ML041880253

From kanterella
Jump to navigation Jump to search
D.C. Cook Re Announcement of Baseline Inspection
ML041880253
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/06/2004
From: Anton Vegel
Division of Reactor Safety III
To: Nazar M
American Electric Power Co
References
Download: ML041880253 (6)


Text

July 6, 2004 Mr. M. Nazar Senior Vice President and Chief Nuclear Officer Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 ANNOUNCEMENT OF BASELINE INSPECTION

Dear Mr. Nazar:

On September 13, 2004, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Donald C. Cook Nuclear Power Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedures IP 71111.02 and IP 71111.17.

Experience has shown that these baseline inspections can be resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office by no later than August 23, 2004. The inspection team will review this information and, by August 30, 2004, will request specific items that should be available for review when the team arrives on site. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents in Group II(1) will be requested for review in the Regional Office the week prior to the inspection, i.e., in the office by September 7, 2004. The remaining documents should be available by the first day of the on-site inspection, September 13, 2004. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our regulatory contact for this inspection is Mr. Rich Meister and the technical contact is Dean Baker of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9726 or via e-mail at AXD7@nrc.gov.

M. Nazar In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Anton Vegel, Chief Systems Engineering Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available Onsite During Inspection) cc w/encl:

J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists

M. Nazar In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Anton Vegel, Chief Systems Engineering Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available Onsite During Inspection) cc w/encl:

J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists ADAMS Distribution:

WDR DFT JGL1 RidsNrrDipmIipb GEG HBC BJK1 DRPIII DRSIII PLB1 JRK1 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041880253.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME PLougheed:tr EDuncan AVegel DATE 07/06/04 07/06/04 07/06/04 OFFICIAL RECORD COPY

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Enclosure 1

Inspection Report: 05000315/2004011(DRS); 05000316/2004011(DRS)

Inspection Dates:

September 13 through 17, 2004 Inspection Procedures:

IP 71111-02, Changes, Tests, or Experiments IP 71111-17, Permanent Plant Modifications Lead Inspector:

A. Dunlop (630) 829-9726 Team Members:

B. Jose G. O'Dwyer I.

Information Requested for In-Office Preparation Week The following information is requested by August 23, 2004, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The team will select specific items from the information requested below and submit a list to your staff by August 30, 2004. We may also request that certain items be made available to the regional office during the week prior to the inspection, i.e., by September 7, 2004. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last Permanent Modification inspection exit (September 2002) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible. All information should be sent electronically, if at all possible to AXD7@nrc.gov.

(1)

List of "permanent plant modifications" to risk significant systems, structures or components. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, design information transmittals, engineering evaluations, equivalency evaluations, suitability analyses, modifications, commercial grade dedications and any other plant specific documents used to affect changes to plant systems, structures or components.)

The list should be sorted by the number of each document and the type of document. The list should include the title, the revision (or date), the affected system, and, if at all possible, the risk significance of the modification. In addition to the list, please provide a brief (one paragraph) description of each modification and a list of associated calculations and affected procedures.

NOTE: The team specifically requests any modifications associated with the essential service water system, including associated heat exchangers.

(2)

List of all 10 CFR 50.59 completed evaluations involving: (a) changes to the facility (modifications); (b) procedure revisions; (c) non-routine operating

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Enclosure 2

configurations; (d) tests or experiments; (e) departures in methods of analyses; or (f) any other evaluations done pursuant to 10 CFR 50.59 for any reason.

The list should be sorted by the document number and should contain the title of each document, as well as the the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3)

List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) changes to the facility (modifications); (b) procedure revisions; (c) non-routine operating configurations; (d) tests or experiments; (e) departures in methods of analyses; or (f) any other screenings done pursuant to 10 CFR 50.59 for any reason.

The list should be sorted by the document number and should contain the title of each document and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4)

List of any modifications, procedure revisions, UFSAR changes, tests or experiments where it was determined that 10 CFR 50.59 did not apply.

(5)

List of corrective action documents (open and closed) that address permanent plant modification or 10 CFR 50.59 issues, concerns, or processes.

The list should be sorted first by in order of significance and then by the document number and should contain the title and revision (or date) of each document, the affected system and corresponding documentation (if applicable).

NOTE: The team will be specifically following up on the following condition reports: 02242032, 02242029, 02240066, and 04029036.

(6)

List of any modifications performed "at risk" (i.e., without all engineering paperwork being completed).

(7)

Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates.

(8)

Name(s) and phone numbers for the regulatory and technical contacts.

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Enclosure 3

II.

Information Requested to be Available the Week Prior to Inspection or on First Day of Inspection (1)

Copies of items which will be selected from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings and any corrective action documents.

Some items may be requested to be transmitted to the NRC during the preparation week (i.e., by September 7, 2004), the remainder is to be available in the inspection area when the team arrives on site on September 13, 2004.

(2)

Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

Updated Final Safety Analysis Report; (NOTE: The inspectors currently have Revision 18 on CD Rom; if a later revision exists, please contact the lead inspector.)

Technical Specifications; Latest IPE/PRA Report; Vendor Manuals; and The latest 10 CFR 50.59 UFSAR update submittal.

(3)

Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

Drawings supporting the modifications; Calculations associated with the modifications; Procedures affected by the modifications; and UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4)

Current management and engineering organizational chart.

III.

Information Requested to be provided throughout the inspection (1)

Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

(2)

Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.