Letter Sequence Other |
---|
TAC:MC2299, Revision to RCP Flywheel Inspection Program - WCAP-15666 (Open) TAC:MC2300, Revision to RCP Flywheel Inspection Program - WCAP-15666 (Open) |
|
|
|
---|
Category:Technical Specifications
MONTHYEARML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML22307A0452023-11-17017 November 2023 Enclosure 1 - Amendment No. 297 to Rfl No. DPR-26 for Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements with Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML20297A3262020-11-23023 November 2020 Enclosure 2, Draft Conforming Amendments for Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20110A0052020-04-27027 April 2020 Correction to Amendment No. 267 Issued April 10, 2020, Changes to Technical Specifications for a Permanently Defueled Condition ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19072A1342019-03-15015 March 2019 Amended Provisional Operating License DPR-5, 3-22-2019 ML18212A1902018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix a ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B ML18212A1942018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix B ML18212A1952018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix C ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule NL-16-027, Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2016-03-0202 March 2016 Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement ML15349A7942016-02-23023 February 2016 Generation, Unit No. 2 - Issuance of Amendment Extension of the Containment Integrated Leak Rate Test to 15 Years NL-15-144, License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 ML15226A1592015-09-0303 September 2015 Issuance of Amendment Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML15110A0092015-05-26026 May 2015 Issuance of Amendment Re Implementation of Technical Specification Task Force Traveler 510, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection(Tac Nos. MF3752 & MF3753) ML15083A4902015-04-0202 April 2015 Issuance of Amendment Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems ML15028A3082015-03-13013 March 2015 Issuance of Amendment Extension of the Type a Containment Integrated Leak Rate Test Frequency from 10 to 15 Years NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years ML14265A3292014-09-24024 September 2014 Issuance of Amendment Temporary Change to Technical Specification 3.8.6 Battery 22 Surveillance Requirement (Exigent Circumstances) ML14287A2942014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual ML14198A1612014-09-0505 September 2014 Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (Tac No. MF3369) ML14169A5832014-07-17017 July 2014 Issuance of Amendment Revised Containment Integrity Analysis (Tac No. MF0591) NL-14-053, Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies2014-04-14014 April 2014 Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies NL-14-035, Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves2014-04-0101 April 2014 Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves ML14045A2482014-03-0505 March 2014 Issuance of Amendment Pressure-Temperature Limit Curves and Low Temperature Over Pressure Requirements NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 22014-02-24024 February 2014 Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 NL-14-001, Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair NL-14-001, Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications NL-12-039, Proposed License Amendment Regarding Atmospheric Dump Valves2012-05-23023 May 2012 Proposed License Amendment Regarding Atmospheric Dump Valves NL-12-002, Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications2012-01-11011 January 2012 Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-072, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2010-10-0606 October 2010 Proposed Technical Specification Change Regarding RWST Surveillance Requirement NL-09-167, Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time2009-12-15015 December 2009 Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time NL-09-129, Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-129, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-119, Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 32009-11-17017 November 2009 Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 3 ML0834304242009-05-29029 May 2009 License Amendment, Technical Specifications Regarding Removal of Spent Fuel from Unit 1 and Drain Down of the Spent Fuel Pool NL-08-137, Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-09-18018 September 2008 Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability ML0811401772008-06-0909 June 2008 Tec Specs to Amedment 236, License No. DPR-64 for Indian Point, Unit 3 ML0727805822007-10-0404 October 2007 Technical Specifications, Change of Pressure-temperature and Low Temperature Protection System Limits ML0722901282007-08-16016 August 2007 Technical Specifications 2023-12-05
[Table view] |
Text
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.3 Radioactive Effluent Controls Program (continued)
- j. Limitations on the annual dose or dose commitment to any member of the public, beyond the site boundary, due to releases of radioactivity and to radiation from uranium fuel cycle sources, to less than or equal to 25 mrem to the total body or any organ, except the thyroid, which shall be limited to less than or equal to 75 mrem.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency.
5.5.4 Component Cyclic or Transient Limit This program provides controls to track the UFSAR, Section 4.1, cyclic and transient occurrences to ensure that components are maintained within the design limits.
5.5.5 Reactor Coolant Pump Flywheel Inspection Program This program shall provide for the inspection of each reactor coolant pump flywheel using ultrasonic methods. The program shall include inspection frequencies and acceptance criteria. The inspection frequency will ensure that each reactor coolant pump flywheel is inspected at 20-year intervals. I 5.5.6 Inservice Testing Program This program provides controls for Inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
- a. Testing frequencies specified in Section Xl of the ASME Boiler and Pressure Vessel Code and applicable Addenda as follows:
ASME Boiler and Pressure Required Frequencies for Vessel Code and applicable performing inservice testing Addenda terminology for activities Inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days INDIAN POINT 2 5.5-5 Amendment No. 240
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)
- i. Limitations on the annual and quarterly doses to a member of the public from iodine-131, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and J. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the FSAR, Section 4.1.5. cyclic and transient occurrences to ensure that components are maintained within the design limits.
5.5.6 Reactor Coolant Pump Flywheel Inspection Program This program shall provide for the inspection of each reactor coolant pump flywheel. The program shall include inspection frequencies and acceptance criteria. The inspection frequency will ensure that each reactor coolant pump flywheel is surface and volumetrically inspected at 20-year intervals. I (continued)
INDIAN POINT 3 5.0 - 11 Amendment 221