Notice of Meeting with Nebraska Public Power District Confirmatory Action Letter 4-03-001 for Cooper Nuclear Station
ML041940415
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/12/2004
From:
NRC Region 4
To:
References
CAL-4-03-001
Download: ML041940415 (4)


Text

July 12, 2004

SUBJECT:

MEETING WITH NEBRASKA PUBLIC POWER DISTRICT FACILITY:

Cooper Nuclear Station DOCKET:

50-298 DATE AND TIME:

August 18, 2004 12 noon (CDT)

LOCATION:

NRC Region IV Office Training Conference Room 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 PURPOSE:

The purpose of this meeting is to discuss the results of the licensees self-assessment of their progress in completing the actions of NRC Confirmatory Action Letter 4-03-001 issued on January 30, 2003.

CATEGORY:

This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS:

NRC B. Mallett, Regional Adminstrator A. Howell, Director, Division of Reactor Projects (DRP)

D. Chamberlain, Director, Division of Reactor Safety (DRS)

K. Kennedy, Chief, Project Branch C, DRP J. Clark, Chief, Engineering and Maintenance Branch, DRS W. Walker, Senior Project Engineer, Project Branch C, DRP S. Schwind, Senior Resident Inspector, DRP M. Honcharik, Project Manager, Office of Nuclear Reactor Regulation

Nebraska Public Power District LICENSEE R. Edington, Vice President-Nuclear and CNO S. Minahan, General Manager, Plant Operations J. Roberts, Director of Nuclear Safety Assurance G. Kline, General Manager Engineering MEETING CONTACT: Kriss M. Kennedy, NRC, RIV 817-860-8144 KMK@NRC.gov cc:

Randall K. Edington, Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Clay C. Warren, Vice President of Strategic Programs Nebraska Public Power District 1414 15th Street Columbus, NE 68601 John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, NE 68602-0499 P. V. Fleming, Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305

Nebraska Public Power District Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, MO 65101 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, IA 50309 William J. Fehrman, President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321

Nebraska Public Power District E-Mail To:

( )

NRC Attendees PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT JWC1 J. Craig, Associate Director for Inspections & Programs OEMAIL D/OE RLF2 R. Franovich, NRR Enforcement Coordinator TXR T. Reis JLD J. Dixon-Herrity, RIV EDO Coordinator MCH3 M. Honcharik, Project Manager, NRR VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES JAC1, CJG RA Secretaries LAO, DLF, MJS DRP Division LMB, NLH, JLH2 DRS Division CMS, JAK, BST1 DNMS Division JLP J. Pellet, IRM LPL P. Longdo ADAMS:  Yes

 No Initials: __wcw___

 Publicly Available  Non-Publicly Available Sensitive  Non-Sensitive R:\\_CNS\\2004\\CN8-18-04MN-DRP.wpd RIV:SPE:DRP/C PAO RSLO C:DRP/C WCWalker;df VLDricks WAMaier KMKennedy

/RA/

/RA/

/RA/

/RA/

6/30/04 6/30/04 6/30/04 7/12/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax