ML041960587
ML041960587 | |
Person / Time | |
---|---|
Site: | Millstone, Surry, North Anna |
Issue date: | 07/14/2004 |
From: | Funderburk C Dominion Resources, Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
04-374, RIS-04-010 | |
Download: ML041960587 (5) | |
Text
1 Dominion J u l y 1 4 , 2004 U.S. Nuclear Regulatory Commission Serial No.: 04-374 Attention: Document Control Desk NL&OS/MM Washington, D.C. 20555-0001 Docket Nos.: 50-280/281 50-3381339 50-336/423 License Nos.: DPR-32/37/65 NPF-4/7/49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE
SUMMARY
2004-10 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2004-10, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.
Very truly yours, Y
C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments
SN 04-374 Docket Nos. 50-2801281 50-3381339 50-336/423 Response to NRC RIS 2004-10 Page 2 of 5 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St. SW, Suite 237-85 Atlanta, Georgia 30303-8931 Mr. V. Nerses NRC Sr. Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station
Page 3 of 5 SN 04-374 Docket Nos. 50-280/281/338/339/
336/423 Response to NRC RIS 04-10 INRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION I APPROVED BY OMB: NO. 3150-0131 EXPIRES: 071311200 I Estimated burden per response to comply with this voluntary informatic collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This tnformatton collectton IS used to plan budge and resources for operator examinations. Send comments regarding burde 0PERAT0R LICENSING estimateto the Records Management Branch (T-6 E6),U S Nuclear Regulatol Commission, Washlngton, DC 20555-0001, or b y internet e-mall t infocollects@nrc.gov, and to the Desk Officer, Office of Information an EXAMINATION DATA Regulatory Affairs, NEOB-10202. (3150-0131), Offlce of Management an Budget Washington DC 20503 If a means used to impose an informatic colledtbn does not d;sDlav a currently valid OMB control number, the NRC mz not conduct or sponsoi, and a person is not required to respond to, th informationcollection.
FACILITY NRC REGION Millstone Power Station - Units 2 and 3 I PROPOSED NUMBER -
CY 05 -
CY 06 -
CY 07 CY- 08 ESTIMATED NUMBER OF 1 1 LICENSEE-PREPARED EXAMINATIONS (Unit 3) (Unit 2)
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS I 8 (Unit 3) 8 (Unit 2)
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 1 I 2 (Unit 3) 2 2
(Unit 2) 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE (Unit 3) (Unit 2)
NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES I
03/12/07 02/11/08 PRIMARY DATE (Unit 3) (Unit 2) 02/12/07 03/10/08 ALTERNATE DATE (Unit 3) (Unit 2)
IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cy 05 cy 06 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEI ESTIMATED 10 10 NUMBER OF (Unit 3) (Unit 2)
CANDIDATES NRC FORM 536 (5-2003) PRINTED ON RECYCLED PAPER
SN 04-374 Docket Nos, 50-280/281/338 Page 4 of 5 339/336/423 Response to NRC RIS 04-10 K C FORM 5 3 6 - u?s.NUCLEARREGULATORY COMMISSION IAPPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/200~
5-2003) Estimated burden per response to comply with this voluntary informatlo collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection IS used to plan budget and resources for operator examinations. Send comments regarding burde 0PERAT0R LICENSING estimate to the Records Management Branch (T-6 E6), U S . Nuclear Regulator Commission, Washington. DC 20555-0001, or by internet e-mail t EXAMINATION DATA infocollects@nrc.gov, and to the Desk Officer, Office of Information an Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management an' Budget. Washington, DC 20503. If a means used to impose an informatioi collection does not display a currently valid OM6 control number, the NRC ma not conduct or sponsor. and a Derson is not required to respond to, h tm information collection.
'ACILITY NRC REGION North Anna Power Station I1 PROPOSED NUMBER CY& CY- 06 C Y E cy-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I B. INITIAL OPERATOR LICENSE EXAMINATIONS
~
PROPOSED NUMBER cy- 05 Cy- 06 I
NUMBER OF REACTOR OPERATORS 12 10 I I I I NUMBER OF SENIOR REACTOR OPERATORS - INSTANT I
I I
I I
3 2 I
NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I
I I
I I
2 4 I
NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I
I I
I I
PROPOSEDDATES I
I I I I PRIMARY DATE I
I I
I 05/29/06 12/03/07 I
ALTERNATE DATE I 06/0$/06
~
C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE
~
12/ 10/07
~ ~
I NRC FORM 536 (5-2003) PRINTED ON RECYCLED PAPER
Page 5 of 5 336/423 Response to NRC RIS 04-10 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 07/31/200f (5 2003) Estimated burden per response to comply with this voluntary informatlo collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This information collection IS used to plan budget and resources for operator examinations Send comments regarding burde estimate to the Records Management Branch (T-6 E6), U S Nuclear Regulator OPERATOR LICENSING Commission, Washlngton, DC 20555-0001 or by internet e-mall t infocollects@nrc gov, and to the Desk Officer, Office of lnformatlon an EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management an Budget. Washington, DC 20503 If a means used to impose an informatlo collection does not display a currently valid OMB control number, the NRC ma not conduct or sponsor, and a person IS not required to respond to, th informationcollection FACILITY NRC REGION Surry Power Station I1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER -
CY 05 -
CY 06 -
CY 07 -
CY 08 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 1 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 05 -
CY 06 -
CY 07 -
CY 08 NUMBER OF REACTOR OPERATORS 9 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 4 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/23/06 02/ 11/08 ALTERNATE DATE 01/ 3 0 / 0 6 02/18/08 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cy 05 cy 06 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEI ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (5-2003) PRINTED ON RECYCLED PAPER