ESTIMATED CANDIDATES NUMBER OF 12 PRINTED ON RECYCLED PAPER NRC FORM 536 (5-2003)